Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.5 Cr Augmentation and capacity building of Hostel Infrastructure at NPTI ER, Durgapur SH Demolishing of existing G plus 2 storied Type I Quarters Building and construction of G plus 3 storied New Hostel Building including internal water supply, sanitary installation, drainage, 1 lakh litres RCC underground sump, pathway, open drains, internal and external electrical installation, firefighting system, VRF air conditioning system, occupancy sensor, solar photovoltaic power generation system, CCTV, LAN, Lift and Access Control System | Augmentation and capacity building of Hostel Infrastructure at NPTI ER, Durgapur SH Demolishing of existing G plus 2 storied Type I Quarters Building and construction of G plus 3 storied New Hostel Building including internal water supply, sanitary installation, drainage, 1 lakh litres RCC underground sump, pathway, open drains, internal and external electrical installation, firefighting system, VRF air conditioning system, occupancy sensor, solar photovoltaic power generation system, CCTV, LAN, Lift and Access Control System | L1 | - | |
| 2 | L2₹6.6 Cr+₹9.0 L (1.39%) Augmentation and capacity building of Hostel Infrastructure at NPTI ER, Durgapur SH Demolishing of existing G plus 2 storied Type I Quarters Building and construction of G plus 3 storied New Hostel Building including internal water supply, sanitary installation, drainage, 1 lakh litres RCC underground sump, pathway, open drains, internal and external electrical installation, firefighting system, VRF air conditioning system, occupancy sensor, solar photovoltaic power generation system, CCTV, LAN, Lift and Access Control System | Augmentation and capacity building of Hostel Infrastructure at NPTI ER, Durgapur SH Demolishing of existing G plus 2 storied Type I Quarters Building and construction of G plus 3 storied New Hostel Building including internal water supply, sanitary installation, drainage, 1 lakh litres RCC underground sump, pathway, open drains, internal and external electrical installation, firefighting system, VRF air conditioning system, occupancy sensor, solar photovoltaic power generation system, CCTV, LAN, Lift and Access Control System | L2 | - | |
| 3 | L3₹6.6 Cr+₹10.3 L (1.59%) Augmentation and capacity building of Hostel Infrastructure at NPTI ER, Durgapur SH Demolishing of existing G plus 2 storied Type I Quarters Building and construction of G plus 3 storied New Hostel Building including internal water supply, sanitary installation, drainage, 1 lakh litres RCC underground sump, pathway, open drains, internal and external electrical installation, firefighting system, VRF air conditioning system, occupancy sensor, solar photovoltaic power generation system, CCTV, LAN, Lift and Access Control System | Augmentation and capacity building of Hostel Infrastructure at NPTI ER, Durgapur SH Demolishing of existing G plus 2 storied Type I Quarters Building and construction of G plus 3 storied New Hostel Building including internal water supply, sanitary installation, drainage, 1 lakh litres RCC underground sump, pathway, open drains, internal and external electrical installation, firefighting system, VRF air conditioning system, occupancy sensor, solar photovoltaic power generation system, CCTV, LAN, Lift and Access Control System | L3 | - | |
| 4 | L4₹6.9 Cr+₹48.0 L (7.43%) Augmentation and capacity building of Hostel Infrastructure at NPTI ER, Durgapur SH Demolishing of existing G plus 2 storied Type I Quarters Building and construction of G plus 3 storied New Hostel Building including internal water supply, sanitary installation, drainage, 1 lakh litres RCC underground sump, pathway, open drains, internal and external electrical installation, firefighting system, VRF air conditioning system, occupancy sensor, solar photovoltaic power generation system, CCTV, LAN, Lift and Access Control System | Augmentation and capacity building of Hostel Infrastructure at NPTI ER, Durgapur SH Demolishing of existing G plus 2 storied Type I Quarters Building and construction of G plus 3 storied New Hostel Building including internal water supply, sanitary installation, drainage, 1 lakh litres RCC underground sump, pathway, open drains, internal and external electrical installation, firefighting system, VRF air conditioning system, occupancy sensor, solar photovoltaic power generation system, CCTV, LAN, Lift and Access Control System | L4 | - | |
| 5 | L5₹7.2 Cr+₹73.2 L (11.3%)Financial bid opened Augmentation and capacity building of Hostel Infrastructure at NPTI ER, Durgapur SH Demolishing of existing G plus 2 storied Type I Quarters Building and construction of G plus 3 storied New Hostel Building including internal water supply, sanitary installation, drainage, 1 lakh litres RCC underground sump, pathway, open drains, internal and external electrical installation, firefighting system, VRF air conditioning system, occupancy sensor, solar photovoltaic power generation system, CCTV, LAN, Lift and Access Control System | Augmentation and capacity building of Hostel Infrastructure at NPTI ER, Durgapur SH Demolishing of existing G plus 2 storied Type I Quarters Building and construction of G plus 3 storied New Hostel Building including internal water supply, sanitary installation, drainage, 1 lakh litres RCC underground sump, pathway, open drains, internal and external electrical installation, firefighting system, VRF air conditioning system, occupancy sensor, solar photovoltaic power generation system, CCTV, LAN, Lift and Access Control System | L5 | Financial bid opened |
Tender Value
₹9.2 Cr
EMD Value
₹18.5 L
Closing Date
4 Apr 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE-NIT DURGAPUR
ISRAR AHMAD
NIT DURGAPUR CAMPUS
Augmentation and capacity building of Hostel Infrastructure at NPTI ER, Durgapur SH Demolishing of existing G plus 2 storied Type I Quarters Building and construction of G plus 3 storied New Hostel Building including internal water supply, sanitary installation, drainage, 1 lakh litres RCC underground sump, pathway, open drains, internal and external electrical installation, firefighting system, VRF air conditioning system, occupancy sensor, solar photovoltaic power generation system, CCTV, LAN, Lift and Access Control System
107150
37/04/SE/EE/NITDD/CPWD/2024-25
OPEN
Civil Works - Buildings
NCB
18 months
Shimla, Himachal Pradesh
9 documents required · 9 mandatory
₹18.5 L
Not Applicable
4 Apr 2025
20 Mar 2025
4 Apr 2025
4 Apr 2025
2 Apr 2025
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT3704.pdf
document • 3.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .