Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Fee/PreQual/Technical/Finance | -41.10% | ₹1.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.6 L+₹41,594.38 (35.3%)Admitted-Fee/PreQual/Technical/Finance | -20.30% | ₹1.6 L+₹41,594.38 (35.3%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.7 L+₹50,213.22 (42.6%)Admitted-Fee/PreQual/Technical/Finance | -15.99% | ₹1.7 L+₹50,213.22 (42.6%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.0 L
EMD Value
₹5,970
Closing Date
28 Jul 2026, 3:00 pmClosed
Executive Eng REW Kupwara
Executive Eng REW Kupwara
Culvert NHO Mohd Ashraf Dar, Shabir Ah Dar and Others
2026_RDPR_316087_28
NIT NO 58 OF 2026-27 ADF KUPWARA
Open Tender
Civil Works
Percentage
Executive Eng REW Kupwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Eng REW Kupwara
₹5,970
2 Aug 2026
15 Jul 2026
29 Jul 2026
15 Jul 2026
28 Jul 2026
15 Jul 2026
15 Jul 2026 - 15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix | 1.19 | cum | 1,725.2 | ₹2,052.99 |
| 2 | Earthwork in excavation in foundation trenches or drains not exceeding 10sqm on plan upto 1.5m, including disposal of the excavated earth lead 50m and lift 1.5m incl any dewatering/diversions all complete. | 3.57 | cum | 479.3 | ₹1,711.1 |
| 3 | Providing and laying of dry stone soling hand packed tightly,including carriage by all means incl any dewatering all complete | 0.3 | cum | 900 | ₹270 |
| 4 | Providing and laying of Cement Concrete in different mixes excluding the cost of centering, shuttering.and carriage of material,using 20 mm crushed aggregates Mud mat M 10 (1:3:6) | 3.69 | cum | 5,733.6 | ₹21,156.98 |
| 5 | Providing and laying of Cement Concrete in different mixes excluding the cost of centering, shuttering.and carriage of material,using 20 mm crushed aggregates M 15 (1:2:4) | 5.9 | cum | 7,104.35 | ₹41,915.67 |
| 6 | Reinforced cement concrete work in beams, suspended floors,.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 3.28 | cum | 9,821.85 | ₹32,215.67 |
| 7 | Providing and fixing of formwork including the removal of the same. Abutments | 26.01 | sqm | 628.95 | ₹16,358.99 |
| 8 | Providing and fixing of formwork including the removal of the same. Slab | 13.38 | sqm | 718.2 | ₹9,609.52 |
| 9 | Providing and fixing of reinforcing steel including cutting, bending ,straightening & laying in position,Thermo-Mechanically Treated bars of grade Fe-500D or more. | 4.33 | qtls | 11,535 | ₹49,946.55 |
| 10 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. railings, brackets, gates and similar works. | 150 | kg | 133.3 | ₹19,995 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_1029213.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .