Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98.0 LAccepted-AOC 15 MOULYA NMH LAYOUT 1ST STAGE CHIKKA BANAVARA POST BENGALURU 560 090 | BENGALURU URBAN | KARNATAKA | 560090 | L1 | Accepted-AOC LOWEST QUOTED HENCE ADMITTED | |
| 2 | L2₹1.0 Cr+₹6.6 L (6.70%)Rejected-AOC | L2 | Rejected-AOC NOT LOWEST QUOTED HENCE NOT ADMITTED | |
| 3 | L3₹1.1 Cr+₹10.1 L (10.3%)Rejected-AOC | L3 | Rejected-AOC NOT LOWEST QUOTED HENCE NOT ADMITTED | |
| 4 | Rejected-Technical | - | Rejected-Technical Not Admitted, As the firm is two class below the required class. | |
| 5 | Rejected-Technical | - | Rejected-Technical Not Admitted, As the document asked in short fall was not received. |
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
25 Oct 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
COL MANOJ NEGI
CWE AF North Bangalore Bellary Road JC Nagar Post Bangalore 560006
CHANGE OF COLOUR SCHEME OF VV CAMP AND ASTE COMPLEX AT AF STATION MARATHAHALLI, BANGALORE
2023_MES_617634_1
87528CWEAFNMAR
Open Tender
Civil Works
Item Rate
330 days
GE (AF) MARATHAHALLI
AS PER NIT
8 documents required · 8 mandatory
₹1,000
Yes
GE (AF) MARATHAHALLI
₹1.9 L
Yes
19 Dec 2023
7 Sept 2023
1 Nov 2023
7 Sept 2023
25 Oct 2023
30 Sept 2023
8 Sept 2023 - 18 Sept 2023
Amount
Material & Labour for applying Two Coats of 100% Premium acrylic emulsion paint on old surfaces of external walls/soffits, having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm surfaces incl comlete removal of existing treatment, cleaning, preparation & filling crack filler on cracks or wherever required (crack filler cost is included), making smooth/good on old external wall surfaces. Make: Asian Apex / Berger All-Guard / Equivalent Height of building from ground upto 3rd storey. Details of Building :- (a) Vishwa Vihar Camp - P-16, P-41, P-07, P-25, P-11, P-08, P-10, P-06, P-33, P-34 & P-35 (b) Akash Vihar Camp - P-37 (c) ASTE - P-2 Note :- i) Necessary Safety Precautions / Scafolding for workers are deemed included in the item and shall be provided by contractor. ii) The item shall be executed through OEM/ Authorized applicator using smart periodical services (using fully automatic airless spray machine).
Material & Labour for applying Two Coats of 100% Premium acrylic emulsion paint on old surfaces of external walls/soffits, having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm surfaces incl complete removal of existing treatment, cleaning, preparation & filling crack filler on cracks or wherever required (crack filler cost is deemed included in item), making smooth/good on old external wall surfaces. Make : Asian Apex / Berger All-Guard / Equivalent Height of building from 4th storey to 7th storey Details of Building :- (a) Vishwa Vihar Camp - P-41, P-07, P-25 & P-06 Note :- i) Necessary Safety Precautions / Scafolding for workers are deemed included in the item and shall be provided by contractor. ii) The item shall be executed through OEM/ Authorized applicator using smart periodical services (using fully automatic airless spray machine).
Material & Labour for applying Two Coats of 100% Premium acrylic emulsion paint on old surfaces of external walls/soffits, having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm surfaces incl complete removal of existing treatment, cleaning, preparation & filling crack filler on cracks or wherever required (crack filler cost is deemed included in the item), making smooth/good on old external wall surfaces. Make : Asian Apex / Berger All-Guard / Equivalent Height of building from 8th storey to 11th storey Details of Building :- (a) Vishwa Vihar Camp - P-41 Note :- i) Necessary Safety Precautions / Scafolding for workers are deemed included in the item and shall be provided by contractor. ii) The item shall be executed through OEM/ Authorized applicator using smart periodical services (using with fully automatic airless spray machine).
Materal & labour for preparation of old plastered wall surfaces and providing two coats of Cement based paint of approved tint over alkali resistant primer complete all as specified and directed. Height of building from Ground to 3rd storey Details of Building :- (a) Akash Vihar Camp - P-3 to P-15, P-38, P-41 to P-46, P-68 to P-69, P-87 to P-91. (b) Vishwa Vihar Camp - P-9, P-18, P-19 (c) ASTE - P-9, P-14, P-27, P-38, P-39
Materal & labour for preparation of old plastered wall surfaces and providing two coats of Cement based paint of approved tint over alkali resistant primer complete all as specified and directed. Height of building from 4th storey to 7th storey Details of Building :- (a) Akash Vihar Camp - P-87 to P-91
M & L for one coat of synthetic enamel paint on old painted steel surfaces (of windows placed externally in buildings of height from ground to 3rd storey) over 10 cm width or girth including preparation of surfaces complete all as specified and directed. i) Necessary Safety Precautions / Scafolding for workers are deemed included in the item and shall be provided by contractor. Details of building :- (a) Vishwa Vihar Camp - P-16, P-41, P-07, P-25, P-11, P-8, P-10, P-06, P-33, P-34, P-35, P-9, P-18 & P-19. (b) Akash Vihar Camp - P-37, P-3 to P-15, P-38, P-41 to P-46, P-68 to P-69 & P-87 to P-91. (c) ASTE - P-2, P-9, P-14, P-27, P-38 P-39
M & L for one coat of synthetic enamel paint on old painted steel surfaces (of windows placed externally in buildgs of height from 4th storey to 7th storey) over 10 cm width or girth including preparation of surfaces complete all as specified and directed. i) Necessary Safety Precautions / Scafolding for workers are deemed included in the item and shall be provided by contractor. Details of building :- (a) Vishwa Vihar Camp - P-41, P-07, P-25, P-06
M & L for one coat of synthetic enamel paint on old painted steel surfaces (of windows placed externally in buildings of height from 8th storey to 11th storey) over 10 cm width or girth including preparation of surfaces complete all as specified and directed. i) Necessary Safety Precautions / Scafolding for workers are deemed included in the item and shall be provided by contractor. Details of building :- (a) Vishwa Vihar Camp - P-41
Cutting/Uprooting plantation found on external walls/soffits of buildings of height from ground to 3rd storey incl removing roots, chemically treating to avoid further growth of plantation repairing the area n.exc 1sqm by plastering in CM 1:4, etc, complete all as specified and directed. i) Necessary Safety Precautions / Scafolding for workers are deemed included in the item and shall be provided by contractor.
Cutting/Uprooting plantation found on external walls/soffits of buildings of height from 4th to 8th storey incl removing roots, chemically treating to avoid further growth of plantation repairing the area n.exc 1sqm by plastering in CM 1:4, etc, complete all as specified and directed. i) Necessary Safety Precautions / Scafolding for workers are deemed included in the item and shall be provided by contractor.
Taking down cement plaster any description on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc. Note: i) Height of building from ground to 3rd storey. ii) Necessary Safety Precautions / Scafolding for workers are deemed included in the item and shall be provided by contractor.
Taking down cement plaster any description on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc. Note: i) Height of building from 4th storey to 7th storey. ii) Necessary Safety Precautions / Scafolding for workers are to be taken by the Contractor.
M&L Rendering 15mm thick in cement mortar in 1:4 on fair faces of brick work or concrete surfaces even and smoothe without using extra cement but using integral water proofing compound. Note: i) WPC will be measured & paid separately. ii) Height of building from ground to 3rd storey iii) Necessary Safety Precautions / Scafolding for workers are deemed included in the item and shall be provided by contractor.
M&L Rendering 15mm thick in cement mortar in 1:4 on fair face of brick work or concrete surfaces even and smoothe without using extra cement & with using integral water proofing compound. Note: i) WPC will be measured & paid sepreately. ii) Height of building from 4th to 7th storey iii) Necessary Safety Precautions / Scafolding for workers are deemed included in the item and shall be provided by contractor.
Supply only Liquid water proofing compound
Hacking out old broken glass ( any thickness, size, quality or description) from metal frame including punching or drilling out old glazing pins/spring clips and providing and fixing new ones including supply and fix 4mm thick sheet glass ordinary quality in square or n. exc 0.5 sqm each pane height of building from ground to 3rd storey complete all as specified and directed by Engr-in-charge. Note: i) Necessary Safety Precautions/ Scafolding for workers are deemed included in the item and shall be provided by contractor.
Hacking out old broken glass ( any thickness, size, quality or description) from metal frame frame including punching or drilling out old glazing pins/spring clips and providing and fixing new ones including supply and fix for 4mm thick sheet glass ordinary quality in square or n. exc 0.5 sqm each pane height of building from 4th to 7th storey complete all as specified and directed by Engr-in-charge. Note: i) Necessary Safety Precautions/ Scafolding for workers are deemed included in the item and shall be provided by contractor.
Demolition of PCC around floor trap and dismantling / taking out existing floor trap and cleaning the blockage of pipe from floor trap to gully trap and supply and fix PVC floor/Nahani trap in existing pipe and embedding the floor trap / nahani trap in PCC 1:2:4, type B0 (mixed with WPC), finishiing the floor suitably, fixing with matching tile at the damaged portion of flooring & jointing, etc., including lowering or raising with vertical piece with PVC pipe for jointing trap and fixing gratings at true level of floor complete all as directed. Note: i) Height of building from ground to 3rd storey. ii) Necessary Safety Precautions / Scafolding for workers are deemed included in the item and shall be provided by contractor. iii) Supply of WPC & replacing damaged tile with new matching tile is included in Cost.
Demolition of PCC around floor trap and dismantling / taking out existing floor trap and cleaning the blockage of pipe from floor trap to gully trap and supply and fix PVC floor/Nahani trap in existing pipe and embedding the floor trap / nahani trap in PCC 1:2:4, type B0 (mixed with WPC), finishing the floor suitably, fixing with matching tile at the damaged portion of flooring & jointing, etc., including lowering or raising with vertical piece with PVC pipe for jointing trap and fixing gratings at true level of floor complete all as specified and directed. Note: i) Height of building from 4th to 7th storey ii) Necessary Safety Precautions / Scafolding for workers are to be taken by the Contractor. iii) Supply of WPC & replacing damaged tile with new matching tile is included in Cost.
Taking down rainwater pipes (any size or pattern) including all fittings, heads, shoes, bends etc complete. Height of building from ground to 3rd floor Note : i) Necessary Safety Precautions / Scafolding for workers are deemed included in the item and shall be provided by contractor.
Taking down rainwater pipes (any size or pattern) including all fittings, heads, shoes, bends etc complete. Height of building from 4th to 7th storey Note :- i) Necessary Safety Precautions/ Scafolding for workers are deemed included in the item and shall be provided by contractor.
Supply and fix PVC (SWR) pipes single socketed 110mm bore fixed in walls/Sunken floor. Height of building from ground to 3rd storey Note: i) Necessary Safety Precautions/ Scafolding for workers are deemed included in the item and shall be provided by contractor.
Supply and fix PVC (SWR) pipes single socketed 110mm bore fixed in walls/Sunken floor. Height of building from 4th to 7th storey Note :- i) Necessary Safety Precautions/ Scafolding for workers are deemed included in the item and shall be provided by contractor.
Supply and fix PVC (SWR) bend 110mm bore of any radius. Height of building from ground to 3rd storey
Supply and fix PVC (SWR) bends 110mm bore of any radius. Height of building from 4th to 7th storey
Supply and fix PVC (SWR) door Tee of size 110mm. Height of building from ground to 3rd storey
Supply and fix PVC (SWR) door Tee of size 110mm. Height of building from 4th to 7th storey
shyam engineerings
M.S.Trading Company
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .