Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.9 LAccepted-AOC | L1 | Accepted-AOC L1 Tenderer | |
| 2 | L2₹75.0 L+₹2.1 L (2.83%)Rejected-Finance | L2 | Rejected-Finance L2 Tenderer |
Tender Value
₹73.7 L
EMD Value
₹74,000
Closing Date
3 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director DRDA Kancheepuram
O/o The Project Director DRDA Kancheepuram
Periodic Renewal of Two Roads Valathottam colony road km0/0 - 1/20 and Punjarasanthangal - Kolivakkam road km0/0 - 1/870 in Kanchipuram Block of Kanchipuram District having PKG No.TNKPM 05/2022-23
2023_RDTN_303720_1
DIPR/2142/Tender/2023 dt.14.04.2023
Open Tender
Civil Works - Roads
Lump-sum
90 days
Kancheepuram District
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹74,000
O/o The Project Director DRDA Kancheepuram
12 Jul 2023
18 Apr 2023
3 May 2023
18 Apr 2023
3 May 2023
18 Apr 2023
25 Apr 2023
Amount
Part I - Renewal B.T to Valathottam Colony Road Km 0/0-1/510 (R-180) in Valathottam Panchayat cost of Construction cost Rs.29.91 Lakh & Maintenance Cost Rs.5.44 lakh
Clearing the Scrub jungle including all labour charges for burying and burning etc., Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs, saplings and trees of girths up to 300mm, removal of stumps of such trees cut Earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, up to a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Applying Tack coat over BT surface at 3.00 Kg RS1/ 10 sq.m Bitumen Emulsion /10 Sqmm including labour for spraying hire charges for bitumen sprayer etc completed
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 kg of Bitumen for 1 cum of metal mixed in hot mix plant laying at site etc completed
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 13.20mm using IRC size HBG metal with 44 kg of Bitumen for 1 cum of metal mixed in hot mix plant laying at site etc completed
Applying Tack coat over Primed WBM surface at 3.00 Kg RS1/ 10 sq.m including cost of Bitumenous binder at the site including all labour charges etc complete
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compacti
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous surface
Provision for KM Stone etc complete
Provision for HM Stone etc complete
Sign board
Stop warning sign board
Provision for Cost of reflectors
Provision for Name board
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Part II - Renewal B.T to Punjarasanthangal to Kolivakkam Road Km 0/0-1/87 (R-69) in Punjarasanthangal Panchayat cost of Construction cost Rs.31.62 Lakh & Maintenance Cost Rs.6.73 lakh
Clearing the Scrub jungle including all labour charges for burying and burning etc., Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs, saplings and trees of girths up to 300mm, removal of stumps of such trees cut Earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, up to a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Applying Tack coat over BT surface at 3.00 Kg RS1/ 10 sq.m Bitumen Emulsion /10 Sqmm including labour for spraying hire charges for bitumen sprayer etc completed
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 kg of Bitumen for 1 cum of metal mixed in hot mix plant laying at site etc completed
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of 25mm using 13.20mm IRC size HBG metal with 44 kg of Bitumen for 1 cum of metal mixed in hot mix plant laying at site etc completed
Applying Tack coat over Primed WBM surface at 3.00 Kg / 10 sq.m including cost of Bitumenous binder at the site including all labour charges etc complete
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compacti
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous surface
Provision for KM Stone etc complete
Provision for HM Stone etc complete
Sign board
Stop warning sign board
Provision for Cost of reflectors
Provision for Name board
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
NPGBROTHERS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .