Loading…
Loading…
Tender Value
₹2.0 Cr
EMD Value
₹4.1 L
Closing Date
5 Oct 2026, 5:00 pm
Sandeep Dahiya
DIV Faridabad
Upgradation and Special Repair of Atal Park in Sec-2, Fbd, inclu. Construction of Synthetic Track, Installation of Fountain, Construction of Main Entry Gate and Other Allied Civil and Beautification Works Inclu 3 Year mtc. and Defect Liability Period
2026_HBC_549777_1
2026C68AB5DA 011F 4ED5 9F6F EB6D452886FF248HSV
Open Tender
Civil Works
Works
545 days
Faridabad (MC)
Upgradation and Special Repair of Atal Park in Sec-2, Fbd, inclu. Construction of Synthetic Track, Installation of Fountain, Construction of Main Entry Gate and Other Allied Civil and Beautification Works Inclu 3 Year mtc. and Defect Liability Period
2 documents required · 2 mandatory
₹3,000
₹4.1 L
Yes
24 Sept 2026
24 Sept 2026
6 Oct 2026
24 Sept 2026
5 Oct 2026
24 Sept 2026
24 Sept 2026 - 26 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Synthetic track work [6.15.1]Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 211.2 | per cum | 5,969 | ₹12,60,652.8 |
| 2 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 142.56 | per cum | 78 | ₹11,119.68 |
| 3 | [17.15.2]Granular Sub-Base with Coarse Graded Material - Grading-I or II or III (Table:- 400-2)
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORTandH specifications 2. Grading II material [Through Rate] | 205.92 | per cum | 1,044 | ₹2,14,980.48 |
| 4 | [7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] | 133.58 | per cum | 4,128 | ₹5,51,434.75 |
| 5 | [6.1.5]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 5. 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size) [Through Rate] | 133.76 | per cum | 2,876 | ₹3,84,693.76 |
| 6 | Providing and laying jogging track (8 plus 8) 16mm thick (average) rubberized flooring of Two Layer Permeable EPDM and SBR System approved by FIBA product and specification system on the concrete surface as per detail given below:
a) 1st layer PU (Polyurethane) Primer coat on existing hard base including cleaning the existing surface.
b) 2nd layer of 8 mm thick Black SBR (Styrene Butadiene Rubber) granules 1-4mm thick mixed with 18-20% single component PU binders.
c) 3rd and top layer 8 mm thick coloured EPDM (Ethylene Propylene Diene Monomer) rubber granules coloured 1-3.5mm thick mixed with 18-20% single component PU binders. track
All complete as per direction of Engineer-in-Charge and as per manufacturers specifications. | 1,056 | per sqm | 6,187.5 | ₹65,34,000 |
| 7 | [11.8.1]12 mm cement plaster of mix : 1. 1:4 (1 cement: 4 coarse sand) [Through Rate] | 1,056 | per sqm | 114 | ₹1,20,384 |
| 8 | Providing and Installation of Fountain [17.6]Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. [Through Rate] | 97.92 | per cum | 184 | ₹18,017.28 |
| 9 | [6.15.1]Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 19.58 | per cum | 5,969 | ₹1,16,896.9 |
| 10 | [10.51]Providing and fixing granite stone in all shades 15mm to 18 mm thick in skirting /dado, risers of steps, pillars and wall facing, laid in any pattern as specified over base of 12mm thick cement coarse sand mortar 1:3 and jointed with white cement slurry mixed with pigment to match the shade of Granite including labour for fixing cramps pins and dowels etc. [Through Rate] | 357 | per sqm | 2,534 | ₹9,04,638 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_629532.xls
BOQ • 0.40 MB
EMF366Z179988.pdf
Additional Documents • 0.24 MB
OT0179988.pdf
Other Document • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .