Loading…
Loading…
Tender ID
Tender Value
₹3.9 L
EMD Value
₹39,341
Closing Date
18 Mar 2026, 3:00 pmClosed
c. E office
c. eoffice kanpur nagar nigam
zone-01 ward-01 ke antargat LaxmiPurwa me Talwa Mandi Urinal ke Pass Khastigrast Dot NAla Ka Sudhar Ka Kray
2026_NNKAN_1125891_1
525/AA-1/2025-26
Open Tender
Civil Works
Fixed-rate
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹39,341
Yes
18 Mar 2026
16 Mar 2026
18 Mar 2026
16 Mar 2026
18 Mar 2026
16 Mar 2026
Danoning of damage to moluding stacking diomentat materiale duienes etc all comp
Earth work in excavation means (hydraulic excavator manual means in foundation trenches arc drains (not exceeding 15 mu in wide or 10sses on plan excavation soil and disposal off sarfans cravated soil as directed, within lead of 50 m. inchiding dresing of sade and ramming of bottoms, lift up to 1.5 m, including getting out the all kinds of soil.
construction of a chamber 1200x1200x1000 mm elc all comp
M-150 h/w with 14 cemem & Csand mortar is all comp Super structure
providing and laying in cement cone Concrete 1:15:3(1 Cementi Sc sand and 3 graded stone Ballast 20 mm
Cartage of carth and diumenial material upto 100km including loading unloading etc all comp
15 mm thick thick cement plaster (of neet cement of cement and marble dust on rough side 1:4 cement c sand for celling etc all comp.
providing and laying in cement conc Concrete 14:8(1 Cement4 fine sand and 8 gauge Brick Ballæstiand curing comp including cost of form work in foundation and floors etc all comp.
RCC work with cement approved coarse sand and 20mm approved stone ballast in proportion for raft Beam, column and slab 1:1.5:3 (1 cemnt 1.5 C. sand 20 mm size stone ballast) including bending binding and fixing of reinfocement in position casting cutting of wall and satisfaction of the engineer in charge but excluding cost of all material centering, shuttring cost of reinforcement etc all complete including shuttring
M.S. or iron in plain work such as reinforcement concrete or reinforced brick, work (when not icluding over rate) wrought torequired shape as necessary including bending for proper complition of the work and including suply of steel as wastage bend hooks and authorized ocerlaping shall be measured up two floor two level (over all rate)
Disilting of nala under liqued mud under foul position etc all comp.
cariage of silt under bucket etc all comp
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.85 MB
BOQ_2099274.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .