Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 LQualified | ₹13.7 L | L1 | Qualified MSE, MII, Category: General |
| 2 | L2₹15.8 LQualified | ₹15.8 L | L2 | Qualified MSE, MII, Category: General |
| 3 | L3₹71.4 LQualified | ₹71.4 L | L3 | Qualified MSE, MII, Category: General |
| 4 | Disqualified | - | - | Disqualified MSE, MII, Category: General |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
17 Dec 2025, 2:00 pmClosed
1.EMERGENCY ESCAPE SCUTTLES
2. ON BOARD SPARES FOR ESS
3.Documentation
4.EMERGENCY ESCAPE SCUTTLES
5. ON BOARD SPARES FOR ESS
6.Documentation
7.EMERGENCY ESCAPE SCUTTLES
8. ON BOARD SPARES FOR ESS
9.Documentation
10.EMERGENCY ESCAPE SCUTTLES
11. ON BOARD SPARES FOR ESS
12.Documentation
13.EMERGENCY ESCAPE SCUTTLES
14. ON BOARD SPARES FOR ESS
15.Documentation
16.EMERGENCY ESCAPE SCUTTLES
17. ON BOARD SPARES FOR ESS
18.Documentation
8634021
GEM/2025/B/6931028
Two Packet Bid
1.EMERGENCY ESCAPE SCUTTLES,2. ON BOARD SPARES FOR ESS,3.Documentation,4.EMERGENCY ESCAPE SCUTTLES,
150 days
Maharashtra; Mumbai
Total value wise evaluation
BOQ
1 document required · 1 mandatory
₹25,000
17 Dec 2025
26 Nov 2025
17 Dec 2025
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | 1.EMERGENCY ESCAPE SCUTTLES | 01.SIZE CLEAR OPENING DIAMETER 800 MM 02.COLOR GREEN ON BOTH SIDES.THE HANDLES TO BE MARKED WITH PHOTO LUMINESCENT TAPES. 03.OPENING MECHANISM-ESCAPE SCUTTLES ARE TO BE SPRING ASSISTED AND PROVIDED WITH A WHEEL ASSEMBLY ON THE INSIDE AND A SLOT WITH A DETACHABLE OPERATING HANDLE FROM OUTSIDE FOR OPENING AND CLOSING OF THE SCUTTLES.THE OPERATING HANDLE SHOULD BE SUPPLIED WITH ASSOCIATED BULKHEAD-MOUNTABLE PRESS-FIT CLAMPS TO ENABLE SECURING THE OPERATING HANDLE ONTO THE BULKHEAD. 04.MATERIAL- AS PER CLASS REQUIREMENT 05.ALL EES ARE TO BE FLUSH TYPE SPRING ASSISTED WITH AUTO RETENTION CLIP AND OPERABLE FROM ABOVE AND BELOW BY ONE PERSON.THEY ARE TO BE PROVIDED WITH AN OPENING ARRANGEMENT FROM ABOVE WITH DETACHABLE OPERATING HANDLE AND PRESS-FIT CLAMPS FOR SECURING THE HANDLE ON TO THE NEAREST BULKHEAD. 06.EES ARE REQUIRED TO OPERABLE FROM BOTH SIDES AND TESTED UP TO 1.2 BAR PRESSURE OR AS PER CLASS REQUIREMENT 07.MARKING- EACH SCUTTLE SHOULD HAVE PUNCH MARK WITH OEM NAME DATE OF FABRICATION MONTH AND YEAR .MARKING SYMBOLS SHOULD BE PROMINENT LEGIBLE AND I.A.W. WITH NES118 and NES119. 08.RUBBER BEADING-RUBBER BEADING OF SILICONE AS PER NCD 5910 ARE TO BE USED FOR THE EES | 2 | NOS | Mumbai | 150 |
| 2 | 2. ON BOARD SPARES FOR ESS | ON BOARD SPARES FOR ESS CONSISTING OF THE FOLLOWING -1.SS NUTS AND BOLT SETS- 10 NOS -2.SS SCREWS-10 NOS -3.BRASS WASHERS-10 NOS -4.SPLIT PINS-04 NOS -5.SILICON RUBBER BEADING-04 MTRS -6.ADJUSTABLE SPANNER-01 NOS | 1 | SET | Mumbai | 150 |
| 3 | 3.Documentation | DOCUMENTATION -1.CLASS APPROVED DRAWINGS- 01 NOS. -2.TECHNICAL -OPERATING-INSTALLATION-TESTING and MAINTENANCE MANUAL-01 NOS. -3.INSPECTION RELEASE NOTE-INSPECTION REPORTS OF INSPECTION AGENCY-CERTIFIED TEST REPORTS-MATERIALTEST REPORTS-CERTIFICATE FOR DIMENSIONAL ACCURACY WEIGHT CERTIFICATES WITH POSITION OF C.G ETC-01 NOS. -4.SOFT COPY OF ALL ABOVE DOCUMENTS IN CD OR PEN DRIVE-01 NOS. | 2 | SET | Mumbai | 150 |
| 4 | 4.EMERGENCY ESCAPE SCUTTLES | 01.SIZE CLEAR OPENING DIAMETER 800 MM 02.COLOR GREEN ON BOTH SIDES.THE HANDLES TO BE MARKED WITH PHOTO LUMINESCENT TAPES. 03.OPENING MECHANISM-ESCAPE SCUTTLES ARE TO BE SPRING ASSISTED AND PROVIDED WITH A WHEEL ASSEMBLY ON THE INSIDE AND A SLOT WITH A DETACHABLE OPERATING HANDLE FROM OUTSIDE FOR OPENING AND CLOSING OF THE SCUTTLES.THE OPERATING HANDLE SHOULD BE SUPPLIED WITH ASSOCIATED BULKHEAD-MOUNTABLE PRESS-FIT CLAMPS TO ENABLE SECURING THE OPERATING HANDLE ONTO THE BULKHEAD. 04.MATERIAL- AS PER CLASS REQUIREMENT 05.ALL EES ARE TO BE FLUSH TYPE SPRING ASSISTED WITH AUTO RETENTION CLIP AND OPERABLE FROM ABOVE AND BELOW BY ONE PERSON.THEY ARE TO BE PROVIDED WITH AN OPENING ARRANGEMENT FROM ABOVE WITH DETACHABLE OPERATING HANDLE AND PRESS-FIT CLAMPS FOR SECURING THE HANDLE ON TO THE NEAREST BULKHEAD. 06.EES ARE REQUIRED TO OPERABLE FROM BOTH SIDES AND TESTED UP TO 1.2 BAR PRESSURE OR AS PER CLASS REQUIREMENT 07.MARKING- EACH SCUTTLE SHOULD HAVE PUNCH MARK WITH OEM NAME DATE OF FABRICATION MONTH AND YEAR .MARKING SYMBOLS SHOULD BE PROMINENT LEGIBLE AND I.A.W. WITH NES118 and NES119. 08.RUBBER BEADING-RUBBER BEADING OF SILICONE AS PER NCD 5910 ARE TO BE USED FOR THE EES | 2 | NOS | Mumbai | 300 |
| 5 | 5. ON BOARD SPARES FOR ESS | ON BOARD SPARES FOR ESS CONSISTING OF THE FOLLOWING -1.SS NUTS AND BOLT SETS- 10 NOS -2.SS SCREWS-10 NOS -3.BRASS WASHERS-10 NOS -4.SPLIT PINS-04 NOS -5.SILICON RUBBER BEADING-04 MTRS -6.ADJUSTABLE SPANNER-01 NOS | 1 | SET | Mumbai | 300 |
| 6 | 6.Documentation | DOCUMENTATION -1.CLASS APPROVED DRAWINGS- 01 NOS. -2.TECHNICAL -OPERATING-INSTALLATION-TESTING and MAINTENANCE MANUAL-01 NOS. -3.INSPECTION RELEASE NOTE-INSPECTION REPORTS OF INSPECTION AGENCY-CERTIFIED TEST REPORTS-MATERIALTEST REPORTS-CERTIFICATE FOR DIMENSIONAL ACCURACY WEIGHT CERTIFICATES WITH POSITION OF C.G ETC-01 NOS. -4.SOFT COPY OF ALL ABOVE DOCUMENTS IN CD OR PEN DRIVE-01 NOS. | 2 | SET | Mumbai | 300 |
| 7 | 7.EMERGENCY ESCAPE SCUTTLES | 01.SIZE CLEAR OPENING DIAMETER 800 MM 02.COLOR GREEN ON BOTH SIDES.THE HANDLES TO BE MARKED WITH PHOTO LUMINESCENT TAPES. 03.OPENING MECHANISM-ESCAPE SCUTTLES ARE TO BE SPRING ASSISTED AND PROVIDED WITH A WHEEL ASSEMBLY ON THE INSIDE AND A SLOT WITH A DETACHABLE OPERATING HANDLE FROM OUTSIDE FOR OPENING AND CLOSING OF THE SCUTTLES.THE OPERATING HANDLE SHOULD BE SUPPLIED WITH ASSOCIATED BULKHEAD-MOUNTABLE PRESS-FIT CLAMPS TO ENABLE SECURING THE OPERATING HANDLE ONTO THE BULKHEAD. 04.MATERIAL- AS PER CLASS REQUIREMENT 05.ALL EES ARE TO BE FLUSH TYPE SPRING ASSISTED WITH AUTO RETENTION CLIP AND OPERABLE FROM ABOVE AND BELOW BY ONE PERSON.THEY ARE TO BE PROVIDED WITH AN OPENING ARRANGEMENT FROM ABOVE WITH DETACHABLE OPERATING HANDLE AND PRESS-FIT CLAMPS FOR SECURING THE HANDLE ON TO THE NEAREST BULKHEAD. 06.EES ARE REQUIRED TO OPERABLE FROM BOTH SIDES AND TESTED UP TO 1.2 BAR PRESSURE OR AS PER CLASS REQUIREMENT 07.MARKING- EACH SCUTTLE SHOULD HAVE PUNCH MARK WITH OEM NAME DATE OF FABRICATION MONTH AND YEAR .MARKING SYMBOLS SHOULD BE PROMINENT LEGIBLE AND I.A.W. WITH NES118 and NES119. 08.RUBBER BEADING-RUBBER BEADING OF SILICONE AS PER NCD 5910 ARE TO BE USED FOR THE EES | 2 | NOS | Mumbai | 450 |
| 8 | 8. ON BOARD SPARES FOR ESS | ON BOARD SPARES FOR ESS CONSISTING OF THE FOLLOWING -1.SS NUTS AND BOLT SETS- 10 NOS -2.SS SCREWS-10 NOS -3.BRASS WASHERS-10 NOS -4.SPLIT PINS-04 NOS -5.SILICON RUBBER BEADING-04 MTRS -6.ADJUSTABLE SPANNER-01 NOS | 1 | SET | Mumbai | 450 |
| 9 | 9.Documentation | DOCUMENTATION -1.CLASS APPROVED DRAWINGS- 01 NOS. -2.TECHNICAL -OPERATING-INSTALLATION-TESTING and MAINTENANCE MANUAL-01 NOS. -3.INSPECTION RELEASE NOTE-INSPECTION REPORTS OF INSPECTION AGENCY-CERTIFIED TEST REPORTS-MATERIALTEST REPORTS-CERTIFICATE FOR DIMENSIONAL ACCURACY WEIGHT CERTIFICATES WITH POSITION OF C.G ETC-01 NOS. -4.SOFT COPY OF ALL ABOVE DOCUMENTS IN CD OR PEN DRIVE-01 NOS. | 2 | SET | Mumbai | 450 |
| 10 | 10.EMERGENCY ESCAPE SCUTTLES | 01.SIZE CLEAR OPENING DIAMETER 800 MM 02.COLOR GREEN ON BOTH SIDES.THE HANDLES TO BE MARKED WITH PHOTO LUMINESCENT TAPES. 03.OPENING MECHANISM-ESCAPE SCUTTLES ARE TO BE SPRING ASSISTED AND PROVIDED WITH A WHEEL ASSEMBLY ON THE INSIDE AND A SLOT WITH A DETACHABLE OPERATING HANDLE FROM OUTSIDE FOR OPENING AND CLOSING OF THE SCUTTLES.THE OPERATING HANDLE SHOULD BE SUPPLIED WITH ASSOCIATED BULKHEAD-MOUNTABLE PRESS-FIT CLAMPS TO ENABLE SECURING THE OPERATING HANDLE ONTO THE BULKHEAD. 04.MATERIAL- AS PER CLASS REQUIREMENT 05.ALL EES ARE TO BE FLUSH TYPE SPRING ASSISTED WITH AUTO RETENTION CLIP AND OPERABLE FROM ABOVE AND BELOW BY ONE PERSON.THEY ARE TO BE PROVIDED WITH AN OPENING ARRANGEMENT FROM ABOVE WITH DETACHABLE OPERATING HANDLE AND PRESS-FIT CLAMPS FOR SECURING THE HANDLE ON TO THE NEAREST BULKHEAD. 06.EES ARE REQUIRED TO OPERABLE FROM BOTH SIDES AND TESTED UP TO 1.2 BAR PRESSURE OR AS PER CLASS REQUIREMENT 07.MARKING- EACH SCUTTLE SHOULD HAVE PUNCH MARK WITH OEM NAME DATE OF FABRICATION MONTH AND YEAR .MARKING SYMBOLS SHOULD BE PROMINENT LEGIBLE AND I.A.W. WITH NES118 and NES119. 08.RUBBER BEADING-RUBBER BEADING OF SILICONE AS PER NCD 5910 ARE TO BE USED FOR THE EES | 2 | NOS | Mumbai | 600 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8634021.pdf
GEM_BID
all_doc_2025-11-25-16-13-40_d3db2c7f0f872ece4d7e68e4691c0e2a.pdf
BOQ
boq_gem_2025-11-25-16-13-40_86c677e0af06501883e198790ad0ac8d.csv
BOQ
1764152030.xlsx
OTHER
ATCFINAL_0bbd00d9-b4ce-472b-96361764152175383_buyer19_cnp.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid