| 1 | L1₹3.1 LAccepted-Finance DHARAM KHOR BABU BHATNI BHATARPUR RANI DEORIA U P 274705 | DEORIA | DEORIA | UTTAR PRADESH | 274705 | ₹3.1 L | L1 | Accepted-Finance Quoted rate is lowest |
| 2 | L2₹3.2 LRejected-Finance | ₹3.2 L | L2 | Rejected-Finance Quoted rate is on higher side |
| 3 | L3₹3.5 LRejected-Finance | ₹3.5 L | L3 | Rejected-Finance Quoted rate is on higher side |
| Sl No | Description | Qty | Unit | ARK ENGINEERING L2 | R.T.K POWER ENGINEERS L1 | M/s. AKHYA ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00The following works are carried out for Replacement of Gaskets of 40MVA T/F-II (NGEF make) alongwith other associated Works at 132KV Sub Station Naugarh, with all Cost of Men, Misc. Consumables, Crane / Hydra, Centrifuging Machine, Normal & Special T&Ps, etc. Required for Satisfactory Completion of the Job, as per Technical Specifications & Direction of the Supervising Engineer, as per Details below : | ||||||
| 1.01 | Carriage of 20/40 KL empty oil tank for the centrifuging of T/F oil where it is available within distance of 50 Km Approx. including carefully loading empty oil tank at 220KV Substation Bansi & unloading at 132KV Substation Naugarh. | 1 | Job | 25,250 ₹25,250 | 25,000 ₹25,000 Lowest | 29,900 ₹29,900 |
| 2.00 | Removal of Jumpers of HV & LV side Bushings of the Transformer. The Scope of Work Involves Opening of Bolts & Nuts and Removal of Jumpers, Bushing Clamps etc. | 1 | Job | 4,500 ₹4,500 | 4,200 ₹4,200 Lowest | 5,000 ₹5,000 |
| 3.00 | Complete Draining of the T/F Oil from the 40MVA Transformer - II (NGEF make) into Oil Tanker / Oil Drums and Stacking them at Proper Place. | 16,590 | Lit. | 0.25 ₹4,147.5 | 0.2 ₹3,318 Lowest | 0.5 ₹8,295 |
| 4.00 | Complete Dismantling of the 40MVA Transformer-II (NGEF make). The Scope of Work Involves Dismantling of HV / LV / Neutral Bushings, Turrets, Radiators, Conservator Tank, Explosion Vent Pipe, Buchholz Relay, Oil Pipe Lines, Flanges, Valves, Cooling Fans etc. along with Opening of associated Electrical Connections, Stacking of all the Dismantled Parts at Proper Place in the Switchyard including Proper Blanking of the Open Points before Replacement of Gaskets. | 1 | Job | 25,000 ₹25,000 | 24,700 ₹24,700 Lowest | 25,900 ₹25,900 |
| 5.00 | Complete Replacement of Gaskets of 40MVA Transformer-II (NGEF make). The Scope of Work Involves Removal of old / damaged Rim Gasket of Transformer's Top Cover and old / damaged gaskets of different Parts of the Transformer by Cleaning of Surfaces, Providing & Fabrication of Gaskets out of good Quality Rubberized Cork Sheet Gaskets of Konica / Troborze / Nu-Cork make having Temperature Bearing Capacity around 3800°C and Fixing the Gaskets with Adhesive at Rim & other Surfaces. | 1 | Job | 1,30,000 ₹1,30,000 | 1,25,000 ₹1,25,000 Lowest | 1,40,000 ₹1,40,000 |
| 6.00 | Cleaning of Transformer's Core and Winding by Hot Transformer Oil and Removing the Complete Sludge from Bottom by Flushing with Centrifuging Machine. | 1 | Job | 7,500 ₹7,500 | 7,000 ₹7,000 Lowest | 7,800 ₹7,800 |
| 7.00 | Complete Erection of 40MVA Transformer - I (NGEF make) by Erection of HV / LV / Neutral Bushings, Turrets, Radiators, Conservator Tank, Explosion Vent Pipe, Buchholz Relay, Oil Pipe Lines, Flanges, Valves, Cooling Fans etc. at its original Place and Complete Evacuation of Main Tank of the Transformer and filling of Dry Nitrogen / Dry Air of Dew Point -50°C or better in Vacuum upto Pressure of 0.25Kg/cm² and the again Evacuating the Transformer Tank after Required Time Interval (approx. 12 Hrs.) using Centrifuging Machine. The Scope of Work Involves Measuring Due Point Values of N2 after every Cycle till the Required Value is Achieved. | 1 | Job | 40,000 ₹40,000 | 38,900 ₹38,900 Lowest | 41,850 ₹41,850 |
| 8.00 | Centrifuging of Oil filled in Oil Tanker, Un-Interrupted till the desired BDV Value of the Oil is Achieved, Filling of Transformer Oil into Main Tank and Radiators from Oil Tanker, then Centrifuging & Circulation of the Oil in Transformer, Un-Interrupted till the Desired BDV Values of the Oil & IR Values are Achieved including Recording of all the Parameters such as Temperature, Vacuum, Insulation Resistance etc. every 2 Hours. Centrifuging Machine, its Operator, all associated T&Ps etc. shall be Arranged by the Contractor at his Own Cost. | 22,000 | Lit. | 1.8 ₹39,600 | 1.78 ₹39,160 Lowest | 2 ₹44,000 |
| 9.00 | Overhauling of Diverter Switch & OLTC with mechanism after Draining of Oil from OLTC Chamber, Flushing with Hot T/F Oil in OLTC Chamber and finally, Filling the Fresh Centrifuged Transformer Oil. | 1 | Job | 8,888 ₹8,888 | 8,000 ₹8,000 Lowest | 8,985 ₹8,985 |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
28 May 2026, 1:00 pmClosed
Superintending Engineer
Electricity Transmission Circle, U.P. Power Transmission Corporation Limited, 220 KV Sub-Station, Gidahi-Basti.
Replacement of Damaged Gaskets and Overhauling OLTC/Diverter Switch of 40MVA T/F-II (NGEF make, Mfg. Year 1998) alongwith other associated Works at 132KV Sub Station Naugarh under ETD-II Basti H.Q at Siddharthnagar
2026_UPTCL_1147436_1
Short Term E-Tender No-10/ETC(B)/2026-27
Open Tender
Electrical Works
Lump-sum
60 days
132KV Sub Station Naugarh
As Per Tender
2 documents required · 2 mandatory
₹590
UPSEB ELECTRICITY TRANSMISSION DIVN
₹4,000
10 Jul 2026
12 May 2026
29 May 2026
12 May 2026
28 May 2026
12 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1The following works are carried out for Replacement of Gaskets of 40MVA T/F-II (NGEF make) alongwith other associated Works at 132KV Sub Station Naugarh, with all Cost of Men, Misc. Consumables, Crane / Hydra, Centrifuging Machine, Normal & Special T&Ps, etc. Required for Satisfactory Completion of the Job, as per Technical Specifications & Direction of the Supervising Engineer, as per Details below : | |||||
| 1.01 | Carriage of 20/40 KL empty oil tank for the centrifuging of T/F oil where it is available within distance of 50 Km Approx. including carefully loading empty oil tank at 220KV Substation Bansi & unloading at 132KV Substation Naugarh. | 1 | Job | - | - |
| 2 | Removal of Jumpers of HV & LV side Bushings of the Transformer. The Scope of Work Involves Opening of Bolts & Nuts and Removal of Jumpers, Bushing Clamps etc. | 1 | Job | - | - |
| 3 | Complete Draining of the T/F Oil from the 40MVA Transformer - II (NGEF make) into Oil Tanker / Oil Drums and Stacking them at Proper Place. | 16,590 | Lit. | - | - |
| 4 | Complete Dismantling of the 40MVA Transformer-II (NGEF make). The Scope of Work Involves Dismantling of HV / LV / Neutral Bushings, Turrets, Radiators, Conservator Tank, Explosion Vent Pipe, Buchholz Relay, Oil Pipe Lines, Flanges, Valves, Cooling Fans etc. along with Opening of associated Electrical Connections, Stacking of all the Dismantled Parts at Proper Place in the Switchyard including Proper Blanking of the Open Points before Replacement of Gaskets. | 1 | Job | - | - |
| 5 | Complete Replacement of Gaskets of 40MVA Transformer-II (NGEF make). The Scope of Work Involves Removal of old / damaged Rim Gasket of Transformer's Top Cover and old / damaged gaskets of different Parts of the Transformer by Cleaning of Surfaces, Providing & Fabrication of Gaskets out of good Quality Rubberized Cork Sheet Gaskets of Konica / Troborze / Nu-Cork make having Temperature Bearing Capacity around 3800°C and Fixing the Gaskets with Adhesive at Rim & other Surfaces. | 1 | Job | - | - |
| 6 | Cleaning of Transformer's Core and Winding by Hot Transformer Oil and Removing the Complete Sludge from Bottom by Flushing with Centrifuging Machine. | 1 | Job | - | - |
| 7 | Complete Erection of 40MVA Transformer - I (NGEF make) by Erection of HV / LV / Neutral Bushings, Turrets, Radiators, Conservator Tank, Explosion Vent Pipe, Buchholz Relay, Oil Pipe Lines, Flanges, Valves, Cooling Fans etc. at its original Place and Complete Evacuation of Main Tank of the Transformer and filling of Dry Nitrogen / Dry Air of Dew Point -50°C or better in Vacuum upto Pressure of 0.25Kg/cm² and the again Evacuating the Transformer Tank after Required Time Interval (approx. 12 Hrs.) using Centrifuging Machine. The Scope of Work Involves Measuring Due Point Values of N2 after every Cycle till the Required Value is Achieved. | 1 | Job | - | - |
| 8 | Centrifuging of Oil filled in Oil Tanker, Un-Interrupted till the desired BDV Value of the Oil is Achieved, Filling of Transformer Oil into Main Tank and Radiators from Oil Tanker, then Centrifuging & Circulation of the Oil in Transformer, Un-Interrupted till the Desired BDV Values of the Oil & IR Values are Achieved including Recording of all the Parameters such as Temperature, Vacuum, Insulation Resistance etc. every 2 Hours. Centrifuging Machine, its Operator, all associated T&Ps etc. shall be Arranged by the Contractor at his Own Cost. | 22,000 | Lit. | - | - |
| 9 | Overhauling of Diverter Switch & OLTC with mechanism after Draining of Oil from OLTC Chamber, Flushing with Hot T/F Oil in OLTC Chamber and finally, Filling the Fresh Centrifuged Transformer Oil. | 1 | Job | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
TECHNICAL10.pdf
Tender Documents • 0.98 MB
BOQ_2146641.xls
BOQ • 0.28 MB
Corrigendum_10_1st.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].