| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 CrAccepted-AOC | ₹7.3 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹7.9 Cr+₹51.3 L (6.98%)Rejected-Finance NATIONAL TOWER 5TH FLOOR SCO 89 DSC RANJIT AVENUE AMRITSAR 143001 PUNJAB | AMRITSAR | AMRITSAR | PUNJAB | 143001 | ₹7.9 Cr+₹51.3 L (6.98%) | L2 | Rejected-Finance Being other than L1 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Firm not submitted integrity pact |
| 4 | Rejected-Technical | - | - | Rejected-Technical Firm does not meet NIT criteria with regard to class |
Tender Value
₹6 Cr
EMD Value
₹3 L
Closing Date
16 Dec 2022, 6:00 pmClosed
DG MAP
DG MAP New Delhi
Completion of balance work for construction of residential accommodation at kapurthala
2022_MES_528886_3
82826 KAPURTHALA
Open Tender
Civil Works
Lump-sum
270 days
Kapurthala
As per NIT
8 documents required · 8 mandatory
₹3,000
DG MAP New Delhi
₹3 L
Yes
21 Feb 2023
11 Nov 2022
19 Dec 2022
11 Nov 2022
16 Dec 2022
2 Dec 2022
11 Nov 2022 - 25 Nov 2022
Amount
1. SCHEDULE A SECTION I
Completion of Balance work for construction of block Nos. O1,O2,04,05 & O6 of 06 Dwelling Units in triple storied construction ( Ground +2 storeyes). for "ORs" at Pocket A1 ,Kapurthala Army complete all as specified and shown on drawings in respect of following balance works:- Kitchen Plate Rack ( 6 Nos) Terrace RCC perforated Shaft Covers ( 4 nos ) ,Drip Course in balcony ( 86 Rm) ,CI Pipes in shafts above Terrace ( 12 Rm) ,GT covers ( 4 Nos ) and Letter Boxes ( 6 Nos )
Completion of Balance work for construction of block No. O7 of 06 Dwelling Units in triple storied construction ( Ground +2 storeyes). for "ORs" at Pocket A1 ,Kapurthala Army complete all as specified and shown on drawings in respect of following balance works:-Kitchen Plate Rack,( 6 Nos) CP wash basin mixer ( 12 Nos ),SS Kitchen sink ( 6 Nos), CP sink mixer ( 6 Nos) ,Chinaware- Wash Basin ( 6 Nos) ,EWC with cistern and fittings ( 6 Nos ) ,,Anglo Indian WC with cistern and fittings ( 6 Nos ) Final coat of Painting ( 6 DUs) and Toilet acessories- 12 Nos each - ( peg set of 6 ,Toilet paper holder ,Mirror, Towel Rail, Towel Ring, Glass shelves&Glass tray) Terrace RCC perforated Shaft Covers ( 4 nos ) , in balcony ( 86 Rm),CI Pipes in shafts above Terrace ( 12 Rm) ,cooler stands ( 18 Nos) .,GT covers ( 4 Nos ) andLetter Boxes( 6 Nos)
Completion of Balance work for construction of block Nos. O8,O9,O10,O11,O12,O13 & O14 of 06 Dwelling Units in triple storied construction ( Ground +2 storeyes). for "ORs" at Pocket A2 ,Kapurthala Army complete all as specified and shown on drawings in respect of following balance works:-Kitchen Plate Rack ( 6 Nos) Terrace RCC perforated Shaft Covers ( 4 nos ) ,Drip Course in balcony ( 86 Rm) ,CI Pipes in shafts above Terrace ( 12 Rm) ,GT covers ( 4 Nos ) and 6 Nos Letter Boxes
Completion of Balance work for construction of block No. O15 of 06 Dwelling Units in triple storied construction ( Ground +2 storeyes). for "ORs" at Pocket A3 ,Kapurthala Army complete all as specified and shown on drawings in respect of following balance works:- Kitchen Plate Rack ( 6 Nos) Terrace RCC perforated Shaft Covers ( 4 nos ) ,Drip Course in balcony ( 86 Rm) ,CI Pipes in shafts above Terrace ( 12 Rm) ,GT covers ( 4 Nos ) and Letter Boxes (6 Nos)
Completion of Balance work for construction of block No O16,O17,O18,O19,O20,O21,O22,O23 & O24 of 06 Dwelling Units in triple storied construction ( Ground +2 storeyes). for "ORs" at Pocket A3 ,Kapurthala Army complete all as specified and shown on drawings in respect of following balance works:- Kitchen Plate Rack ( 6 Nos) Terrace RCC perforated Shaft Covers ( 4 nos ) ,Drip Course in balcony ( 86 Rm) ,CI Pipes in shafts above Terrace ( 12 Rm) ,GT covers ( 4 Nos ) and Letter Boxes (6 Nos)
Completion of Balance work for construction of block No. O3 of 06 Dwelling Units in triple storied construction ( Ground +2 storeyes). for "ORs" at Pocket A4 ,Kapurthala Army complete all as specified and shown on drawings in respect of following balance works:- Kitchen Plate Rack ( 6 Nos) Terrace RCC perforated Shaft Covers ( 4 nos ) ,Drip Course in balcony ( 86 Rm) ,CI Pipes in shafts above Terrace ( 12 Rm) ,GT covers ( 4 Nos ) and Letter Boxes (6 Nos)
Completion of Balance work for construction of block No. O25 of 06 Dwelling Units in triple storied construction ( Ground +2 storeyes). for "ORs" at Pocket A4 ,Kapurthala Army complete all as specified and shown on drawings in respect of following balance works:- Kitchen Plate Rack,( 6 Nos) CP wash basin mixer ( 12 Nos ),SS Kitchen sink ( 6 Nos), CP sink mixer ( 6 Nos) ,Chinaware- Wash Basin ( 6 Nos) ,EWC with cistern and fittings ( 6 Nos ) ,,Anglo Indian WC with cistern and fittings ( 6 Nos ) Final coat of Painting ( 6 DUs) and Toilet acessories- 12 Nos each - ( peg set of 6 ,Toilet paper holder ,Mirror, Towel Rail, Towel Ring, Glass shelves&Glass tray) Terrace RCC perforated Shaft Covers ( 4 nos ) , in balcony ( 86 Rm),CI Pipes in shafts above Terrace ( 12 Rm) ,cooler stands ( 18 Nos) .,GT covers ( 4 Nos ) andLetter Boxes( 6 Nos)
Completion of Balance work for construction of block Nos. O26,O27,O28,O29,O30 &,O31 of 06 Dwelling Units in triple storied construction ( Ground +2 storeyes). for "ORs" at Pocket A4 ,Kapurthala Army complete all as specified and shown on drawings in respect of following balance works:- Kitchen Plate Rack ( 6 Nos) Terrace RCC perforated Shaft Covers ( 4 nos ) ,Drip Course in balcony ( 86 Rm) ,CI Pipes in shafts above Terrace ( 12 Rm) ,GT covers ( 4 Nos ) and Letter Boxes (6 Nos)
Completion of Balance work for construction of block No. O32 of 06 Dwelling Units in triple storied construction ( Ground +2 storeyes). for "ORs" at Pocket A4 ,Kapurthala Army complete all as specified and shown on drawings. Kitchen Plate Rack ( 6 Nos) Terrace RCC perforated Shaft Covers ( 4 nos ) ,Drip Course in balcony ( 86 Rm) ,CI Pipes in shafts above Terrace ( 12 Rm) ,GT covers ( 4 Nos ) and Letter Boxes (6 Nos ) as per CA specifications and drawings
Completion of Balance work for construction of block Nos. O33,O34,O35,O36,O38 ,O39,O40,041,O42 & O43 of 06 Dwelling Units in triple storied construction ( Ground +2 storeyes). for "ORs" at Pocket A5 ,Kapurthala Army complete all as specified and shown on drawings in respect of following balance works:- Kitchen Plate Rack ( 6 Nos) Terrace RCC perforated Shaft Covers ( 4 nos ) ,Drip Course in balcony ( 86 Rm) ,CI Pipes in shafts above Terrace ( 12 Rm) ,GT covers ( 4 Nos ) and Letter Boxes (6 Nos)
Completion of Balance work for construction of block No. O37 of 06 Dwelling Units in triple storied construction ( Ground +2 storeyes). for "ORs" at Pocket A5 ,Kapurthala Army complete all as specified and shown on drawings in respect of following balance works:- Kitchen Plate Rack,( 6 Nos) CP wash basin mixer ( 12 Nos ),SS Kitchen sink ( 6 Nos), CP sink mixer ( 6 Nos) ,Chinaware- Wash Basin ( 6 Nos) ,EWC with cistern and fittings ( 6 Nos ) ,,Anglo Indian WC with cistern and fittings ( 6 Nos ) Final coat of Painting ( 6 DUs) and Toilet acessories- 12 Nos each - ( peg set of 6 ,Toilet paper holder ,Mirror, Towel Rail, Towel Ring, Glass shelves&Glass tray) Terrace RCC perforated Shaft Covers ( 4 nos ), Drip crouse in balcony ( 86 Rm),CI Pipes in shafts above Terrace ( 12 Rm) ,cooler stands ( 18 Nos) .,GT covers ( 4 Nos ) and Letter Boxes( 6 Nos)
Completion of Balance work for construction of block Nos. O44,O47,O49,O50 &O56 of 06 Dwelling Units in triple storied construction ( Ground +2 storeyes). for "ORs" at Pocket A6 ,Kapurthala Army complete all as specified and shown on drawings in respect of following balance works:- Kitchen Plate Rack,( 6 Nos) CP wash basin mixer ( 12 Nos ),SS Kitchen sink ( 6 Nos), CP sink mixer ( 6 Nos) ,Chinaware- Wash Basin ( 6 Nos) ,EWC with cistern and fittings ( 6 Nos ) ,,Anglo Indian WC with cistern and fittings ( 6 Nos ) Final coat of Painting ( 6 DUs) and Toilet acessories- 12 Nos each - ( peg set of 6 ,Toilet paper holder ,Mirror, Towel Rail, Towel Ring, Glass shelves&Glass tray) Terrace RCC perforated Shaft Covers ( 4 nos ), Drip course in balcony ( 86 Rm),CI Pipes in shafts above Terrace ( 12 Rm) ,cooler stands ( 18 Nos) .,GT covers ( 4 Nos ) andLetter Boxes( 6 Nos)
Completion of Balance work for construction of block Nos. O45,O46,O48,O51,O52 ,O53,O54 &O55 of 06 Dwelling Units in triple storied construction ( Ground +2 storeyes). for "ORs" at Pocket A6 ,Kapurthala Army complete all as specified and shown on drawings in respect of following balance works:- Kitchen Plate Rack ( 6 Nos) Terrace RCC perforated Shaft Covers ( 4 nos ) ,Drip Course in balcony ( 86 Rm) ,CI Pipes in shafts above Terrace ( 12 Rm) ,GT covers ( 4 Nos ) and Letter Boxes (6 Nos)
Completion of Balance work for construction of block Nos. O57,O58,O59,O60,O61 &O 62 of 06 Dwelling Units in triple storied construction ( Ground +2 storeyes). for "ORs" at Pocket A7 ,Kapurthala Army complete all as specified and shown on drawings in respect of following balance works:- Kitchen Plate Rack ( 6 Nos) Terrace RCC perforated Shaft Covers ( 4 nos ) ,Drip Course in balcony ( 86 Rm) ,CI Pipes in shafts above Terrace ( 12 Rm) ,GT covers ( 4 Nos ) and Letter Boxes (6 Nos)
Completion of Balance work for construction of block Nos. JCO -1,JCO-2 & JCO -3 of 06 Dwelling Units in triple storied construction ( Ground +2 storeyes). for "JCOs" at Pocket A8 ,Kapurthala Army complete all as specified and shown on drawings in respect of following balance works:-Kitchen Plate Rack ( 6 Nos) Terrace RCC perforated Shaft Covers ( 4 nos ) ,Drip Course in balcony ( 92 Rm) ,CI Pipes in shafts above Terrace ( 12 Rm) ,GT covers ( 4 Nos ) and Letter Boxes (6 Nos)
Completion of Balance work for construction of block No. JCO -4 of 04 Dwelling Units in Double storied construction ( Ground +1 storeyes). for "JCOs" at Pocket A8 ,Kapurthala Army complete all as specified and shown on drawings in respect of following balance works:- Kitchen Plate Rack ( 4 Nos) Terrace RCC perforated Shaft Covers ( 4 nos ) ,Drip Course in balcony ( 62 Rm) ,CI Pipes in shafts above Terrace ( 12 Rm) ,GT covers ( 4 Nos ) and Letter Boxes (4 Nos)
Completion of Balance work for construction of block Nos. O63,O64,O65,O66,O67 ,O68,O70,O71,O72,O73,074 &O75 of 06 Dwelling Units in triple storied construction ( Ground +2 storeyes). for "ORs" at Pocket C ,Kapurthala Army complete all as specified and shown on drawings in respect of following balance works:- Letter Boxes (6 Nos)
Completion of Balance work for construction of block No. O69 of 04 Dwelling Units in Double storied construction ( Ground +1 storeyes). for "ORs" at Pocket C ,Kapurthala Army complete all as specified and shown on drawings in respect of following balance works:- Letter Boxes (4 Nos)
Construction of block of Garbage Bin including plinth protection around the block at A-7 Pocket complete all as specified and shown on drawings.
Limpsum cost worked by the contracor for rectification of defects for all the blocks as mentioned in Annexure 'A' and A1 enclosed as srl page No. 388 to 392
SCH "A " SECTION - II INTERNAL WATER SUPPLY Total of Sch " A " Section -II B/F from Serial Page No. 44
. SCH "A " SECTION - III INTERNAL ELECTRIFICATION Total of Sch " A " Section -III B/F from Serial Page No. 63
SCH "A " SECTION- IV ROAD,PATH AND CULVERT Total of Sch " A " Section -IV B/F from Serial Page No. 70
SCH "A " SECTION- V AREA DRAINAGE Total of Sch " A " Section -V B/F from Serial Page No.76
SCH "A " SECTION - VII STREET LIGHTING
Material & labour sand filling in and around the cable including in and around punning down for cushioning complete all as specified and as directed by Project Manager.
Supply & laying burnt clay brick (Sub Class 'B') laid in trenches for cable protection complete all as specified and as directed by Project Manager.
Supply and erecting steel tubular swaged poles, Type 410 SP-31 (9 metres long) single swan neck bent to shape complete with cast iron base plate finial taper plug bolts, nuts and screws with and including painting two coats of aluminium paint over a coat of red oxide zinc chromate primer complete all as specified and as directed by Project Manager.
Supply and fixing 1x150 Watt HPSV Street light luminaire Make : Philips, Cat Part No. CRP-330/SON-T150 or equivalent as approved by Project Manager, single piece die cast, deep drawn aluminium housing complete with control gear compartment, Pf improvement capacitors, acrylic cover UV stablize, ballast of dual taping, dynamic power saving device to reduce power & wattage to 100 watt after six hours peak load, prewired complete with and including 1 x 150 Watt HPSV lamp and also including fixing clamp and pipe / nipple suitable for mounting on 50 mm dia G.I. mast or bracket arm with pole fixing attachments and also connecting complete all as specified and as directed by Project Manager.
Material and labour wiring with 3 x 2.5 Sq mm PVC insulated copper conductor single core cables and drawing into steel tubular poles (For street lights from junction box to the fixture) complete all as specified and as directed by Project Manager.
Supply and fixing Junction box for street light pole made out of 1.2 mm CRCA sheet phosphatised powder coated suitable to accommodate loop in / loop out cable terminals, with bus bar and 6A SPN MCB, fixing arrangement to pole including making inter-connections with the fixtures complete including mounting on poles with 2 Nos. 25 x 3 mm flat iron clamps and shutter to be opened / closed vertically with retained ball locking system with size of box not less than 200mm x 100mm x 100mm complete with two coats of synthetic enamel paint over a coat of red oxide zinc chromate primer after preparation of surfaces complete all as specified and as directed by Project Manager.
Supplying, laying testing and commissioning XLPE insulated (Heavy duty) Aluminium conductor armoured cables 4 core, 16 sq mm suitable for working voltage upto and including 1100 Volts, laid or buried in ground complete as required and as per specifications complete all as specified and as directed by Project Manager. Note: Excavation and earth work shall be measured and paid for seperately under appriopriate item of schedule 'A' Section-X
Supplying, laying testing and commissioning XLPE insulated (Heavy duty) Aluminium conductor armoured cables 4 core, 10 sq mm suitable for working voltage upto and including 1100 Volts, laid and buried in ground in trenches complete as required and as per specifications complete all as specified and as directed by Project Manager.
Design, fabrication, supply, installation, testing and commissioning of, 415 V, 3 phase, 50 Hz. street light panel enclosure, dust, vermin and weather proof, outdoor type, IP54 rating, fabricated out of 2.0 mm thick CRCA sheet with hinged and lockable door complete with all inter-connections, internal wiring with copper wire of suitable size, labels etc., duly painted with two coats of synthetic enamel paint over a coat of red oxide zinc chromate primer after preparation of surfaces, with size of panel suitable for mounting following components with and including components detailed below complete all as specified and as directed by Project Manager: Incoming: - 63 Amp TPN MCCB with thermo-magnetic O/C, SC & E/F release 35 KA breaking capacity: 100 Amps Al Bus bar Outgoing: - 16 Amp TPN MCB 10 KA - 4 Nos.
Supply, installation, testing and commissioning of Street light dual automation system, 3-phase, 25 KVA, suitable for mounting in and integration with street lighting panel and automatically switching 'ON' & 'OFF' the street lights as per the sun light level with additional features of pre-programming with switching, LCD display for entire year, by-pass mode for manual operation facility and achieving energy conservation through lighting control of 33%, 66% & 100% including inter-connections etc. complete all as specified and as directed by Project Manager.
Material and labour earthing complete with galvanised steel pipe electrode 40 mm bore medium grade 3 mtr length buried directly and preferably vertically in ground with top edge not less than 1.25 metres below ground level connected with earthing lead of 4 mm dia galvanised iron or steel wire all as shown in plate No. 2 to the earthing test point all as specified and indicated with & including excavation & earth work in any type of soil and removal of excavated soil upto 50 m, PCC pit, PCC cover with lifting hook, funnel with watering pipe, earth lead protection GI pipe of 15 mm dia, wire mesh, charcoal & salt etc. including testing on completion complete all as specified and as directed by Project Manager.
Material and labour for earth continuity conductor or main earthing lead of 4 mm dia galvanised iron or steel wire, fixed to wall on batten or recess or chases or buried in ground or drawn in conduit /pipe or fixed to poles or any other indicated situation for loop earthing etc. as required complete all as specified and as directed by Project Manager.
Material and labour PCC 1:2:4 type B-1, using 20 mm graded stone aggregate as in foundations, filling and mass concrete including necessary use and waste of form work complete all as specified and as directed by Project Manager.
Supply and fixing 40mm dia G.I. pipe medium grade sleeve, partly in ground and partly along the existing pole, beding etc. as required, complete all as specified and as directed by Project Manager.
Supply and fixing 50 mm dia G.I Pipe medium grade, galvanised with and including all fittings such as bends, elbows, tees, short pieces, connectors, bolts, nuts, diminishing pieces, caps, plugs, unions etc. and fixed complete laid in trenches complete all as specified and as directed by Project Manager.
SCH "A " SECTION - VIII SOLAR WATER HEATERS Total of Sch " A " Section-VIII B/F from Serial Page No. 83
SCH "A " SECTION - IX RAIN WATER HARVESTING Total of Sch " A " Section -IX B/F from Serial Page No. 88
SCH "A " SECTION - X EXCAVATION,EARTHWORK& SITE CLEARANCE Total of Sch " A " Section-X B/F from Serial Page No. 94
SCH "A " SECTION - XII DEFICIENT ITEMS Total of Sch " A " Section -XII B/F from Serial Page No 109
NAFREF ENGINEERS PVT LTD
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .