| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1 Tendere₹31.0 LAccepted-AOC | L1 Tendere | Accepted-AOC L1 Tenderer |
Tender Value
Refer Docs
EMD Value
₹29,865
Closing Date
16 Feb 2021, 3:00 pmClosed
SE CDC TANGEDCO
A10 Thiru .vi.ka Industrial Estate guindy
Laying of 33 KV 3x400 sq.mm XLPE UG cable from junction of Ammaiyappan lane street and Gowdya Mutt road to 33/11 KV Sardharjung Garden SS
2021_EB_192897_1
OTNO24/2020-21
Open Tender
Civil Works
Works
45 days
A10 Thiru .vi.ka Industrial Estate guindy
As per tender document
2 documents required · 2 mandatory
₹0
₹29,865
Yes
29 Jul 2022
30 Jan 2021
17 Feb 2021
30 Jan 2021
16 Feb 2021
30 Jan 2021
30 Jan 2021 - 16 Feb 2021
Amount
Removing the black topping of 30cm thickness and forming cable open trench and cable duct at road crossing 60 cm wide and 135 cm deep (clear) including cost of using machinary providing danger lights, indication arrangements wherever necessary labour, lead, lift, tools and plants etc., complete. The removed Tar blacks, RCC/PCC and other debris shall be removed from site before the start of excavaion of trench.
Earth work excavation in all soils to a depth from 31cm to 135cm including slush and silt under water requiring the aid of basket and vessels and forming cable trench and cable duct including cost of signal boards, danger lights, indication arrangements wherever necessary and providing shoring and strutting arrangements wherever necessary all labour, lead, lift, tools and plants etc., complete.The excavated earth should be placed in one side of trench preferably on foot path side , not to obstruct free flow of traffic.
Earth work excavation in all soils only (no tar/PCC/RCC removal ) for a breadth of 60cm and to a depth 135cm from including slush and silt under water requiring the aid of basket and vessels and forming cable trench and cable duct including cost of signal boards, danger lights, indication arrangements wherever necessary and providing shoring and strutting arrangements wherever necessary all labour, lead, lift, tools and plants etc., complete.The excavated earth should be placed in one side of trench preferably on foot path side , not to obstruct free flow of traffic.Using labour to a breadth of 60cm and a depth of 135cm
Drilling, Reaming & Laying of 33 KVA cable 3x400 sqmm using Trenhcless Technology Method at a depth of about 1.50 meters or more by using directional drilling unit equipped with automated pipe handing system (Horizontal Directional Drilling Machine). Using bentonite mud mixing system and all necessary accessories using pulling the cable carefully without damaging other service like telephone, internet cables, water pipes etc., installation including cost of pipe, hire charges for all the accessories and equipment etc.,Taking the necessary drive pit for drilling & laying the cable, remove the excavated earth. The rate quoted shall be inclusive of of GPR (Ground Penetrating Radar) survey for identify the existing utility in the proposed bore path.The rate shall also be inclusive of drilling profile drawing, soil test for every 200m,soil excavation for test pit, drive pit and exit pit, pilot drilling, pre reaming, fluid process in consultation with mud Engineer, laying of cable and furnishing of built drawing(actual)
Dismantling the brickwork, PCC , RCC inside the cable trench and cable duct wherever occur of any thickness and clearing the trench/duct free from debris and without hinderence to the cable laying work including lead, lift, labour, tools & plants etc., complete as per direction of Engineer-in-charge.
Dismantling BW in CM - 1cum
Dismantling PCC - 1cum
Dismantling RCC - 1cum
Providing M.S barricading 1.5m height using M.S sheet 4 mm thick MS angle 50 x 50 x 8 mm base channel 100 x 50 of all materials, leads, lifts, labour, welding and erection , transporting at site, placing in position, shifting to new location after completing works,tools & plants etc.,complete
Supplying & laying of 140 mm dia PVC pipes, cutting and jointing the pipe,tying with 7/20SWG G.I.wire inside the pipe and closing the ends with end cap including cost of PVC specials, labour, lead, lift, T&P etc., complete (by contractor)
Laying plain cement concrete 1:3:6, using 20mm BG metal for bottom portion of trench for fixing PVC pipe in the cable duct in proper alignment and level as per std.specification including cost of all materials, labour, lead, lift etc., complete.
Loading at stores and transporting of 33KV XLPE U.G cable drums including cost of loading at stores,unloading of cable drums each weighing approximately 7T in lorries using truck mounted crane for both loading and unloading including cost of labour required, etc.,
Laying of 3x400 sq.mm 33KV XLPE UG cable by means of winch over rollers provided by contractor. The rate includes the cost of pulling the steel wire rope from winch side to drum side providing labour as required at site for tying the cable in trefoil formation with nylon rope/etc., complete.
Refilling with filling sand in layers well consolidated asper std. specification including cost of all materials,labour,lead, lift etc.complete. "Note: (i) For cable Trench: Providing fine filling sand to a height of 100mm for bedding before laying cable (ii) To a height of 400mm after laying cable (iii) For cable duct: Providing fine filling sand to a height of 250mm above PCC of 500mm height"
Supply and laying RCC cover slab (60cmx50cmx5cm) including cost of slab, stencilling and laying carefully as directed by the Engineer including cost of all materials,labour, leads, lifts, etc., complete.
Refilling with excavated earth in layers and well consolidated as per std. specification including cost of all materials,labour,lead lift etc.,complete.
Transporting and clearing the excess excavated earth and debris then and there immediately to avoid any hinderence to the normal flow of traffic and public beyond a distance of 5km from the work spot as per the direction of Engineer - in - charge including loading and unloading etc., complete.
Transporting of 33 KV empty drums loading at site, and devolution of empty 33KV steel cable drum each weighing 1 to 1.5T from various work site and balance cables if any to departmental stores
Providing watch and ward (unskilled) at site as instructed by the Engineer incharge at site.
Bailing out water from cable trench and duct while excavating and also while laying cable using 5HP diesel pump including cost of fuel, operator etc.,
Providing 18 gauge alumininum strip with Nylon tie at 10m intervals for engraving voltage level, size of the cable, name of the feeder including cost of all materials, labour charges, transportation charges, etc., complete. (Every 10m intervals)
Casting & placing of RCC offset slab (cable route indication slab)of size 750x750x60 mm casting in RCC 1:2:4 using 12 to 20 mm HBG metal with necessary reinforcement,piling,shuttering,curing, transport from casting yard to various locations & fixing the slab along 33KV cable route as directed by site Engineer at site with PCC 1:3:6 including cost of all materials,labour,lead,lift etc including 2 coats of flourescent painting.
GST for bidders within TamilNadu
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .