| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.5 LAdmitted-Finance | -5.99% | ₹4.5 L | L1 | Admitted-Finance |
| 2 | L2₹4.6 L+₹10,078.90 (2.26%)Admitted-Finance | +1.65% | ₹4.6 L+₹10,078.90 (2.26%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MAA CHAMUNDA CONSTRUCTION COMPANY L2 | MAKKHAN LAL L1 |
|---|---|---|---|---|---|
| .01PART- B (Item Rate Basis) | |||||
| 1.00 | E/W in filling of excavated earth except black cotton soil with watering & compaction of spreaded earth in 15-30cm layers levelled & neatly dressed as per requirement of site & direction of E/I, work includes cost of earth with taxes, loading, unloading, transportation, labour, water & T&P etc. complete with all lead & lift. | 365 | Cum. | 350 ₹1,27,750 | 345 ₹1,25,925 Lowest |
| 2.00 | Supply, stacking & spreading & hand ramming of quarry rubbish in layer not exceeding 15 cm including all lead and lift transportation, loading, unloading with watering and hand ranning with labour, T&P, machinary water etc. complete in all respect finishing in line, level & camber as per directon of Engineer incharge. | 77 | Cum. | 800 ₹61,600 | 725 ₹55,825 Lowest |
| 3.00 | Supply and spreading of graded crusher broken hard stone aggregate free from organic matter including stacking spreading in yard / trenches as per the standard specifications of size 40mm-63mm including all lead and lift transportation, labour, loading unloading T&P required for gravelling work as per direction of engineer in charges including dressing & leveling. | 41 | Cum. | 1,600 ₹65,600 Lowest | 1,680 ₹68,880 |
| 4.00 | Removing and refixing of boundary wall gate at same/different location of same boundary wall including cost of pins, welding , transportation,etc. complete for all lead and lift As per direction of Engineer in charge. | 1 | per job | 5,000 ₹5,000 | 4,250 ₹4,250 Lowest |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
6 Jul 2026, 3:00 pmClosed
SE (CIVIL) JPD, JAIPUR
OFFICE OF THE SE (CIVIL) JPD, JAIPUR OLD POWER HOUSE PREMISES, NEAR RAM MANDIR, BANIPARK, JAIPUR
Urgent Earth filling and Quarry rubbish and other miscellaneous civil works to avoid rain water ponding at various 33 KV S/S Under XEN (OandM) Rajgarh, Kathumar
2026_JVVNL_570217_13
NIT-03/2026-27/SE CIVIL JAIPUR
Open Tender
Civil Works
Percentage
60 days
ALWAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹236
AO (O AND M) JVVNL, ALWAR
₹10,000
Yes
ALWAR
10 Jul 2026
24 Jun 2026
8 Jul 2026
24 Jun 2026
6 Jul 2026
24 Jun 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.001 | PART-A | - | - | - | - |
| 1 | 1.8
E/W in excavation by mechanical means (hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5m in which or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering &ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils. | 9 | Cum | 178 | ₹1,602 |
| 2 | (B-54/3.1.6)
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) | 5 | P.cum | 3,302 | ₹16,510 |
| 3 | RR stone masonry for with hard stone in foundation and plinth in CSM above 30cm thick wall in CM 1:6 (1cement :6 Sand) (6.1.6) | 3 | Cum | 2,838 | ₹8,514 |
| 4 | (B-139/12.3.2)
Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish:
20mm thick. | 14 | Sqm. | 190 | ₹2,660 |
| 5 | (B-12.41.1)
Finishing wall with water proofing cement paint of approved brand and manufacture and or required shade to give an even shade including all scaffolding:
New work (Two or more coats applied @ 3.84 kg/10 sqm). | 14 | Sqm. | 53 | ₹742 |
| 6 | (B-4.9)
Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | 12 | Sqm. | 157 | ₹1,884 |
| 7 | (B-54/3.1.1)
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.
M20 grade Nominal Mix 1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). | 9 | Cum. | 4,915 | ₹44,235 |
| 8 | (B-1.1)
Earth work in surface excavation not exceeding 30cm. in depth but exceeding 1.5 meter in width as well as10 Sqm on plan including disposal of excavated earth up to 50 Mtr. and lift up to 1.5 Mtr. disposed soil to be levelled and neatly dressed : All kinds of soil | 500 | Sqm | 35 | ₹17,500 |
| 9 | (B-1.28)
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of rubbish lead up to 50 Mtr. and lift up to 1.5 Mtr. : All kinds of soil | 1,000 | Sqm | 9 | ₹9,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.05 MB
BOQ_1015629.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .