Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.2 LAdmitted-Finance | ₹17.2 L | L1 | Admitted-Finance |
| 2 | L2₹17.8 LAdmitted-Finance | ₹17.8 L | L2 | Admitted-Finance |
| 3 | L3₹18.0 LAdmitted-Finance | ₹18.0 L | L3 | Admitted-Finance |
| 4 | L4₹23.2 LAdmitted-Finance | ₹23.2 L | L4 | Admitted-Finance |
| 5 | L5₹28.8 LAdmitted-Finance | ₹28.8 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Vivechana Constructions L4 | KRISHNAMURTHY CONSTRUCTIONS L1 | NIRMALA BUILDERS AND DEVELOPERS L2 | M LOKESH REDDY (CIVIL CONTRACTOR) L5 | M.VENKATACHALAPATHI L3 |
|---|---|---|---|---|---|---|---|---|
| 1.01 | Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.), MS flats and MS solid bars etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc complete. Hot finished seamless type tubes of horizontals (60mm X 40mm) RHS at the top and 25mm X 5mm MS flat running at the centre and vertically 16mm dia MS round bar will be inserted at the interval as exists in the existing railing at all the areas , including cost of materials,labour, usage charges of machinery complete as per specifications, drawings and as per directions of the Engineer-in-Charge.(Make: SAIL, JSW, TATA steel, VIZAG), (Welding rods: Ador) (Refer detailed drawings for clarity).
The rate quoted shall include the cost of material, labour,transportation, all lead and lifts , necessary staging ,scaffolding etc complete including all incidentials. | 561 | Sqm | 3,650 ₹20.5 L | 2,825 ₹15.8 L | 2,925 ₹16.4 L | 4,680 ₹26.3 L | 2,900 ₹16.3 L |
| 1.02 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. | 561 | Sqm | 190 ₹1.1 L | 140 ₹78,540 | 156 ₹87,516 | 339 ₹1.9 L | 117 ₹65,637 |
| 1.03 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One coats on old work as per specifications and as per directions of Engineer in charge. | 561 | Sqm | 160 ₹89,760 | 70 ₹39,270 | 62 ₹34,782 | 87 ₹48,807 | 100 ₹56,100 |
| 1.04 | Providing and fixing expansion hold fasteners on C.C. /R.C.C./Brick masonry surface backing including drilling necessary holes and the cost of bolt etc complete. | 255 | Each | 310 ₹79,050 | 50 ₹12,750 | 50 ₹12,750 | 60 ₹15,300 | 200 ₹51,000 |
Tender Value
₹19.3 L
EMD Value
₹48,250
Closing Date
20 Mar 2026, 3:00 pmClosed
Chief Manager (Infrastructure)
Chief Manager (Infrastructure), Estate Section, II Floor, Admin Block, IIMB Bannerghatta Road Campus, Bilekahalli, Bangalore
Provision of additional railings for safety at MNOP hostel blocks at IIM Bangalore
2026_IIMB_900243_1
CMI/SMCD/182/2025-26
Open Tender
Civil Works
60 days
IIMB Bilakahalli, Bangalore
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹48,250
Estate Section, IIMB Bannerghatta Road Campus
1 Apr 2026
25 Feb 2026
23 Mar 2026
25 Feb 2026
20 Mar 2026
6 Mar 2026
6 Mar 2026
Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.), MS flats and MS solid bars etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc complete. Hot finished seamless type tubes of horizontals (60mm X 40mm) RHS at the top and 25mm X 5mm MS flat running at the centre and vertically 16mm dia MS round bar will be inserted at the interval as exists in the existing railing at all the areas , including cost of materials,labour, usage charges of machinery complete as per specifications, drawings and as per directions of the Engineer-in-Charge.(Make: SAIL, JSW, TATA steel, VIZAG), (Welding rods: Ador) (Refer detailed drawings for clarity). The rate quoted shall include the cost of material, labour,transportation, all lead and lifts , necessary staging ,scaffolding etc complete including all incidentials.
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One coats on old work as per specifications and as per directions of Engineer in charge.
Providing and fixing expansion hold fasteners on C.C. /R.C.C./Brick masonry surface backing including drilling necessary holes and the cost of bolt etc complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
TenderDrawing.pdf
Additional Documents • 0.04 MB
BOQ_946242.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid