SE/CM/NCTPS-I
NCTPS-I Chennai-120
Replacement of existing damaged RCC cover slab into new precast cover slab in mill area and damaged drain into new RCC drain in front of Service Building western side and allied civil works at NCTPS_I.
2026_EB_672917_1
CE /NCTPS-I/SE/ CM/174/2025-26
Open Tender
Civil Works
Works
45 days
CE/NCTPS-1
Refer Tender Document
2 documents required · 2 mandatory
₹0
₹13,600
Yes
26 Mar 2026
10 Mar 2026
26 Mar 2026
10 Mar 2026
25 Mar 2026
10 Mar 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: CE/NCTPS-I
Name of Work: NCTPS–I - CM Circle – CM-I – Replacement of existing damaged RCC cover slab into new precast cover slab in mill area and damaged drain into new RCC drain in front of Service Building western side and allied civil works at NCTPS-I.
Contract No: CE/SE/CM/NCTPS-I/174/2025-26
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Scope of Work Item Code / Make Quantity Units HSN / SAC CODE Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE for Work portion in figures to be entered by the Bidder Rs. P BASIC RATE for Labour charges of Erection portion Rs. P BASIC RATE for consumables charges of erection portion Rs. P Packing & Forwarding Charges in percentage Freight & Insurance charges in precentage GST in percentage IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1 NCTPS–I - CM Circle – CM-I – Replacement of existing damaged RCC cover slab into new precast cover slab in mill area and damaged drain into new RCC drain in front of Service Building western side and allied civil works at NCTPS-I.
Providing and placing RCC 1:1.5:3 using 6 to 12mm HBG metal for precast cover slabs including cost of all materials, from work, curing ,transporting and placing in postion, lead, lift labour and mixing charges etc, complete., including the cost of reinforcement. a) Drain cover slab mill plant (0.30x0.80x0.075) Item 1 Nos Excess(+) Full Conversion INR
b) slab size(0.70x0.85x0.13 Item 2 Nos Excess(+) Full Conversion INR
c) Service building front western side slab size(0.45x1.20x0.20) Item 3 Nos Excess(+) Full Conversion INR
d) Service building front western side slab size(0.30x0.90x0.075) Item 4 Nos Excess(+) Full Conversion INR
e) Out door seating slab slab size(2.80x0.70x0.075) Item 5 Nos Excess(+) Full Conversion INR
f) Out door seating slab size(2.50x0.70x0.075) Item 6 No Excess(+) Full Conversion INR
Earth work excavating and disposing on bank with initial lead of 10m & initial lift of 2m inslush and silt under water upto 0.75m depth requiring the aid of basket and vessels(SS20B)including cost of all labour, lead, transporting ect., complete. Item 7 cum Excess(+) Full Conversion INR
Supplying and fixing of granite tiling of 18mm to 20mm thick with CM 1:3 including all materials, polishing, labour lead, lift, etc., complete. Item 8 sqm Excess(+) Full Conversion INR
Providing RTS rod including cost of all materials binding wire labour charges for cutting, binding, tying, placing in position, lead, lift etc., complete. Item 9 kgs Excess(+) Full Conversion INR
Providing RCC 1:2:4 using 12 to 20mm HBG metal including cost of all material labour, lead, lift, curing, cantering etc, complete and as per standard specification and site inspected Department Engineer at site. Item 10 cum Excess(+) Full Conversion INR
Providing PCC 1:4:8, using 40mm HBG metal including cost of all materials lead, lift, curing and labour etc., complete. Item 11 cum Excess(+) Full Conversion INR
Dismantling damaged bricks work and clearing away from the site including cost of labour, lead, lift, transporting etc., complete Item 12 cum Excess(+) Full Conversion INR
Brick work in Cm 1:5 mix using fly ash column bricks, included cost of all materials, labour, lead, lift, transporting charges, finishing, curing etc., complete as directed by the engineer at the site. Item 13 cum Excess(+) Full Conversion INR
Plastering in CM 1:5, 12mm thick including cost of all materials, lead, lift, labour, curing etc., complete. Item 14 sqm Excess(+) Full Conversion INR
Painting one coat of white cement washing over cement plastered surface including cost of all materials, labour, lead, lift etc., complete. Item 15 sqm Excess(+) Full Conversion INR
Painting the existing wall surface with two coats of Exterior emulsion paint approved colour and quality including cost of all materials, labour, lead, lift, scaffolding charges etc., complete. Item 16 sqm Excess(+) Full Conversion INR
Providing & fixing Aluminium Hydraulic door closer of approved quality using Aluminium Extraded section body tubular type universal hydraulic door closer with double speed adjustment (with ISO monogram and all materials lead lift, labour T&P etc, complete. Item 17 Nos Excess(+) Full Conversion INR
Repairing of aluminium door and refixing the same materials with new 5.5mm thick glass, rubber beeding, woolem felt, screws to its required position after cleaning of all sections. The rates includes of the cost of all labour accessores, transporting, lead, lift T&P etc., complete and as directed by the Engineer at site. Item 18 sqm Excess(+) Full Conversion INR
Supplying and fixing in position Anodized sliding glazes window in two tracks with frame bottom gutter. 61.85x37mmx1.055 kg/m & side/top 62x29.5mmx0.695kg/m ans shutter lock, 39x20mmx0.605kg/m, bottom 41x20mmx0.355kg/, side/top 39x20mmx0.488kg/m, 5mm thick plain glass, ruber beading, centre lock etc including the cost of all materials, labour ,lead, lift complete. Item 19 sqm Excess(+) Full Conversion INR
Charges for fixing in position C.I manhole covers(light or heavy duty) of various sizes including cost of all materials, labour, lead, lift, etc., complete. Item 20 Nos Excess(+) Full Conversion INR
Dewatering of drain duct by suitable pump during construction period, clean and discharge water percolation to designated disposal area including cost of labour, hire charges, transportation etc., complete as directed by engineer at site. Item 21 Days Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_808722.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .