Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹13.2 L
EMD Value
₹13,300
Closing Date
12 Nov 2026, 12:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE ECTC AGRA
220 KV S/S Sikandra, Agra
Civil works related to the Maintenance of Damaged Security Wall (front portion) and repair for waterlogging at 400 KV Substation Akrabad, Distt- Aligarh. (Group-2)
2026_UPCTL_1194981_1
Tender No-23/ECTC/A/2026-27
Open Tender
Civil Works
Percentage
120 days
Civil works related to the Maintenance of Damaged
Please refer the tender document
2 documents required · 2 mandatory
₹1,770
EE ECTD ALIGARH
₹13,300
14 Oct 2026
14 Oct 2026
13 Nov 2026
14 Oct 2026
12 Nov 2026
14 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil (SOR No. 2.6.1) | - | Cum | 134.12 | - |
| - | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift.(SOR No. 2.25a) | 300 | Cum | 464.81 | ₹1,39,443 |
| - | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.(SOR No. 2.31) | 1,400 | Sqm | 13.3 | ₹18,620 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)(SOR No. 4.1.2) | 2 | Cum | 6,302.41 | ₹12,604.82 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement: 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)(SOR No. 4.1.8) | 4 | Cum | 5,147.2 | ₹20,588.8 |
| - | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).(SOR NO. 5.2.2) | 2 | Cum | 8,200.57 | ₹16,401.14 |
| - | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (SOR No. 5.3) | 2.1 | Cum | 8,693.64 | ₹18,256.64 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform . (SOR No. 5.9.3) | 15 | Sqm | 700.64 | ₹10,509.6 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers . (SOR No. 5.9.5) | 6 | Sqm | 556.43 | ₹3,338.58 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts(SOR NO. 5.9.6) | 30 | Sqm | 726.37 | ₹21,791.1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.09 MB
BOQ_2256558.xls
BOQ • 0.29 MB
Tender Booklet.pdf
Tender Documents • 0.57 MB
T23.pdf
Tender Documents • 3.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .