Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
30 Jul 2024, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sant Kabir Nagar
Superintending Engineer Electricity Distribution Circle, Sant Kabir Nagar
Work of laying of power lines for 33 non-electrified schools of Basic Education Department Sant Kabir Nagar under the deposit scheme under Executive Engineer, Electricity Distribution Division, Khalilabad.
2024_PVVNV_927944_2
02/EDC(SKN)/2024-25
Open Tender
Electrical Works
Fixed-rate
90 days
Sant Kabir Nagar
As Per Tender Specification
2 documents required · 2 mandatory
₹1,180
SE EDC SKN
₹5,000
1 Aug 2024
23 Jul 2024
31 Jul 2024
23 Jul 2024
30 Jul 2024
23 Jul 2024
ढुलाई विवरण (Including GST)
Carriage of PCC Poles from Store to Site (0-90KM)
Carriage of T/F from Store to Site (0-90KM)
Carriage of Line Material and Acessaries Items from Store to Site (0-90KM)
विद्युत तंत्र स्थापना/डिसमेंटल का कार्य (Including GST)
Erection of single support ST/PCC pole for construction of 11 KV/LT line including digging of pit, fitting of all accessories, back filling of earth & others required work.
Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering
Installation of Distribution Transformer at Double Pole/Single Pole
Hanging of ABC Cable with Dead End and Suspension Clamp with DB Box
कार्य हेतु आवश्यक विकेंद्रीयकृत सामग्री (Including GST)
Cross Arm Holding Clamps
F-Brackets
Clamp for Chanell
Dead End Clamp
Suspension clamps with Eye Hook
ABHINANDA POWER DISTRIBUTION PRIVATE LIMITED
M/S MISHRA CONSTRUCTION CO
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .