Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | i₹4.9 LAccepted-AOC | i | Accepted-AOC Being lowest | |
| 2 | ii₹5.0 LRejected-Finance B 35 DURGA PALACE SAINIK VIHAR DEORI ROAD AGRA UP | ii | Rejected-Finance Other than lowest | |
| 3 | iii₹5.5 LRejected-Finance 64 250 2 COD ROAD HASTINAPURI MADHU NAGAR AGRA 282001 | AGRA | AGRA | UTTAR PRADESH | 282001 | iii | Rejected-Finance Other than lowest |
Tender Value
Refer Docs
Closing Date
30 May 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (West) Agra
GE (West) Agra
JOB ORDER FOR REPAIR/REPLACEMENT OF AC PLANTS OF (CHILLAR TYPE) 3 X 20 TR AT SIGNNAL CENTRE, 3 X 9.5 TR AT ICU, X RAY, LABOR DELIVERY ROOM AND 3 X 14 TR AT OT MH AGRA UNDER GE (WEST) AGRA
2022_MES_525655_1
3340/Q/01/E3/2022-23
Limited
Miscellaneous Works
Works
30 days
GE (West) Agra
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
26 Jul 2022
23 May 2022
1 Jun 2022
24 May 2022
30 May 2022
24 May 2022
45 days
Amount
The undermentioned job order for :- (a) Checking detecting and arresting/rectifying of the leakage by putting nitrogen gas pressures to entire system and rectifying the leakage where found by welding/brazing soldering with copper electrode rod and holding nitrogen pressure in entire sysrtem for minimum 08 hours in package type AC units Model No DPUASC 220 X having compressure's 3 x 20 TR capacity and material and labour for repairing the leakage if detected, vaccum & and checking for vaccum pressure holding stand for 24 hours and charging the refrigerant gas R-22 as required and top up of compressure oil if required complete all as specified and directed. Note :- Refrigerant gas R-22 and compressure oil shall be measired and paid separately under respective item herein after. Qty-02 Each (b) Descaling the entire water circulation system of 2 x 20 TR Chillar Plant including condensor but excluding mono block pump set from existing AC plants by circulating de scaling solution with the help of de scaling pump circulatiing acid independently in each tube by gravity cleaning the condensor tubing with brush including renewal of worn out gasket ,nuts and bolts complete all as specified and directed. Qty-02 Each (c) Dismantling and taking out existing defective burnt part of AC electric condensor (Outdoor unit) Pump motor of any description and in any position of capacity 5 HP for rewinding from approved workshop including transporting the same to workshop and back after rewinding the same motor with and including super enamelled copper winding wire of superior quality of existing size /gauge and No of turns and insulation of the same with and including insulating material such as leatherrised fiber glass iluminious paper , cotton tape, glass sleeving insulating varnish including replacement of bushes , bearings and condensor with new bushes and bearing & condensor complete reassembling and refixing of the same motor at its original position after repair and making all necessary connections and testing on completion complete all as specified and as dircted by Engr-in-Charge. QTy- 01 Each. (d) Dismantling and taking out existing defective burnt part of AC electric condensor (Outdoor unit) CT Fan motor of any description and in any position of capacity 5 HP for rewinding from approved workshop including transporting the same to workshop and back after rewinding the same motor with and including super enamelled copper winding wire of superior quality of existing size /gauge and No of turns and insulation of the same with and including insulating material such as leatherrised fiber glass iluminious paper , cotton tape, glass sleeving insulating varnish including replacement of bushes , bearings and condensor with new bushes and bearing & condensor complete reassembling and refixing of the same motor at its original position after repair and making all necessary connections and testing on completion complete all as specified and as dircted by Engr-in-Charge. Qty 01 Each. (i) Repair of LT electyric control panel board cleaning inside with blower , servicing tightening all electrical connections/contacts points, replacing defective locking clips thimble and making it serviceable with inter locking wiring including replacement of the defective parts and refixing back in its existing position complete all as specified and directed. Qty-01 Each Note :- Defective parts will be measured and paid separately. (ii) Supply Power contactor ML 4, 32 Amps complete all as specified . Qty-02 Each (iii) Supply Thermal over load relay ML type 32 Amps complete all as specified. Qty-02 Each. (e) Supply Connector of compressor complete all as specified. Qty-06 Each (f) Supply and charge refrigerant R-407 gas in cylinders of required capacity of cylinders including testing complete all as specified and directed by Engr- in -chagre.Location : Signal Centre . Qty-15 Kgs OT , ICU, LABOR DELIVERY ROOM AND X RAY ROOM AT M H:- (g) Checking detecting and arresting/rectifying of the leakage by putting nitrogen gas pressures to entire system and rectifying the leakage where found by welding/brazing soldering with copper electrode rod and holding nitrogen pressure in entire sysrtem for minimum 08 hours in package type AC units Model No smc 3-65 Make - ACCEL having compressure's (3 x 9.5 TR = 03 Nos and 3x 14 TR = 01 No) different capacity and material and labour for repairing the leakage if detected, vaccum & and checking for vaccum pressure holding stand for 24 hours and charging the refrigerant gas R-22 as required and top up of compressure oil if required complete all as specified and directed. Qty-08 Each Note :- Refrigerant gas R-22 and compressure oil shall be measired and paid separately under respective item herein after. (h) Descaling the entire water circulation system of AC Plant including condensor but excluding mono block pump set from existing AC plants by circulating de scaling solution with the help of de scaling pump circulatiing acid independently in each tube by gravity cleaning the condensor tubing with brush including renewal of worn out gasket ,nuts and bolts complete all as specified and directed.Qty-08 Each (j) Repair of LT electyric control panel board cleaning inside with blower , servicing tightening all electrical connections/contacts points, replacing defective locking clips thimble and making it serviceable with inter locking wiring including replacement of the defective parts and refixing back in its existing position complete all as specified and directed. Note :- Defective parts will be measured and paid separately. Qty-1 Each (i) Supply Power contactor ML 4, 32 Amps complete all as specified . Qty-08 Each (ii) Supply Thermal over load relay ML type 32 Amps complete all as specified. Qty-08 Each (iii) Supply Connector of compressor complete all as specified. Qty-08 Each (k) Supply and charge refrigerant R-22 gas in cylinders of required capacity of cylinders including testing complete all as specified and directed by Engr- in -chagre.Location : Signal Centre. Qty-98 Kgs (l) Supply and fixing fan belt of blower unit of existing size complete all as specified and as directed by Engr-in-Charge. Qty-05 Each Note:- Old dismantling material shall be contractor property.
M/s Lord Krishna Enterprises
Allied Builders
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_587418.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .