Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78.7 LAccepted-AOC VILL PO PALASPAI PS DASPUR DIST PASCHIM MEDINIPUR PIN 721146 | PALASPAI | PASCHIM MEDINIPUR | WEST BENGAL | 721146 | ₹78.7 L | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹79.9 LRejected-Finance VILL SALAMPUR P O BRAHMANBASAN P S DASPUR DIST PASCHIM MEDINIPUR | BRAHMANBASAN | PASCHIM MEDINIPUR | WEST BENGAL | ₹79.9 L | L2 | Rejected-Finance HIGHER THAN FIRST LOWEST |
| 3 | L3₹88.8 LRejected-Finance PARBATIPUR P O P S TAMLUK DIST PURBA MEDINIPUR PIN 721636 | TAMLUK | PURBA MEDINIPUR | WEST BENGAL | 721636 | ₹88.8 L | L3 | Rejected-Finance HIGHER THAN FIRST LOWEST |
| 4 | L3₹88.8 LRejected-Finance AT P O KHUKURDAHA P S DASPUR DIST PASCHIM MEDINIPUR | KHUKURDAHA | PASCHIM MEDINIPUR | WEST BENGAL | ₹88.8 L | L3 | Rejected-Finance HIGHER THAN FIRST LOWEST |
| 5 | L4₹98.5 LRejected-Finance KESHABDIHI P S JHARGRAM DIST JHARGRAM WEST BENGAL PIN 721507 | JHARGRAM | JHARGRAM | WEST BENGAL | 721507 | ₹98.5 L | L4 | Rejected-Finance HIGHER THAN FIRST LOWEST |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
11 Feb 2026, 10:00 amClosed
Superintending Engineer, Western Circle II
Office of The SE, Western Circle II, Station Road, Midnapore, Paschim Medinipore, I and W Dte, PIN 721101
Strengthening and Protection of TE3H2 Embankment over Left Bank of River New Cossye for a length of 460 metre from Ch 30 .185 km to Ch 30.645 km at mouza Mamudabad in Block and PS Debra and Dist Paschim Medinipur in connection with Ghatal Master Plan
2026_IWD_991114_4
WBIW/SE/WC-II/NIT-12e/2025-26.
Open Tender
CIVIL WORKS
180 days
BLOCK DEBRA
AS DEPICTED IN THE NIT
6 documents required · 6 mandatory
₹2.2 L
Yes
15 Mar 2026
21 Jan 2026
12 Feb 2026
21 Jan 2026
11 Feb 2026
21 Jan 2026
Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge.
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, C) Beyond 2.00 km and upto 3.00 km NB :- Measurement to be taken on the basis of stack measurement / pre-post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth (iv) Without pumping out water and shoring
Supplying at site High Density Polyethylene (HDPE) bag of size 0.84 m x 0.38 m conforming to BIS : 14252 : 2015 for bank protective works including all cost of cost of transportation on road by all means,including other incidental charges complete. Note: Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.8 including the sub-paragraphs, i.e. 2.8.1 and 2.8.2 under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification and Special Terms & Conditions for High Density Polyethylene (HDPE) Bags” in case of use of this item in the estimate.”
Labour charges for filling HDPE bags with filler materials (earth/sand), machine stitching the open end of the bag with thread as per design and placing the same on slope or dumping from bank within initial lead of 30m and all lifts including carriage and hire charges of all materials and equipments but excluding the cost of filler materials as directed by Engineer-in-Charge (Volume of earth/sand filled bag should not be less than 0.0328 cum).
Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed. 15 cm av. Diameter
Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. 15 cm av. Diameter
Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site. a) Width of thinner end above 10 cm. and less than 15 cm. (i) Jhaw / Eucalyptus.
Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete.
Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge. NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3"
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incidental charges etc. all complete (capacity 50 kg)."
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or aggregates(stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag.
Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts.
Please Enable Macros to View BoQ information
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Tendernotice_2.pdf
PDF • 0.26 MB
Tendernotice_3.pdf
PDF • 1.20 MB
BOQ_2424014.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid