Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 CrAccepted-Finance KH NO 17 B H U NO 74A KAUSHALPURI COLONY KHARGAPUR GOMTINAGAR LUCKNOW U P | ₹12.6 Cr | L1 | Accepted-Finance AS PER UPLOADED |
| 2 | L2₹13.3 Cr+₹71.4 L (5.69%)Rejected-Finance 4 295 SECTOR NEAR DELHI PUBLIC SCHOOL GOMTI NAGAR LUCKNOW 226010 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226010 | ₹13.3 Cr+₹71.4 L (5.69%) | L2 | Rejected-Finance AS PER UPLOADED |
| 3 | L3₹14.1 Cr+₹1.5 Cr (12.0%)Rejected-Finance | ₹14.1 Cr+₹1.5 Cr (12.0%) | L3 | Rejected-Finance AS PER UPLOADED |
| 4 | L4₹14.1 Cr+₹1.6 Cr (12.3%)Rejected-Finance VILLAGE PATHRA POST BADGO THANA KHORABAR DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | ₹14.1 Cr+₹1.6 Cr (12.3%) | L4 | Rejected-Finance AS PER UPLOADED |
| 5 | L5₹14.4 Cr+₹1.9 Cr (14.8%)Rejected-Finance CHANDAULI | UTTAR PRADESH | 221009 | ₹14.4 Cr+₹1.9 Cr (14.8%) | L5 | Rejected-Finance AS PER UPLOADED |
| Sl No | Description | Qty | Unit | M/s Narayan Enterprises L1 | M/S AJIT CONSTRUCTION AND ORDER SUPPLIER L4 | M/S BABY SHAHI L2 | Mittal Brothers Engineers and Contractors Bharat LLP L3 | ARVIND KUMAR SINGH L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of existing Double Brick Lining and its proper disposal within an initial lead of 60m with cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. | 1,074.3 | Cum | 70 ₹75,201 Lowest | 92 ₹98,835.6 | 81 ₹87,018.3 | 250 ₹2,68,575 | 95 ₹1,02,058.5 |
| 2.00 | Earth work in filling to recoup the canal section including cost of materials, T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. | 9,828.28 | Cum | 105 ₹10,31,969.4 Lowest | 170 ₹16,70,807.6 | 160 ₹15,72,524.8 | 150 ₹14,74,242 | 160 ₹15,72,524.8 |
| 3.00 | Earth work in excavation in foundation for toe wall/top wall and for sleepers including digging and refilling the trenches with its proper disposal within 30 meter lead & all lift with cost of labour and T&P for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 12,179.95 | Cum | 55 ₹6,69,897.25 Lowest | 100 ₹12,17,995 | 91 ₹11,08,375.45 | 150 ₹18,26,992.5 | 100 ₹12,17,995 |
| 4.00 | Plain Cement Concrete M15 Grade in Sleepers and Top/Cut-off Wall with Coarse Sand having F.M. Not less than 2.5, Crushed Stone Aggregate of nominal size of 4.75 mm to 20 mm( dalla grit), Mechanically mixed, placed in position and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 2,155.68 | Cum | 10,100 ₹2,17,72,368 | 10,500 ₹2,26,34,640 | 9,876 ₹2,12,89,495.68 Lowest | 10,000 ₹2,15,56,800 | 10,800 ₹2,32,81,344 |
| 5.00 | Plain Cement Concrete M20 Grade in CC Block (300 mmX600 mmX150 mm), Toe Wall, with Coarse Sand having F.M. Not less than 2.5, Crushed Stone Aggregate of nominal size of 4.75 mm to 20 mm ( dalla grit), Mechanically mixed, placed in position and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 1,724.11 | Cum | 10,500 ₹1,81,03,155 | 10,800 ₹1,86,20,388 | 10,220 ₹1,76,20,404.2 Lowest | 10,500 ₹1,81,03,155 | 11,000 ₹1,89,65,210 |
| 6.00 | Plain Cement Concrete M20 Grade in 125 mm thick Lining with Coarse Sand having F.M. Not less than 2.5, Crushed Stone Aggregate of nominal size of 4.75 mm to 20 mm ( dalla grit), Micro polymeric fibers, Mechanically mixed, placed in position with Concrete Paver Machine and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 30,995.46 | Sqm | 1,510 ₹4,68,03,144.6 Lowest | 1,600 ₹4,95,92,736 | 1,537 ₹4,76,40,022.02 | 1,850 ₹5,73,41,601 | 1,700 ₹5,26,92,282 |
| 7.00 | Providing and laying Steel in Reinforcement including cost of steel carriage, bending, cutting, placing in position and binding with steel binding wire etc. including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specification. | 22.46 | MT | 67,000 ₹15,04,820 | 68,000 ₹15,27,280 | 61,233 ₹13,75,293.18 Lowest | 80,000 ₹17,96,800 | 66,000 ₹14,82,360 |
| 8.00 | Supplying and laying Coarse Sand below Stone Grit with proper compaction and rolling including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 1,198.35 | Cum | 5,600 ₹67,10,760 | 5,800 ₹69,50,430 | 5,269 ₹63,14,106.15 | 4,800 ₹57,52,080 Lowest | 5,800 ₹69,50,430 |
| 9.00 | Supplying and laying Stone Grit 4.75 -10 mm ( dalla) below Cement Concrete lining with proper compaction and rolling including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 1,198.35 | Cum | 4,600 ₹55,12,410 | 4,900 ₹58,71,915 | 4,513 ₹54,08,153.55 Lowest | 4,800 ₹57,52,080 | 4,890 ₹58,59,931.5 |
| 10.00 | Providing & Laying LDPE Sheet on below lining and below cut off wall including cost of all materials, labour, T&P etc required for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. | 30,274.2 | Sqm | 38 ₹11,50,419.6 | 35 ₹10,59,597 | 37 ₹11,20,145.4 | 25 ₹7,56,855 Lowest | 38 ₹11,50,419.6 |
Tender Value
Refer Docs
EMD Value
₹31.0 L
Closing Date
7 Aug 2026, 1:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER GANDAK IRRIGATION WORK CIRCLE-1, GORAKHPUR
Rehabilitation Work of lining of internal damaged slope of right and left bank from Km 123.749 to Km 125.000 of Main Western Gandak Canal in Kushinagar district.
2026_UPIDC_1170924_6
03/SE/2026-27
Open Tender
Civil Works
Item Wise
485 days
KUSHINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,354
₹31.0 L
Yes
10 Sept 2026
20 Jul 2026
7 Aug 2026
20 Jul 2026
7 Aug 2026
20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing Double Brick Lining and its proper disposal within an initial lead of 60m with cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. | 1,074.3 | Cum | - | - |
| 2 | Earth work in filling to recoup the canal section including cost of materials, T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. | 9,828.28 | Cum | - | - |
| 3 | Earth work in excavation in foundation for toe wall/top wall and for sleepers including digging and refilling the trenches with its proper disposal within 30 meter lead & all lift with cost of labour and T&P for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 12,179.95 | Cum | - | - |
| 4 | Plain Cement Concrete M15 Grade in Sleepers and Top/Cut-off Wall with Coarse Sand having F.M. Not less than 2.5, Crushed Stone Aggregate of nominal size of 4.75 mm to 20 mm( dalla grit), Mechanically mixed, placed in position and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 2,155.68 | Cum | - | - |
| 5 | Plain Cement Concrete M20 Grade in CC Block (300 mmX600 mmX150 mm), Toe Wall, with Coarse Sand having F.M. Not less than 2.5, Crushed Stone Aggregate of nominal size of 4.75 mm to 20 mm ( dalla grit), Mechanically mixed, placed in position and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 1,724.11 | Cum | - | - |
| 6 | Plain Cement Concrete M20 Grade in 125 mm thick Lining with Coarse Sand having F.M. Not less than 2.5, Crushed Stone Aggregate of nominal size of 4.75 mm to 20 mm ( dalla grit), Micro polymeric fibers, Mechanically mixed, placed in position with Concrete Paver Machine and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 30,995.46 | Sqm | - | - |
| 7 | Providing and laying Steel in Reinforcement including cost of steel carriage, bending, cutting, placing in position and binding with steel binding wire etc. including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specification. | 22.46 | MT | - | - |
| 8 | Supplying and laying Coarse Sand below Stone Grit with proper compaction and rolling including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 1,198.35 | Cum | - | - |
| 9 | Supplying and laying Stone Grit 4.75 -10 mm ( dalla) below Cement Concrete lining with proper compaction and rolling including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 1,198.35 | Cum | - | - |
| 10 | Providing & Laying LDPE Sheet on below lining and below cut off wall including cost of all materials, labour, T&P etc required for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. | 30,274.2 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.92 MB
BID6.pdf
Tender Documents • 2.99 MB
BOQ_2197655.xls
BOQ • 0.29 MB
crr_dt.pdf
PDF • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .