Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹11.0 L+₹12,273.26 (1.13%)Accepted-Finance | L2 | Accepted-Finance Admitted |
Tender Value
₹11.0 L
EMD Value
₹12,000
Closing Date
18 Aug 2022, 3:00 pmClosed
Projet Director
DRDA Krishnagiri
Krishnagiri DT - AGAMT II 2021-22 Mathur Block - Providing barbed wire fencing and green shed and Construction of Vertical Filter at Bommepalli and Goundanur Panchayats 4 works TN-04-KRI-417
2022_RDTN_245147_1
RocNo_42_2022_R10_22_07_2022
Open Tender
Civil Works - Others
Item Rate
180 days
Krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹12,000
DRDA Krishnagiri
7 Sept 2022
2 Aug 2022
18 Aug 2022
2 Aug 2022
18 Aug 2022
2 Aug 2022
3 Aug 2022
Amount
1. Providing barbed wire fencing and green shed to MGNREGS Morunga nursery @ Pandarankottai H/o Bommepalli-Rs.2.61492/- Lakhs
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick.,
Cement concrete 1 : 2 : 4 mix using 20mm ISS HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick.,
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all cost
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Supply and fixing of Barbed wire including all cost and conveyance etc., all complete
Provision for erection charges for precast concrete vertical post including all labour charges etc complete
Provision for tieing the vertical post including all labour charges
Provision for Name Board
2. Construction of Vertical fiter at Pandarankottai H/o Bommepalli-Rs.2.89/- Lakhs
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Drain
Soak pit chamber
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all cost
Cement concrete 1 : 3 : 6 mix using 40mm ISS HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick.,
Plastering with CM 1:4, 20mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Supply and Filling of rough stone from approved quarry Including conveyance
Supply and Filling of 40 mm Metal from Approved Qurry including Cost and Conveyance
Supply and Filling of 20 mm Metal from Approved Qurry including Cost and Conveyance
Supply and Filling of 20 mm brick jellly including Cost and Conveyance
Collection and supply of Gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and levelling to required profile
Supply and Filling of Char Coal including all labour charges
Supply and Fixing of 0.60x0.60m Vertical Filter Cover slab
supplying and fixing of 110mm dia 6ksc pvc pipe including all cost and conveyance etc., all complete
Supply and Fixing of 1m dia RCC ring
Supply and Fixing of 1m dia RCC ring cover slab
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
Provision for Name Board
3. Providing barbed wire fencing and green shed to MGNREGS Morunga nursery @ Kamalapuram H/o Goundanur-Rs.2.75424/- Lakhs
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick.,
Cement concrete 1 : 2 : 4 mix using 20mm ISS HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick.,
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all cost
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Supply and fixing of Barbed wire including all cost and conveyance etc., all complete
Provision for erection charges for precast concrete vertical post including all labour charges etc complete
Provision for tieing the vertical post including all labour charges
Provision for Name Board
4. Construction of Vertical fiter with drain at Kamalapuram Koot road H/o Goundaur-Rs.2.77/- Lakhs
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Drain
Soak pit chamber
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all cost
Cement concrete 1 : 3 : 6 mix using 40mm ISS HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick.,
Plastering with CM 1:4, 20mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Supply and Filling of rough stone from approved quarry Including conveyance
Supply and Filling of 40 mm Metal from Approved Qurry including Cost and Conveyance
Supply and Filling of 20 mm Metal from Approved Qurry including Cost and Conveyance
Supply and Filling of 20 mm brick jellly including Cost and Conveyance
Collection and supply of Gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and levelling to required profile
Supply and Filling of Char Coal including all labour charges
Supply and Fixing of 0.60x0.60m Vertical Filter Cover slab
supplying and fixing of 110mm dia 6ksc pvc pipe including all cost and conveyance etc., all complete
Supply and Fixing of 1m dia RCC ring
Supply and Fixing of 1m dia RCC ring cover slab
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SA Constructions
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .