Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accept |
| 2 | Accepted-Technical | Accepted-Technical Accept |
| 3 | Accepted-Technical | Accepted-Technical Accept |
| 4 | Accepted-Technical | Accepted-Technical Accept |
| 5 | Accepted-Technical | Accepted-Technical Accept |
Tender Value
₹53.5 L
EMD Value
₹1.1 L
Closing Date
17 Mar 2026, 5:00 pmClosed
SE ROHILKHAND CIRCLE UPAVP MORADABAD
GROUND FLOOR, OFFICE COMPLEX, MAJHOLA YOJNA NO.-4, PHASE-2, SECTOR-5, MORADABAD
Construction of Park/Green Belt in Sector-14 at Majhola Yojna No.-4, Phase-2 (Vistar), Moradabad.
2026_UPHDB_1119537_1
278/M-15A/21 Dated 18.02.2026
Open Tender
Civil Works
Percentage
180 days
MAJHOLA YOJNA NO 4 PH.-2 VISTAR SEC.-14
As per Tender Documents
3 documents required · 3 mandatory
₹3,540
EE CD ROHILKHAND-03 UPAVP MORADABAD
₹1.1 L
Yes
7 Apr 2026
23 Feb 2026
18 Mar 2026
23 Feb 2026
17 Mar 2026
23 Feb 2026
PARK PANEL
Excavation in foundation by manual means in ordinary soil (Loam, clay or sand) including lift upto 1.50m and lead upto 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30m from the foundation trenches. SOR Rampur 2025 Item 251 Chapter 4 Page 11
Concrete with 40mm Gauge approved Stone ballast coarse sand of 2.20 - 3.60 F.M and cement in proportion of 8 : 4 : 1 in foundation and under floors including supply of all material, labour and T & P etc. Required for proper completion of the work. SOR Rampur 2025 Item 281 Chapter 5 Page 12
M-150 brick work in 1:6 ( One cement and six coarse sand of 1.50 - 2.00 F.M mortar) in foundation and plinth including supply of all materials, labour and T&P etc. required for the proper completion of the work. SOR Rampur 2025 Item 305 Chapter 6 Page 14
Cement concrete with 2cm guage approved stone ballast coarse sand and cement in proportion of 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of work. SOR Rampur 2025 Item 279A Chapter 5 Page 12
M-150 class brick work in 1:6 cement coarse sand of 1.50 - 2.00 F.M mortar in super structure in one brick thick wall (230 mm) including necessary cutting and moulding of brick as required including supply of all materials, labour and T&P etc. required for the proper completion of the work. SOR Rampur 2025 Chapter 6 Page 14 (Item 303+309+310)
Providing precast cement concrete jali 1:2:4 (1 cement :2 coarse sand (Zone-III) : 4 graded stone aggregate 6mm nominal size), reinforced with 1.6mm dia mild steel wire including centering and shuttering, roughening , cleaning, fixing and finishing in cement mortar 1:3 (1 cement : 3 coarse sand ) etc complete, excluding plastering of the jambs , sills and soffits 5.18.1 50mm thick DSR Item No. 5.18.1 Page 117
12 mm Thick plaster with one part of cement and four part of approved coarse sand (F.M. 1.5 - 2.00) including supply of all materials, labour and completion of work. SOR Rampur 2025 Chapter 13 Page 25 Item 584
Add for extra labour and materials for plaster over rough surface of one brick thick wall SOR Rampur 2025 Chapter 13 Page 25 Item 596
Finishing wall with superior quality water proof cement paint of approved make and quality on new work with two coats to give an even shade including preparing surface by the throughly cleaning & sand papering and supply of all materials,T&P & labour, required for proper completion of work and for each coat of water proof paint after the first two coat to give even shade(total three coat or more). SOR Rampur 2025 Chapter 15 Page 31 Item (660+661)(66+23=89)
MS GATE PANEL 3.00 M WIDE
Excavation in foundation by manual means in ordinary soil (Loam, clay or sand) including lift upto 1.50m and lead upto 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30m from the foundation trenches. SOR Rampur 2025 Item 251 Chapter 4 Page 11
Concrete with 40mm Gauge approved Stone ballast coarse sand of 2.20 - 3.60 F.M and cement in proportion of 8 : 4 : 1 in foundation and under floors including supply of all material, labour and T & P etc. Required for proper completion of the work. SOR Rampur 2025 Item 281 Chapter 5 Page 12
R.C.C. work with cement approved coarse sand of 2.2 -3.6 FM and 2cm gauge approved stone grit in the proportion 1:1½:3 (1 cement: 4.5 mixed aggregate) in footing excluding supply of reinforcement binding the same with 24BWGGI binding wire and including necessary centering and shuttering etc, and also including supply of all material labour and tools and plants etc required for proper completion of the work. SOR Rampur 2025 Item 287 Chapter 5 Page 12
R.C.C. work with cement approved coarse sand of 2.2 -3.6 FM and 2cm gauge approved stone grit in the proportion 1:1½:3 (1 cement: 4.5 mixed aggregate) in column excluding supply of reinforcement binding the same with 24BWGGI binding wire and including necessary centering and shuttering etc, and also including supply of all material labour and tools and plants etc. required for proper completion of the work. SOR Rampur 2025 Item 289 Chapter 5 Page 12
M.S. or TMT bars(FE-500D grade or higher) or HYSD Bars or iron in plain work such as R.C.C. or Column work (when not included in overall rates) wrought to required shape as necessary including bending for proper completion of work shape and including supply of steel. SOR Moradabad 2022 Item 504 Chapter 10 Page 30
Mild Steel or iron work of small size and section such as holding down bolts, hold fast, tie Rods, gratings etc (when not included in overall rates) wrought to required form including supply of steel, bolts, nuts and wastages etc and its fixing required for proper completion work. SOR Moradabad 2022 Item 502 Chapter 10 Page 30
Painting or varnishing work on wood /steel surface with one coat of ready mix priming paint & two coat of approved superior quality synthetic enamel paint including cleaning the surface of all dirt, dust & other foreign materials, sand papering & stripping including supply of all materials ,labour and T&P etc. required for proper completion of work. SOR Rampur 2025 Chapter 15 NEW ITEM S. NO.(1+2+3iii)(23+30+25=78)
Finishing wall with water proof cement paint of approved make and quality on new work with two coats to give an even shade including preparing surface by the throughly cleaning & sand papering and supply of all materials,T&P & labour, required for proper completion of work and for each coat of water prooof paint after the first two coat to give even shade. SOR Rampur 2025 Chapter 15 S.NO.(660+661)(66+23=89)
INTERLOCKING PATHWAY
Excavation in foundation by manual means in ordinary soil (Loam, clay or sand) including lift upto 1.50m and lead upto 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30m from the foundation trenches. SOR Rampur 2025 Item 251 Chapter 4 Page 11
Concrete with 40mm Gauge approved Stone ballast coarse sand of 2.20 - 3.60 F.M and cement in proportion of 8 : 4 : 1 in foundation and under floors including supply of all material, labour and T & P etc. Required for proper completion of the work. SOR Rampur 2025 Item 281 Chapter 5 Page 12
Providing ,laying ,spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base coarse on well prepared surface and compacting with vibratory roller to achieve the desired density.
M-150 brick work in 1:6 ( One cement and six coarse sand of 1.50 - 2.00 F.M mortar) in foundation and plinth including supply of all materials, labour and T&P etc. required for the proper completion of the work. SOR Rampur 2025 Item 303 Chapter 6 Page 14
Cement concrete with 4cm guage approved stone ballast, coarse sand (F.M. 2.2 - 3.60) and cement in proportion of 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of work. SOR Rampur 2025 Item 279 Chapter 5 Page 12
Providing and,laying 60mm thick factory made cement concrete interlocking paver block M-35 grade made by block making machine with strong vibratory compaction of approved size design &shape laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge .
stage.html
html • 0.03 MB
technical_2081796.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.84 MB
PREQUALIFICATIONBIDOCUMENTS.pdf
Tender Documents • 4.19 MB
FINANCIALBIDDOCUMENTS.pdf
Additional Documents • 9.20 MB
BOQ_2081796.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .