Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.7 L+₹10,361.78 (6.56%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.8 L+₹24,426.25 (15.5%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹1.9 L+₹28,731.70 (18.2%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹2.3 L+₹68,915.90 (43.7%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
24 Nov 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer,WRD
O/o The Executive Engineer, WRD., Periyar Main Canal Division, Melur.
Special Repairs to Sluice No.18 of 11th BC in Soorakundu Village of Melur Taluk in Madurai District.
2026_WRD_720296_1
07 2026-2027 JDO2 F.105 DATED.30.10.2026
Open Tender
Civil Works
Percentage
90 days
Soorakundu
4 documents required · 4 mandatory
₹0
₹3,000
24 Nov 2026
2 Nov 2026
24 Nov 2026
2 Nov 2026
24 Nov 2026
2 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling,clearing away and carefully stacking materials reuse of following items Brick/stone masonry in cement mortar walls under 3m high etc | 5.5 | Cubic Meter | 302.96 | ₹1,666.28 |
| 2 | Dismantling, clearing away and carefully stacking material useful for reuse for any thickness of Plain Cement Concrete complying with standard specification and as directed by the officers inchrge of the works | 0.75 | Cubic Meter | 520.23 | ₹390.17 |
| 3 | Earth work Excavation for foundation and depositing on bank with an initial lead of 10m and initial lift of 2m in Sand ,silt or other loose soil , wet sand or silt not under water , light black cotton soil ,sandy loam and ordinary soil including excavated earth S.S. 20 B
( for foundation ). | 12.8 | Cubic Meter | 147.02 | ₹1,881.86 |
| 4 | Providing and placing Plain Cement Concrete M 15 grade using well graded aggregates of nominal maximum size of 40mm and downgraded to I.S specified grading ( To achieve the specified charaterstics strength of 15N/mm² in 28 days ) and mixing the ingredients in approved mixer including dewatering of the placement site by bailling / pumbing and diverting wharever necessary, placing concrete in layers, watering, curing, finishing the surface with all leads and lifts etc., complete as directed by the Engineer in charge of works and as per the technical specifications.( Without vibration) | 5.7 | Cubic Meter | 6,170.45 | ₹35,171.57 |
| 5Random rubble masonry in cement mortar 1:4 (one cement and four M - Sand)mixed using mixer machine using new hard rough stone and bond stones for various depth and height below and above ground level with all leads and lifts including simultaneous flush pointing the exposed surface with same mortor and with all incidental charges such as scaffolding and dewatering by baling pumping and diverting water wherever required finishing curing complete so as to attain the profile and strength in the drawing and specification including providing shrinkage ,construction joint for closing the days work at intervals specified whereever required and as directed by the Engineer complete complying with specification ( By Manual mixing ) | |||||
| 5.01 | By using old RR Stones | 2 | Cubic Meter | 5,283.45 | ₹10,566.9 |
| 5.02 | By using New RR Stones | 14 | Cubic Meter | 6,105 | ₹85,470 |
| 6 | Plastering cement Mortar 1:4 ( one cement and four P- sand ) using 20 mm thick including curing and finishing etc., complete complying with standard specification as directed by departmental officers. | 26.75 | Square Meter | 583.25 | ₹15,601.94 |
| 7 | Fabricating, Supplying and erection of Screw gearing steel shutters of size above upto 1.00 m width consist shutters of skin plate made out of 8mm thick mild steel plate and horizontally stiffened with 65x65x6mm mild steel Angle at an interval not more than 0.50m and vertical stiffeners made out of same section at an interval not more than 0.60m and provided with 8mm mild steel gusset plate of required size on both sides fastened with rust free bolts and nuts etc. Conveying the fabricated shutter by using lorries including loading, unloading and leading the shutter to the vent. Dismantling the eroded shutter and shuttering arrangements by using necessary gas cutting equipment. Erecting the new shutter and the shuttering arrangements in the vent in proper position by using necessary hoisting equipment. The shutter shall be painted with two coats of Anticorrosive black paint over one coat of Red Oxide Primer. The rate including cost of materials consumables, labours power charges, conveyance charges for all equipment required conveying the dismantled materials to the section stores, cost of petty civil works, trial operation of shutter and warranty for 5 years etc.,complete. | 0.18 | Square Meter | 57,527 | ₹10,354.86 |
| 8 | Supplying and fixing of Head Set Assembly medium duty with hexagonal nut (Approximate 50 Kg) made up of cast iron including moulding, machining and the hexagonal nut threaded to suit the Screw Rod provided with thrust bearings for smooth operation. Conveying and leading the head set assemblyto the work site. Fixing the head set assembly to the top beam by usingrequired rust fre bolts and nuts in proper alignment including dismantling the existing damaged Head set assembly, conveying and stacking at sectio store. The Head set assembly supplied with operating key and the both should be painted with two coats of AC black paint over one coat of red oxide primer. The rate including cost of materials, labours charges for wooden pattern, moulding and charges for labours and materials and warranty for 5 years etc.., | 1 | Numbers | 41,636 | ₹41,636 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
document58.pdf
Tender Documents • 0.64 MB
BOQ_864983.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .