| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.3 LAccepted-AOC 2 222 B 10 PONMAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹6.3 L Quoted ₹5.8 L | 1 | Accepted-AOC L1 |
| 2 | 2₹6.1 LRejected-AOC 3 140 H 1 PERIYAR STREET AMMAN NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹6.1 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SS ENGINEERING CONTRACTOR L2 | PREETHI ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for overhauling of Sludge disposal pump includes dismantling of pump components, cleaning, inspection and renewal of worn-out parts and reassembling. | 1 | No. | 35,200 ₹35,200 | 34,800 ₹34,800 |
| 2.00 | Charges for complete alignment & checking the operation of clarifier sludge disposal pumps motor, sludge disposal pumps and its suction & delivery pipe lines and its 150 mm gate valves. | 1 | No | 12,000 ₹12,000 | 11,500 ₹11,500 |
| 3.00 | Charges for Overhauling of 150 / 200 mm size, 1 No.125 mm NRV and 150 / 300 Class Gate valves of Cold & Hot water Tunnel Vent in Cooling Water System-II including dismantling of vent pipe, complete dismantling the valve, Lapping the valve disc & seat area renewal of spares, Gland Packing and rubber gasket and assembling. | 11 | Nos | 7,200 ₹79,200 | 7,000 ₹77,000 |
| 4.00 | Charges for removing the existing grills & leading from inside fan stack to outside fan stack, cleaning and re fixing the painted grills at its existing position properly with tag welding inside the fan stack. | 68 | M2 | 150 ₹10,200 | 147 ₹9,996 |
| 5.00 | Charges for loading of required materials from Central Stores and transporting to Cooling Tower. Unloading, leading, lifting and placing at Cooling Tower floor (11 m height), Leading and lowering the scrap from Cooling Tower floor to ground level. Loading, transporting and devolution of scrap materials at Central Stores. | 3,808 | kgs | 8 ₹30,464 | 7 ₹26,656 |
| 6.00 | Charges for renewal of new fabricated G.I safety grill and M.S. plate by positioning, fixing & welding inside the fan stack area which includes welding charges. | 641 | kgs | 32 ₹20,512 | 30 ₹19,230 |
| 7.00 | Charges for cutting of eroded / corroded safety hand rails (G.I pipes 40 & 50 mm dia) and replacing it by new one by using 40 & 50 mm dia G.I. pipe, heavy duty Class ‘B’ conforming to IS specifications in fan stack area of Cooling Tower-IV cutting of new pipes as per the site condition, fabrication, laying charges of pipe, welding charges and all labour charges lead & lift etc., complete. | 465 | metre | 300 ₹1,39,500 | 295 ₹1,37,175 |
| 8.00 | Charges for painting with one coat of rust convertor, one coat of epoxy red oxide primer and one coat of epoxy high build coal tar one over the other with proper intervals for tunnel vent valves, air vent valves. | 37 | M2 | 230 ₹8,510 | 220 ₹8,140 |
| 9.00 | Charges for cleaning and painting with one coat of Epoxy red oxide primer, Two coats of first quality epoxy grey paint of I.D fan gearbox outer surfaces, hub & arm sleeves, Tie bars, drive shaft assembly and FRP fan blades in Cooling Tower-IV. | 357 | M2 | 110 ₹39,270 | 100 ₹35,700 |
| 10.00 | Charges for painting with two coats of Yellow & black paint on handrails and Heat Resistant Aluminum paint on safety grills inside Fan stack area in cooling tower-IV. | 388 | M2 | 110 ₹42,680 | 100 ₹38,800 |
Tender Value
Refer Docs
EMD Value
₹5,700
Closing Date
4 Aug 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I CA CWS II Unit IV Overhauling of Sludge Disposal Pump and Cold and Hot water Tunnel vent valves Air Vent valves and Gate valves and allied works
2025_EB_584169_1
CE/MTPS-I/SE/M-I/CA/OT. 163/2025-26
Open Tender
Power/Energy Projects/Products
15 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹5,700
Yes
30 Jan 2026
21 Jul 2025
5 Aug 2025
21 Jul 2025
4 Aug 2025
21 Jul 2025
Amount
Charges for overhauling of Sludge disposal pump includes dismantling of pump components, cleaning, inspection and renewal of worn-out parts and reassembling.
Charges for complete alignment & checking the operation of clarifier sludge disposal pumps motor, sludge disposal pumps and its suction & delivery pipe lines and its 150 mm gate valves.
Charges for Overhauling of 150 / 200 mm size, 1 No.125 mm NRV and 150 / 300 Class Gate valves of Cold & Hot water Tunnel Vent in Cooling Water System-II including dismantling of vent pipe, complete dismantling the valve, Lapping the valve disc & seat area renewal of spares, Gland Packing and rubber gasket and assembling.
Charges for removing the existing grills & leading from inside fan stack to outside fan stack, cleaning and re fixing the painted grills at its existing position properly with tag welding inside the fan stack.
Charges for loading of required materials from Central Stores and transporting to Cooling Tower. Unloading, leading, lifting and placing at Cooling Tower floor (11 m height), Leading and lowering the scrap from Cooling Tower floor to ground level. Loading, transporting and devolution of scrap materials at Central Stores.
Charges for renewal of new fabricated G.I safety grill and M.S. plate by positioning, fixing & welding inside the fan stack area which includes welding charges.
Charges for cutting of eroded / corroded safety hand rails (G.I pipes 40 & 50 mm dia) and replacing it by new one by using 40 & 50 mm dia G.I. pipe, heavy duty Class ‘B’ conforming to IS specifications in fan stack area of Cooling Tower-IV cutting of new pipes as per the site condition, fabrication, laying charges of pipe, welding charges and all labour charges lead & lift etc., complete.
Charges for painting with one coat of rust convertor, one coat of epoxy red oxide primer and one coat of epoxy high build coal tar one over the other with proper intervals for tunnel vent valves, air vent valves.
Charges for cleaning and painting with one coat of Epoxy red oxide primer, Two coats of first quality epoxy grey paint of I.D fan gearbox outer surfaces, hub & arm sleeves, Tie bars, drive shaft assembly and FRP fan blades in Cooling Tower-IV.
Charges for painting with two coats of Yellow & black paint on handrails and Heat Resistant Aluminum paint on safety grills inside Fan stack area in cooling tower-IV.
Cost of Neoprene Rubber(Black) Gasket,Size, 1 M X 2 M X 5 MM thick For Sl.No. 3
Cost of 40 mm dia GI pipe ‘B' class for Sl.No. 7
Cost of 50 mm dia GI pipe ‘B' class for Sl.No. 7
Cost of cutting Gas for Sl.No. 4, 5, 6 & 7
Cost of Welding Electrodes Sl.No. 4, 5, 6 & 7
Cost of Rust Convertor For Sl.No.8
Cost of Epoxy Thinner for SL.No.8 & 9
Cost of Epoxy red oxide primer for SL.No. 8 & 9
Cost of Epoxy Coal tar paint For Sl.No. 8
Cost of Epoxy gray paint for SL.No. 9
Cost of Enamel Thinner for Sl.No. 10
Cost of Heat resistant Aluminium paint for Sl.No. 10
Cost of Golden Yellow & Black Enamel for Sl.No. 10
Consumables & T & P's charges for S.No.1 to 10
SS ENGINEERING CONTRACTOR (BID ID -1418523)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid