Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | Admitted-Finance |
| 2 | Admitted-Finance NO 9 CHAIRMAN JANAGARAJ STREET SRI RAGAVENDHRA GARDEN ALAMELUPURAM VILLUPURAM 605 602 | VILLUPURAM | VILLUPURAM | TAMIL NADU | 605602 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical NO 6 I 24 AYYAKKARAN THOTTAM VAIGAI VADAKARAI MADURAI 625 002 | MADURAI | MADURAI | TAMIL NADU | 625002 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹12,500
Closing Date
27 Jan 2020, 2:00 pmClosed
AEE GL GCC TRICHY
O/o. ACE GCC TRICHY
Erection of 110 KV DC line on DC Tower with Panther from Cuddalore 230 KV SS to Railway traction SS at Cuddalore Port junction. (New Loc. 1 and 2)
2020_EB_155139_1
GCC 142 GL 86 2019-2020
Open Tender
Civil Works
Works
90 days
Cuddalore
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹12,500
Yes
5 Feb 2020
21 Jan 2020
28 Jan 2020
21 Jan 2020
27 Jan 2020
21 Jan 2020
Amount
Conducting check survey, pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete.
Earthwork excavation in hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete.
Earthwork excavation in soft disintegrated rock or kankar not requiring blasting.
Earthwork excavation in MR and DMR requiring blasting.
Transporting and fixing of stub and cleat with supply of template and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template, labour, fabrication charges etc complete. (Stub and cleat only supplied by department) For KCO Tower
PCC 1:3:6 using 20mm metal for foundation concrete with out form work including cost of all materials, lead, lift, etc complete.
PCC 1:2:4 using 20mm metal for footing foundation concrete with form work including cost of all materials, lead, lift, etc complete.
PCC 1:2:4 using 20mm metal for chimney concrete with form work including cost of all materials, lead, lift, frustum box, chimney box, etc complete.
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. KCO (wet) tower
Supply & Providing pipe type earthing including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete.
Removal of surplus earth in a low lying area to a average distance of 200m by head load.
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour, fuel, oil, transport etc complete.
Providing shoring and shuttering in foundation using wooden planks and scantling including all cost of materials, labour, lead, lift etc complete.
Transport and erection of GI tower angles including cost of materials, T &P, labour, lead, lift etc complete as per approved drawing and specification.
Labour charges for transporting and hoisting of 7 units of 90 KN single suspension Disc insulators with supply and fixing of SS fittings for panther and U bolt including all cost of labour, lead, lift, T & P etc complete. (With out PA rod for panther)
Labour charges for transporting and hoisting of 8 units of 120 KN single Tension Disc insulators with supply and fixing of ST fittings for panther, S.B damper with all allied hardwares including all cost of labour, lead, lift, T & P etc complete.
Labour charges for transport of 4 Nos. of Panther conductor from department store, supply and fixing of panther conductor hardwares (ie.SB damper, D shackle, U bolt, MSJ for panther etc ), paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. (Single span without LC)
Labour charges for transport of 7/3.55mm GI earthwire from Department store supply and fixing of GI earthwire hardwares (ie ST fittings, SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing, rough sagging, tensioning, including jumber connection transport charges, loading, unloading, lead, lift, cost of T&P, etc complete. (Single span without LC)
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials, labour, lead, lift, etc complete.
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials, labour, lead, lift etc complete.
Supply, transport & Labour charges for fixing of number plates, danger board, phase plate including cost of all materials, labour transport, lead, lift, etc complete.
Supply, fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line etc complete.
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials, labour, lead, lift etc complete.
Providing temporary guys wherever necessary including excavation, burying out of anchor for stay wire, tightening, dismantling the same after completion of works including cost of all materials, lead, lift, labour etc complete.
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour, lead, lift etc complete.
Labour charges for removal of large trees.
Labour charges for removal of Small trees.
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
Fabrication of extension of tower parts as per drawing and spec. including labour, lead, lift etc complete but excluding cost of tower materials which will be supplied by department.
Clearing juliflora jungle with uprooting including all cost of labour, lead, lift etc complete.
Providing trussels for major and minor road crossing including cost of all materials, labour, lead lift etc Complete.
K DHINAKARAN
M.ALAGUPANDIAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .