| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 CrAdmitted-Finance | ₹5.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.1 Cr+₹5.3 L (1.06%)Admitted-Finance | ₹5.1 Cr+₹5.3 L (1.06%) | L2 | Admitted-Finance |
| 3 | L3₹5.8 Cr+₹84.5 L (16.9%)Admitted-Finance | ₹5.8 Cr+₹84.5 L (16.9%) | L3 | Admitted-Finance |
| 4 | L4₹6.3 Cr+₹1.3 Cr (26.2%)Admitted-Finance | ₹6.3 Cr+₹1.3 Cr (26.2%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | INDIA SUPPY CORPORATION L1 | M/S SHUKLA ENTERPRISES L3 | ARK ENGINEERING L4 | AMIT ENGINEERING CORPORATION L2 |
|---|---|---|---|---|---|---|---|
| 1.00Part A (Materials Provided by contractor) | |||||||
| 1.01 | ST Pole 9 m long | 69 | No | 13,500 ₹9,31,500 Lowest | 14,500 ₹10,00,500 | 15,500 ₹10,69,500 | 14,100 ₹9,72,900 |
| 1.02 | ST Pole 11 m long | 55 | No | 18,500 ₹10,17,500 Lowest | 19,500 ₹10,72,500 | 20,500 ₹11,27,500 | 19,350 ₹10,64,250 |
| 1.03 | ACSR weasel Conductor | 210 | Mtr | 30 ₹6,300 Lowest | 34 ₹7,140 | 37 ₹7,770 | 32 ₹6,720 |
| 1.04 | ACSR Dog Conductor | 500 | Mtr | 85 ₹42,500 Lowest | 95 ₹47,500 | 98 ₹49,000 | 92 ₹46,000 |
| 1.05 | 3x400 mm² ‘XLPE’ cable 33 KV | 3,250 | Mtr | 2,900 ₹94,25,000 Lowest | 3,200 ₹1,04,00,000 | 3,500 ₹1,13,75,000 | 2,950 ₹95,87,500 |
| 1.06 | 3x300 mm² ‘XLPE’ cable 33 KV | 7,106 | Mtr | 2,300 ₹1,63,43,800 Lowest | 2,600 ₹1,84,75,600 | 2,800 ₹1,98,96,800 | 2,350 ₹1,66,99,100 |
| 1.07 | 3x185 mm² ‘XLPE’ cable 11 KV | 2,796 | Mtr | 1,200 ₹33,55,200 | 1,450 ₹40,54,200 | 1,500 ₹41,94,000 | 1,100 ₹30,75,600 Lowest |
| 1.08 | 1x16 mm² LT cable | 5 | Mtr | 125 ₹625 | 150 ₹750 | 200 ₹1,000 | 75 ₹375 Lowest |
| 1.09 | 2x10 mm² LT cable | 460 | Mtr | 150 ₹69,000 | 200 ₹92,000 | 230 ₹1,05,800 | 87 ₹40,020 Lowest |
Tender Value
Refer Docs
EMD Value
₹6.2 L
Closing Date
26 Mar 2024, 4:00 pmClosed
SE EWC Gorakhpur
Srirampuram Colony Mohaddipur, Gorakhpur
Shifting of 33 KV, 11 KV, LT Line and Transfromer Ravat Bhiti Gorakhpur
2024_PVVNV_919347_1
47/EWC(G)/2023-24
Open Tender
Electrical Works
Turn-key
30 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
SE EWC Gorakhpur
₹6.2 L
Yes
1 Apr 2024
19 Mar 2024
27 Mar 2024
19 Mar 2024
26 Mar 2024
19 Mar 2024
Amount
Part A (Materials Provided by contractor)
ST Pole 9 m long
ST Pole 11 m long
ACSR weasel Conductor
ACSR Dog Conductor
3x400 mm² ‘XLPE’ cable 33 KV
3x300 mm² ‘XLPE’ cable 33 KV
3x185 mm² ‘XLPE’ cable 11 KV
1x16 mm² LT cable
2x10 mm² LT cable
4x16 mm² LT cable
3x95+1x70+1x16 mm² LT AB Cable
4x25 mm² LT cable
1x400 mm² LT Cable
3.5x150 mm² LT Cable
33 KV ‘XLPE’ C/J Kit 3x400 mm² Outdoor
33 KV ‘XLPE’ C/J Kit 3x400 mm² St. through
33 KV ‘XLPE’ C/J Kit 3x300 mm² Outdoor
33 KV ‘XLPE’ C/J Kit 3x300 mm² St. through
11 KV ‘XLPE’ C/J Kit 3x185mm² Outdoor
11 KV ‘XLPE’ C/J Kit 3x185mm² St. Through
33 KV feeder Pillar box
Number Plate with Clamp
Danger Board with Clamp
Barbed wire
Bolts, Nuts, & Washers
LT Schakle Insulator
MS Earthing Rod 20x2500 mm
GI wire 5 mm
LT AB Cable clamp with nut & bolt
I Hook
I clamp
Suspension clamp
Neutral PRC
Al. Paint
Red oxide Paint
11 KV Top channel 100x50x2240 mm
11 KV Cross Bracing Angle
11 KV Top channel/Bracing angle clamp with nut bolt for ST Pole with nut bolt by 50x8 mm MS flat Iron make
Extra angle for cable support
Clamp for extra angle support
11 KV Polymer Disc Insulator
11 KV Polymer Disc fitting
PG clamp for weasel
11 KV Stay Rod 16x1800 mm
11 KV Stay clamp for ST Pole with Nut and Bolt by 50x8 mm MS Flat Iron make.
Stay wire 7/10 SWG
Different size al. lug as per requirement
New 100 KVA T/F
MS channel T-off 125x65x1300 mm
Clamp for T off
11 KV TPMO
LT incoming pannel with metering equipment
Copper L piece 50x225x10 mm (LS)
MS channel Dropper for fuse set 100x50x2028 mm
T/F Base angle 75x75x6x2028 mm
Copper Z clamp
FRP fencing for T/F safety
Distribution Box (with pearsing connector, A clamp and other require materials)
Holding clamp for TPMO & fuse set and other.
4 core MCB with Box (LS)
Clamp for Distribution box
Clamp for T/F
Eye bolt for service cale
33 KV Top channel 125X65X3200 mm with clamp
33 KV M.S. Angle Iron 65x65x6mm bracing with clamps
33 KV Polymer Disc Insulator B&S type
33 KV Polymer Disc Fitting
PG clamp for Dog conductor
33 KV Stay Rod (20x1800MM)
33 KV Stay clamp
Stay wire 7/8 SWG
PART - B- WORK
Erection of Single pole structure on 9 mtr ST Pole for LT AB Cable including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (LT clamps with bolt and nut danger board with clamp, Aluminium paint, red oxide paint, barbed wire earthing, etc. complete).
Erection of Double pole structure on 9 mtr ST Pole for 11 KV cable rising including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories for (M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel 100 x 50 x 2240 mm with clamps, danger board with clamp, Aluminium paint, red oxide paint, barbed wire earthing, etc. complete) .
Erection of Double pole structure on 11 mtr ST Pole for 11 KV one side overhead and one side cable rising including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories for (M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel 100 x 50 x 2240 mm with clamps, danger board with clamp, Aluminium paint, red oxide paint, barbed wire earthing, etc. complete).
Erection of Double pole structure on 11 mtr ST Pole for 33 KV one side O/H and one side cable rising including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories for (M.S. angle iron bracing with clamps, top channel 125 x 65 x 3200 mm with clamps, danger board with clamp, Aluminium paint, red oxide paint, barbed wire earthing, etc. complete) .
Erection of Double pole structure on 9 mtr ST Pole for 33 KV only cable rising including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories for (M.S. angle iron bracing with clamps, top channel 125 x 65 x 3200 mm with clamps, danger board with clamp, Aluminium paint, red oxide paint, barbed wire earthing, etc. complete) .
Erection of Four pole structure on 11 mtr ST Pole for 33 KV one side O/H and one side cable rising including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories for (M.S. angle iron bracing with clamps, top channel 125 x 65 x 3200 mm with clamps, danger board with clamp, Aluminium paint, red oxide paint, barbed wire earthing, etc. complete) .
Installation of distribution Box
Labour charges for Hanging of LT AB Cable on new erected pole with LT AB Cable clamp complete.
Making plinth, Installation of feeder pillar box, connection, earthing and complete work.
Dismantling, shifting and Relaying (Hanging) of Existing LT AB Cable on new erected Pole as much as possible.
Charges for making section and jumpering with related Weasel/Dog conductor as per site requirement.
Laying of 33 KV 3x400 mm² ‘XLPE’ cable(D/C) by digging pit & making trench in Proper size (1M depth x1M wide) below ground level by fixing bricks(4½˝) on both side of trench wall and 9˝ brick work at the centre of the trench along the cable. Fixing brick slab on top after filling sand around both the cable including cost of bricks and sand/HDD Method as per site required.
Extra cost for drilling horizontal hole 2 Mtr below the road & inserting 6” dia. HDPE Pipe PN-8 as per RESSPO for passing of 33 KV XLPE cable 3x400 mm² for Road /Pulliya Crossing at different places in the path of Laying of cable. (Complete work with Materials provided by contractor)
Laying of 33 KV 3x300 mm² ‘XLPE’ cable(D/C) by digging pit & making trench in Proper size (1M depth x1M wide) below ground level by fixing bricks(4½˝) on both side of trench wall and 9˝ brick work at the centre of the trench along the cable. Fixing brick slab on top after filling sand around both the cable including cost of bricks and sand/HDD Method as per site required.
Extra cost for drilling horizontal hole 2 Mtr below the road & inserting 6” dia. HDPE Pipe PN-6 as per RESSPO for passing of 33 KV XLPE cable 3x300 mm² for Road /Pulliya Crossing at different places in the path of Laying of cable. (Complete work with Materials provided by contractor)
Laying of 11 KV (D/C) & LT cable by digging pit & making trench in Proper size (1M depth x1M wide) below ground level by fixing bricks(4½˝) on both side of trench wall and 9˝ brick work at the centre of the trench along the cable. Fixing brick slab on top after filling sand around both the cable including cost of bricks and sand/HDD Method as per site required.
Extra cost for drilling horizontal hole 2 Mtr below the road & inserting 6” dia. HDPE Pipe PN-6 as per RESSPO for passing of 11 KV XLPE cable 3x185 mm² for Four lane /Pulliya Crossing at different places in the path of Laying of cable. (Complete work with Materials provided by contractor)
Rising of 33&11 KV ‘XLPE’ cable in air after providing 6” dia. M.S pipe 3 m long Complete work.
Jointing charge of 33 KV ‘XLPE’ C/J Kit Outdoor & Straight Through.
jointing charges of 11 KV XLPE C/J Kit Outdoor/Straight through.
special Pipe Earthing Complete for Cable jointing Kit with materials provided by contractor.
Disconnection and Reconnection of Existing LT cable connection in the path of Shifting of line as per follwoing details.
L.T. and Domestic Consumer connection cable.
Commercial and Power Consumer Connection cable.
Shifting, loading, Carriage and re-installation of Existing 400/250 kVA T/F From Existing place to Shifted Place with installation related all materials i.e. erection of pole and installation of fitting and equipment. as per site requirement and instruction of supervision authority. (including T/F plinth, installation of FRP fencing and earthing)
Providing and installation of New 100 KVA T/F 11/0.4 KV For Avoid Road crossing with installation related all materials i.e. erection of pole and installation of fitting and equipment. as per site requirement and instruction of supervision authority.
Shifting, loading, Carriage and re-installation of Existing 16/10 kVA T/F From Existing place to Shifted Place with installation related all materials i.e. erection of pole and installation of fitting and equipment. as per site requirement and instruction of supervision authority. (include earthing)
Grouting of stay rods (20 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension.
Grouting of stay rods (16 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension.
Dismentling charges of existing Single Pole 9 mtr. ST Pole.
Dismentling charges of existing Single Pole 11 mtr. ST Pole.
Dismentling charges of existing Double Pole 11mtr. ST Pole.
Dismentling charges of existing Single pole on PCC Pole 8.5 mtr.
Dismentling charges of existing Single Pole 11 mtr. Rail/Joist Pole.
Dismentling charges of existing Double Pole 11mtr. Rail/Joist Pole.
Dismentling charges of existing Four Pole 11mtr. ST Pole.
Dismentaling of old ACSR Dog conductor and rolling in pieces.
Dismentaling of old ACSR Weasel conductor and rolling in pieces.
Shifting, Loading, Carriage & Unloading of old and damaged 33/11 KV/LT Line materials from work site to Store centre Gorkahpur Distt. Gorakhpur.
Cost for NOC from NHAI, Forest department & etc.
AMIT ENGINEERING CORPORATION
M/S SHUKLA ENTERPRISES
ARK ENGINEERING
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .