| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 CrAccepted-AOC | ₹1.3 Cr | 1 | Accepted-AOC lesser the estimate rate |
| 2 | 2₹1.3 Cr+₹6.4 L (5.07%)Rejected-Finance MOULIVAKKAM 116 | NAGAPATTINAM | TAMIL NADU | 608002 | ₹1.3 Cr+₹6.4 L (5.07%) | 2 | Rejected-Finance higher the estimate rate |
| Sl No | Description | Qty | Unit | GOOD CARE ENVIRO SYSTEM PVT LTD L2 | T MARIYAPPAN L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation in all soils and subsoils except hard rock requiring blasting with initial lead and lift as initial lead of 10.0 m and lift 0f 2.00 m including re-filling the sides of foundation in layer of 15cm. thick watering ramming depositing the surplus earth in the premises as directed by the departmental officers etc., complete complying with standard specification. | 1,427 | M3 | 173 ₹2,46,871 | 165 ₹2,35,455 Lowest |
| 2.00 | Cement Concrete M7.5 (1:4:8) (Design mix) using 40 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications | 194 | M3 | 5,370 ₹10,41,796.11 | 5,114.4 ₹9,92,208.94 Lowest |
| 3.00Vibrated Cement Concrete of grade M15 (Nominal mix) using 20mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Hire charges for Tools and plants and incidental charges etc., complete as per relevent standard specification for Drain Side wall | |||||
| 4.00 | Side wall | 457 | M3 | 11,982 ₹54,75,774 | 11,412 ₹52,15,284 Lowest |
| 5.00 | Supplying and fabricating and placing in position of M.S (or) ribbed Tar steel for all reinforced cement concrete works including cost of steel and binding wire and all labour charges for cutting and fabricaton and other incidental charges etc., complete complying with standard specification. | 20,091.63 | KG | 98 ₹19,68,979.74 | 92.9 ₹18,66,512.43 Lowest |
| 6.00 | Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for Culvert DECK SLAB | 309.1 | M3 | 10,561 ₹32,64,426.22 | 10,057.9 ₹31,08,917.01 Lowest |
| 7.00 | Supply and fixing of SFRC Manhole cover (0.60m x 0.60m) including cost of man hole cover conveyance to the site and labour charges for fixing etc. complete complying with standard specification | 381 | NO'S | 2,836 ₹10,80,516 | 2,701 ₹10,29,081 Lowest |
| 8.00 | Removal of Excavated Excess Earth away from the site to 3 KM including loading and transportation charges etc, complete as per standard specification. For 1m3 | 1,142 | M3 | 84 ₹95,928 | 80 ₹91,360 Lowest |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
2 Mar 2026, 3:00 pmClosed
commissioner
13,sendurai main rd,elil nagar,dindigul
Library Cess Fund-Construction Of Storm Water Drain In Samayapuram Mariamman Kovil 2nd Street,Anjugam 1st Street,East Govindapuram,Society Street,Kalimuthupillai Street,Kalimuthu Pillai
2026_MAWS_663113_4
2855/2023/E4
Open Tender
Civil Works
Works
13, sendurai main rd, elil nagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.5 L
13,sendurai main rd,elil nagar,dindigul
20 May 2026
21 Feb 2026
2 Mar 2026
21 Feb 2026
2 Mar 2026
21 Feb 2026
25 Feb 2026
Earthwork excavation in all soils and subsoils except hard rock requiring blasting with initial lead and lift as initial lead of 10.0 m and lift 0f 2.00 m including re-filling the sides of foundation in layer of 15cm. thick watering ramming depositing the surplus earth in the premises as directed by the departmental officers etc., complete complying with standard specification.
Cement Concrete M7.5 (1:4:8) (Design mix) using 40 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications
Vibrated Cement Concrete of grade M15 (Nominal mix) using 20mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Hire charges for Tools and plants and incidental charges etc., complete as per relevent standard specification for Drain Side wall
Side wall
Supplying and fabricating and placing in position of M.S (or) ribbed Tar steel for all reinforced cement concrete works including cost of steel and binding wire and all labour charges for cutting and fabricaton and other incidental charges etc., complete complying with standard specification.
Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for Culvert DECK SLAB
Supply and fixing of SFRC Manhole cover (0.60m x 0.60m) including cost of man hole cover conveyance to the site and labour charges for fixing etc. complete complying with standard specification
Removal of Excavated Excess Earth away from the site to 3 KM including loading and transportation charges etc, complete as per standard specification. For 1m3
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.72 MB
techfour.pdf
Tender Documents • 1.19 MB
BOQ_796106.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .