Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹28.0 L
EMD Value
₹55,916
Closing Date
27 Apr 2026, 3:00 pmClosed
Executive Engineer WD-I
o/o Executive Engineer WD-I DDW, St. Inez, Panaji
Repairs and alteration of chlorine room for 55 MLD Plant at Curti.
2026_DDW_28691_1
DDW/DI/ASW/04/26-27 Line1
Open Tender
Civil Works - Water Works
Percentage
240 days
Panaji
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,000
₹55,916
14 May 2026
15 Apr 2026
28 Apr 2026
15 Apr 2026
27 Apr 2026
15 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : | |||||
| 1.01 | a) All types of Ordinary rock including all types of laterite rock, blasting prohibited | - | Cu.m | - | - |
| 2Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | |||||
| 3Providing & laying cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: | |||||
| 3.01 | a) All works upto plinth level | - | Cu.m | - | - |
| 4Providing & laying cement concrete 1: 1.5: 3 (1 cement: 1.5 coarse sand: 3 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: | |||||
| 4.01 | a) All works upto plinth level | - | Cu.m | - | - |
| 5Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) | |||||
| 5.01 | a) All works upto plinth level | - | Cu.m | - | - |
| 6Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering shuttering finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) | |||||
stage.html
html • 0.02 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 1.32 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
Tendernotice_2.pdf
PDF • 0.24 MB
Tendernotice_3.pdf
PDF • 0.04 MB
BOQ_29130.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .