Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.7 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹46.9 L+₹24,786.15 (0.53%)Rejected-Finance 3 1298 AYYAMPATTI VILLAGE NORTH SALAIGRAMAM ILAYANGUDI 623710 | 623710 | L2 | Rejected-Finance Above Estimate Rate |
Tender Value
₹41.5 L
EMD Value
₹42,000
Closing Date
3 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
Project Director, DRDA SIVAGANGAI
Renewal of Kilathari - Valayampatti
2023_RDTN_301731_1
MGSMT_TPVM_SVG DT_Pack_75
Open Tender
Civil Works - Roads
Item Rate
180 days
SIVAGANGAI
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹42,000
DRDA SIVAGANGAI
13 Jul 2023
15 Apr 2023
3 May 2023
15 Apr 2023
3 May 2023
15 Apr 2023
17 Apr 2023
Amount
Renewal of Kilathari to Valayapatti Road
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Earth work excavation and depositing on bank with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete.
Providing and Laying Gravel Soling to Compacted thick including cost and conveyance of gravel from approved sources to work site including labour for Spreading ,water and Compacting by power roller to achieve the required
Picking the Existing BT Surface Picking including cost and Conveyance of all labour charges etc complete..,
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of 25mm using 13.20mm IRC size HBG metal
Applying Tack Coat over BT surface (not treaded with primer ) using 3kg of bituminous emulsion per 10sqm including cost of bituminus emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminus emulsion to actual work
Bell mouth (7.50+3.75)/2
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.2mm IRC size HBG machine crushed chips and 0.09cum of 11.20mm IRC HBG machine crushed bchips with 13.432Kg of bitrumen and 1.168Kg of Plastic waste for 10sqm of premix carpet including laying of seal coat A over the premix carpet using 0.09cum of 6.70mm IRC size HBG machine crushed chips and stacking them to dapartmental gauge for pre-measurements including cost and of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the material in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges applications of bitumen for seal coat over the premix carpet and spreading the seal coat
bell mouth(7.50+3.75)/2
Provision for KM metre stone
Provision for Hectametre stone
Provision for sign board
Provision For Road marking
Maintenance of the road
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
V BALAN
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .