Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.2 LAccepted-AOC 456 1 AROOR KOOT ROAD SORAIYUR POST KALAVAI TALUK RANIPET 632318 | RANIPET | TAMIL NADU | 632318 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹84.7 L+₹1.8 L (2.12%)Rejected-Finance NO 4 775 1 1ST CROSS VIVEKANANDAR STREET THASILDAR NAGAR MADURAI 625 020 | MADURAI | MADURAI | TAMIL NADU | 625020 | L2 | Rejected-Finance Above Estimate Rate |
Tender Value
₹55.2 L
EMD Value
₹56,000
Closing Date
19 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
Project Director DRDA SIVAGANGAI
Madurai - thondi road to meet nattarasankottai - Natarajapuram road (via) sengulipatti
2023_RDTN_310873_1
MGSMT_SVGDT_KKOIL_Pack_93
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA SIVAGANGAI
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹56,000
12 Jul 2023
5 May 2023
19 May 2023
5 May 2023
19 May 2023
5 May 2023
Amount
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Picking the existing surface to 50mm to 100mm thick including labour and hire charges for picking tools and plants and all other incidental charges etc complete as per standard specifications.
Earth work excavation and depositing on bank with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
BITUMINOUS CONCRETE 25mm THICK USING cmp (Grade-II) BC 30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for Hectametre stone of size 0.75mx0.23mx0.10m
Provision for KM Stone
60cm Equilateral Triangle Cautionary Signboard
Road Marking
Maintenance of the road
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
T.Ramar
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .