Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
8 Jun 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW BANDIPORA
EXECUTIVE ENGINEER REW BANDIPORA
CONSTRUCTION OF GATE WITH PILLAR FOR BOYS PRIMARY SCHOOL HUMB MOHALLA LAHARWALPORA
2026_RDPR_310627_3
NIT03
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW BANDIPORA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹3,000
9 Jun 2026
23 May 2026
9 Jun 2026
23 May 2026
8 Jun 2026
23 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: all kinds of soil | 1.13 | Cum | 479.3 | ₹541.61 |
| 2 | Supplying and laying of Plums/Dry stone soling hand packed tightly including ramming, watering and filling of interstices including all carriages complete. | 0.11 | Cum | 1,686.4 | ₹185.5 |
| 3 | Providing and laying in position reinforced cement concrete of specified grade including curing but excluding the cost of centering and shuttering finishing and reinforcement . All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) complete all inclusive. | 2.63 | Cum | 7,104.35 | ₹18,684.44 |
| 4 | p/F of steel reinforcement including cuttin, bending, straightning etc | 95 | KG | 123.5 | ₹11,732.5 |
| 5 | Structural steel in tubular sections,fixed with or without connecting plates, including cutting ,hoisting,fixing and positioning and applying a priming coat of approved steel primer all complete | 710.02 | Kg | 138.5 | ₹98,337.77 |
| 6 | Brick work laid in 1:6 cement sand mortar using FPS bricks including all costs, carriages of 100 kms from Budgam complete job | 1.16 | Cum | 10,295 | ₹11,942.2 |
| 7 | Painting with synthetic enamel paint two or more coats on new work of approved brand and manufacture to give an even shade | 25.5 | Sqm | 131.85 | ₹3,362.17 |
| 8 | Contingency @ 1.5% | 1 | Job | 2,232 | ₹2,232 |
| 9 | Taking of photographs of size 125mm x200mm pre- execution, during execution and post completion and P/f of sign board. (3 No’s of each) | 1 | No | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_1004679.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .