| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.6 LAccepted-Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹56.6 L | L1 | Accepted-Finance Tender accepted as per lowest quoted |
| 2 | L2₹59.8 LRejected-Finance | ₹59.8 L | L2 | Rejected-Finance Tender Rejected as per Highest quoted |
| 3 | L3₹59.8 LRejected-Finance | ₹59.8 L | L3 | Rejected-Finance Tender Rejected as per Highest quoted |
| 4 | L4₹59.9 LRejected-Finance | ₹59.9 L | L4 | Rejected-Finance Tender Rejected as per Highest quoted |
| 5 | L5₹60.3 LRejected-Finance | ₹60.3 L | L5 | Rejected-Finance Tender Rejected as per Highest quoted |
| Sl No | Description | Qty | Unit | S.P.K.CONSTRUCTIONSS L7 | SENTHAAMARAI CONSTRUCTIONS L4 | A2S PROJECTS INDIA PRIVATE LIMITED L6 | A V Construction L5 | SRI RAAGMITH ENTERPRISES L2 | MURTHY E V L8 | Gees Epc Services Pvt. Ltd. L9 | R THANGARAJ L10 | M.LOGANATHAN L1 | S K G CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling, clearing away and carefully stacking materials useful for re-use (Hume pipe ) by using head mazdoor | 50 | Nos | 500 ₹25,000 | 728.64 ₹36,432 | 450 ₹22,500 | 736 ₹36,800 | 320 ₹16,000 Lowest | 900 ₹45,000 | 847.44 ₹42,372 | 1,500 ₹75,000 | 689.04 ₹34,452 | 700 ₹35,000 |
| 2.00 | Rates of hire charges for lifting the hume pipe - Earth Excavator- Wheeled Backhoe loader - 0.50 m3 capacity | 32 | Hr | 900 ₹28,800 | 721.28 ₹23,080.96 | 900 ₹28,800 | 729 ₹23,328 | 1,800 ₹57,600 | 1,000 ₹32,000 | 838.88 ₹26,844.16 | 1,200 ₹38,400 | 682.08 ₹21,826.56 | 648 ₹20,736 Lowest |
| 3.00 | Supplying of 300mm dia RCC Hume Pipe | 140 | RM | 2,150 ₹3,01,000 | 2,070 ₹2,89,800 | 4,100 ₹5,74,000 | 2,092 ₹2,92,880 | 2,250 ₹3,15,000 | 2,250 ₹3,15,000 | 2,407.5 ₹3,37,050 | 1,000 ₹1,40,000 Lowest | 1,957.5 ₹2,74,050 | 2,070 ₹2,89,800 |
| 4.00 | Lowering RCC pipes and specials into the trenches and laying to proper grade and alignment | 140 | RM | 80 ₹11,200 | 78.87 ₹11,041.8 | 180 ₹25,200 | 79 ₹11,060 | 220 ₹30,800 | 69 ₹9,660 Lowest | 91.73 ₹12,842.2 | 300 ₹42,000 | 74.58 ₹10,441.2 | 75 ₹10,500 |
| 5.00 | Cement Mortar 1:3 for Joining Hume pipe | 2.45 | M3 | 4,400 ₹10,780 | 4,120 ₹10,094 | 4,000 ₹9,800 | 4,164 ₹10,201.8 | 5,100 ₹12,495 | 290 ₹710.5 Lowest | 4,791.79 ₹11,739.89 | 10,000 ₹24,500 | 3,896.12 ₹9,545.49 | 4,120 ₹10,094 |
| 6.00 | Providing Plain cement concrete 1:4 :8 using 40mm metal jelly for foundation | 42.5 | M3 | 5,500 ₹2,33,750 | 5,194.32 ₹2,20,758.6 | 4,300 ₹1,82,750 Lowest | 5,250 ₹2,23,125 | 6,300 ₹2,67,750 | 5,450 ₹2,31,625 | 6,042.14 ₹2,56,790.95 | 6,500 ₹2,76,250 | 4,912.76 ₹2,08,792.3 | 5,194.32 ₹2,20,758.6 |
| 7.00 | Supply and erection of steel centering for plane surface of plinth Beams,column,roof beam, slab | 1,017.78 | M2 | 600 ₹6,10,668 | 654.03 ₹6,65,658.65 | 650 ₹6,61,557 | 660 ₹6,71,734.8 | 710 ₹7,22,623.8 | 450 ₹4,58,001 Lowest | 760.66 ₹7,74,184.53 | 950 ₹9,66,891 | 618.48 ₹6,29,476.57 | 654.03 ₹6,65,658.65 |
| 8.00 | supplying, fabricating and placing in position of MS/RTS roads for RCC plinth beam | 9,769.43 | Kg | 87 ₹8,49,940.41 | 85.53 ₹8,35,579.35 | 91 ₹8,89,018.13 | 85 ₹8,30,401.55 | 75 ₹7,32,707.25 Lowest | 93 ₹9,08,556.99 | 99.47 ₹9,71,765.2 | 98 ₹9,57,404.14 | 80.88 ₹7,90,151.5 | 85.53 ₹8,35,579.35 |
| 9.00 | Plain cement concrete 1:2:4 using 20mm size hard broken stone excluding cost of reinforcement and centering charges asper standard specification | 222.59 | M3 | 6,700 ₹14,91,353 | 6,348 ₹14,13,001.32 | 6,800 ₹15,13,612 | 6,417 ₹14,28,360.03 | 3,500 ₹7,79,065 Lowest | 6,900 ₹15,35,871 | 7,384.92 ₹16,43,809.34 | 7,950 ₹17,69,590.5 | 6,004.56 ₹13,36,555.01 | 6,348 ₹14,13,001.32 |
| 10.00 | R.R.Masonry in Cement mortar 1 : 6 for Foundation and Basement (New stone) including simultaneously pointing above ground level with the same mortar, Cost of Mortar Plasticizer used etc.,complete complying with standard specification and as directed by the Departmental Officers.ent concrete 1:2:4 using 20mm size hard broken stone excluding cost of reinforcement and centering charges asper standard specification | 57.78 | M3 | 5,500 ₹3,17,790 | 5,272 ₹3,04,616.16 | 5,700 ₹3,29,346 | 5,329 ₹3,07,909.62 | 5,500 ₹3,17,790 | 6,100 ₹3,52,458 | 6,133.02 ₹3,54,365.9 | 10,000 ₹5,77,800 | 4,986.66 ₹2,88,129.21 Lowest | 5,272 ₹3,04,616.16 |
Tender Value
₹65.1 L
EMD Value
₹65,200
Closing Date
8 Aug 2026, 11:00 amClosed
Deputy Director
O/o Director Arignar Anna Zoological Park Vandalur
REJUVENATION OF OTTERI LAKE RECTIFICATION OF RAIN WATER CHANNELS, BUND STRENGTHENING AND DESILTING
2026_TNFD_687641_1
4681 / 2026 / D
Open Tender
Civil Works
Item Rate
Arignar Anna Zoological park
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹65,200
Yes
20 Aug 2026
22 Jul 2026
10 Aug 2026
22 Jul 2026
8 Aug 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling, clearing away and carefully stacking materials useful for re-use (Hume pipe ) by using head mazdoor | 50 | Nos | 792 | ₹39,600 |
| 2 | Rates of hire charges for lifting the hume pipe - Earth Excavator- Wheeled Backhoe loader - 0.50 m3 capacity | 32 | Hr | 784 | ₹25,088 |
| 3 | Supplying of 300mm dia RCC Hume Pipe | 140 | RM | 2,250 | ₹3,15,000 |
| 4 | Lowering RCC pipes and specials into the trenches and laying to proper grade and alignment | 140 | RM | 85.73 | ₹12,002.2 |
| 5 | Cement Mortar 1:3 for Joining Hume pipe | 2.45 | M3 | 4,478.3 | ₹10,971.84 |
| 6 | Providing Plain cement concrete 1:4 :8 using 40mm metal jelly for foundation | 42.5 | M3 | 5,646.86 | ₹2,39,991.55 |
| 7 | Supply and erection of steel centering for plane surface of plinth Beams,column,roof beam, slab | 1,017.78 | M2 | 710.9 | ₹7,23,539.8 |
| 8 | supplying, fabricating and placing in position of MS/RTS roads for RCC plinth beam | 9,769.43 | Kg | 92.97 | ₹9,08,263.91 |
| 9 | Plain cement concrete 1:2:4 using 20mm size hard broken stone excluding cost of reinforcement and centering charges asper standard specification | 222.59 | M3 | 6,901.8 | ₹15,36,271.66 |
| 10 | R.R.Masonry in Cement mortar 1 : 6 for Foundation and Basement (New stone) including simultaneously pointing above ground level with the same mortar, Cost of Mortar Plasticizer used etc.,complete complying with standard specification and as directed by the Departmental Officers.ent concrete 1:2:4 using 20mm size hard broken stone excluding cost of reinforcement and centering charges asper standard specification | 57.78 | M3 | 5,731.8 | ₹3,31,183.4 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_826496.xls
BOQ • 0.40 MB
46812026DOtteriLakeRainWaterChannel.pdf
Tender Documents • 1.19 MB
CorrigendumphaseII.pdf
PDF • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].