| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.1 LAccepted-AOC | L1 | Accepted-AOC Being lowest bidder | |
| 2 | L2₹11.1 L+₹1,300 (0.12%)Rejected-Finance | L2 | Rejected-Finance Not Lowest Bidder | |
| 3 | L3₹12.1 L+₹99,750 (8.97%)Rejected-Finance H NO 282 GREEN CITY II BATHINDA | BATHINDA | PUNJAB | 151001 | L3 | Rejected-Finance Not Lowest Bidder | |
| 4 | L4₹12.4 L+₹1.3 L (11.5%)Rejected-Finance | L4 | Rejected-Finance Not Lowest Bidder |
Tender Value
₹19.5 L
EMD Value
₹39,000
Closing Date
27 May 2020, 6:00 pmClosed
CWE Bathinda
HQ CWE Bathinda, Bathinda Military Station
SPECIAL REPAIRS TO INTERNAL ROAD OF APPROXIMATE LENGTH OF 1500 METER IN UNIT LOCATION OF SATA UNDER GE (N) BATHINDA AT BATHINDA MIL STN
2020_MES_332247_1
CA NO CWE BTD 03 of 2020-21
Open Tender
Civil Works - Roads
Item Rate
120 days
Bathinda Mil Station
As per NIT
7 documents required · 7 mandatory
₹500
GE North Bathinda
₹39,000
Yes
4 Jun 2020
7 Mar 2020
29 May 2020
7 Mar 2020
27 May 2020
27 Mar 2020
7 Mar 2020 - 14 Mar 2020
Amount
Preparing black top bituminous surfaces by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally fanning the cleaned surfaces with air pressure through air jet using air compressor to remove all loose dirt etc including removing the mud etc to a distance minimum 1.5 m from edge of road and applying evenly a tack coat of bituminous primer using paving bitumen (VG-10) @ 5 Kg per 10 Sqm of road surface by sprayer operated hot pressure mechanism including Supplying, laying, spreading 30 mm consolidated thickness of semi dense asphaltic concrete with Job mix formula using paving bitumen (VG-30) at the rate of 5.5% binder content by weight of total mix using mechanical paver for leveling within the specified tolerance as specified in SSR Part - I, rolled and consolidated to required camber and gradient with power roller for uniform smooth surface etc complete all as specified and directed by Engineer-in-Charge. Note :- (i) The job mix formula shall be approved by GE. (ii) 5.5% binder content has been specified for quoting purpose of bid. If the quantity of the bitumen exceeds 5.5% as mentioned in Schedule A / BOQ during job mix formula, no plus price adjustment shall be made. If the quantity of the bitumen required as per job mix formula works out to less than 5.5% the recovery of the supply only bitumen shall be effected @ Rs 30.00 per Kg. The cost of transportation of material and testing chrges shall be borne by the Contractor.)
Repairs to potholes not exceeding 1 sq m each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths etc. cutting around edges to at least 25 mm in depth and applying tack coat @ 5 kg per 10 sq m of paving bitumen (VG-10), putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 kg per 10 sq m of paving bitumen (VG-30), blinded with 0.09 cum of stone chippings, 6.3 mm size and again well rammed, depth of pot holes exceeding 30mm. Note: (i) Pot holes shall be marked and checked by Engineer-in-charge. 100% quantity before commencement of work and shall also be entered in MB with reference to permanent objects before starting carpeting work. (ii) Rate quoted by contractor shall deemed to be including of supply of premixed macadam binder and chippings.
Supplying, laying & spreading upto 75 mm thick (consolidated thickness) premix bituminous macadam filling in depression (using 20 mm graded stone aggregate) in single layer with using mechanical paver using paving bitumen (VG-30) @ 4 % by weight of total mix with job mix formula, laid / rolled and compacted / consolidated to required camber and gradient with 8 to 10 tonne power roller to a uniform smooth surface etc complete all as specified and directed. Note :- (i) The job mix formula shall be approved by GE. (ii) 4.0% binder content has been specified for quoting purpose of bid. If the quantity of the bitumen exceeds the 4% as mentioned above, no plus price adjustment shall be made. If the quantity of bitumen required as per job mix formula works out less than 4.0%, the recovery of the supply only bitumen shall be effected @ Rs. 30/- per Kg. The cost of transportation of material and testing charges shall be borne by the contractor.
M&L for painting lines, dashes, arrows, letters, marking etc of 2.0 mm thick film on new surfaces or previously treated road surfaces with hot applied retro reflective thermoplastic road marking paint (White / Golden yellow) conforming to MORT&H (clause 803.4) all as specified with 8% glass beads using special applicator machine with heating arrangement upto 160 degree C including cleaning and drying the existing road surfaces to ensure dust, oil, grease and moisture free surfaces before applying the paint complete all as specified and directed. Make : Automark or equivalent make given in Appx 'B'.
S&F solar road stud having 3 LED of colour Red/Yellow to a side (total 6 Nos) housed in a tough pressure die casted aluminium alloy of size 125 x 125mm or 120 x 130mm with built in stem of suitable length for fixing with epoxy, LEDs solar cells battery & light sensor well protected inside under tough unbreakable polycarbonate transparent sheet top system, workable for 2-3 days (night) after full charge in 8 to 10 Hrs. (Cat part No DA-110/SOLAR STUD DHRUV of Make Dark Eye or equivalent Make of 3M/ Greenlite
S&F in repairs delineator 600 mm long made of ABS material round body, fitted with 2 numbers 100mm dia high intensity prismatic reflectors made out of PMMA and mounted on and including 50 mm dia MS Pipe, powder coated (shade as approved by GE), anti rust and anti theft steel nut of suitable size and fixing in cement concrete (1:2:4) type B1 using 20mm graded stone aggregate with size of block 450mmx450mmx600mm deep including excavation and earth work in any strata complete all as directed by Engineer-in-charge. Note : - The rate of PCC & earth work is included in the unit quoted rate. (Make :- Cat Part No GPL-11-01 of Greenlite or equivalent Make of Dark eye / 3M)
M&L Moorum / red bajri filling in floor or pavings , laid in layers not exceeding 15 cm thick , spread , levelled and rammed including watering complete all as specified and as directed.
RINKU BROTHERS
M/s Azure Infrastructure Construction Co.
FAIR DEAL CONSTRUCTION CO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .