Loading…
Loading…
Tender Value
₹94.2 L
EMD Value
₹1.9 L
Closing Date
27 Jul 2026, 3:00 pm4d left
Superintending Engineer Drainage Circle Ghaziabad
OFFICE OF SE DRAINGE CIRCLE, GHAZIABAD
Restoration and painting work of VRB from km 40.000 to km 55.006 of the parallel Deoband branch feeder channel in district Saharanpur
2026_UPIDC_1170818_3
04/SE/2026-27
Open Tender
Civil Works
Item Wise
120 days
ROORKEE
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹1.9 L
OFFICE OF SE DRAINGE CIRCLE, GHAZIYABAD
20 Jul 2026
20 Jul 2026
27 Jul 2026
20 Jul 2026
27 Jul 2026
20 Jul 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in dry ordinary soil(loam clay or sand) including lift upto 1.5 m and lead upto 30 m and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removel and disposal or surplus earth as directed by the engineer-in-charge upto a distance of 30m from the foundation trenches. | - | Cum | - | - |
| 2 | Earth work in cutting or in embankment in ordinary soil , excavation to be in the form of regular pits and earth work in embankment to be in 20cm layer, including ramming and dressing the surface to the requried levels and slopes and also including 1.50 M lift and 30m lead. ( in main canal) | - | Cum | - | - |
| 3 | I st Class Brick Work in 1:4 cement mortar upto 3m lift & 60m lead of materials i/c cost of all material, Labour, T&P, lead & Lifts etc. required for proper completion of work . | - | Cum | - | - |
| 4 | Dismantling old brick work and laying I st Class Brick Work in 1:4 cement mortar i/c cost of all material, Labour, T&P, lead & Lifts etc. required for proper completion of work . | - | Cum | - | - |
| 5 | I st Class Brick Work in 1:4 cement mortar in half brick thick wall upto 3m lift & 60m lead of materials i/c cost of all material, Labour, T&P, lead & Lifts etc. required for proper completion of work . | - | Cum | - | - |
| 6 | Struck deep cement pointing in 1:2 cement mortar on brick masonry i/c all material, labour, T&P etc complete: | - | Sqm | - | - |
| 7 | Providing & Laying M-10 (1:3:6) Cement Concrete including cost of all material , Labour , T&P, Mechnical Mixing & Vibration etc . For propper complition of work but excluding cost of reinforcement steel and Centering & shuttering. | - | Cum | - | - |
| 8 | Providing & Laying M-15 (1:2:4) Cement Concrete with 20mm nominal stone aggregate including cost of all material , Labour , T&P, Mechnical Mixing & Vibration etc . For propper complition of work but excluding cost of reinforcement steel and Centering & shuttering. | - | Cum | - | - |
| 9 | Providing & Laying M-20 (1:1.5:3) Cement Concrete with 20mm nominal stone aggregate including cost of all material , Labour , T&P, Mechnical Mixing & Vibration etc . For propper complition of work but excluding cost of reinforcement steel and Centering & shuttering . | - | Cum | - | - |
| 10 | Providing & Laying M-25 (1:1:2) Cement Concrete in Wearing Coat including cost of all material , Labour , T&P, Mechnical Mixing & Vibration etc . For propper complition of work but excluding cost of reinforcement steel and Centering & shuttering. | - | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
Tendernotice_2.pdf
PDF • 0.18 MB
BookletTender04SELot03.pdf
Tender Documents • 1.92 MB
BOQ_2197311.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].