Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance NO 731 KOVIL STREET MEYYUR MADHURA VINAYAGAPURAM VARAGOOR POST TIRUVANNAMALAI TIRUVANNAMALAI DISTRICT | MEYYUR | TIRUVANNAMALAI | TAMIL NADU | Admitted-Finance |
Tender Value
₹76.9 L
EMD Value
₹77,000
Closing Date
16 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director, DRD
DRDA, Collectorate Campus, Vengikkal, Tiruvannamalai
Providing Infrastructure Development works to AGAMT 2021-22 Village Panchayat at Vengikkal Panchayat of Tiruvannamalai Block in Package No. TVM/2021-22/73 Tiruvannamalai District
2022_RDTN_238113_1
Roc.No.1250/2022/A13 Dt.22.06.2022 73
Open Tender
Civil Works
Item Rate
180 days
Tiruvannamalai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹77,000
Yes
23 Aug 2022
30 Jun 2022
16 Aug 2022
30 Jun 2022
16 Aug 2022
30 Jun 2022
45 days
Amount
Part I Providing CC Pavement in Kuriniji Nagar at Vengikkal Panchayat (148M)
Earth work excavtion for foundtion in all soils to full depth etc…ordinary soil complete
Cement concrete 1:4:8 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification
Cement concrete 1:3:6 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Provision for Bitumen Pad
Provision for Name Board
Part II Providing CC Pavement in Balakirushna Nagar at Vengikkal Panchayat (300M)
Earth work excavtion for foundtion in all soils to full depth etc…ordinary soil complete
Cement concrete 1:4:8 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification
Cement concrete 1:3:6 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Provision for Bitumen Pad
Provision for Name Board
Part III Providing CC Pavement in Vedhavalli Nagar at Vengikkal Panchayat (250M)
Earth work excavtion for foundtion in all soils to full depth etc…ordinary soil complete
Cement concrete 1:4:8 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification
Cement concrete 1:3:6 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Provision for Bitumen Pad
Provision for Name Board
Part IV Providing CC Pavement in Ezhil Nagar (Opp. To Deepam gas office) at Vengikkal Panchayat (164M)
Earth work excavtion for foundtion in all soils to full depth etc…ordinary soil complete
Cement concrete 1:4:8 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification
Cement concrete 1:3:6 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Provision for Bitumen Pad
Provision for Name Board
Part V Providing CC Pavement in Balakrishna Nager Cross Street at Vengikkal Panchayat (170M)
Earth work excavtion for foundtion in all soils to full depth etc…ordinary soil complete
Cement concrete 1:4:8 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification
Cement concrete 1:3:6 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Provision for Bitumen Pad
Provision for Name Board
Part VI Providing CC Pavement in Kalal Police station Road in Om Sakthi Nagar at Vengikkal Panchayat (50M)
Earth work excavtion for foundtion in all soils to full depth etc…ordinary soil complete
Cement concrete 1:4:8 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification
Cement concrete 1:3:6 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Provision for Bitumen Pad
Provision for Name Board
Part VII Improment of Burial Ground of Construction of Compound wall (129M) ,CC Pavument (54M) and Water Supply Arrangements in Jai bheem Nagar at Vengikkal Panchayat
Construction of Compound Wall
Earth work excavtion for foundtion in all soils to full depth etc…ordinary soil complete
Cement concrete 1:4:8 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification. Below Ground Level
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification. Above Ground Level
Reinforced cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Exterior emulsion two coats using best freshly burnt shell lime in all the floors using best quality & approved variety of colouring pigments including cost of lime, colouring pigment, Fevicol type gum, brushes,scaffolding charges etc., complete
Cost and Supply of Mild Steel Gate including all material and labour charges etc
Painting two coats over new iron works with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete
Providing CC Pavement
Earth work excavtion for foundtion in all soils to full depth etc…ordinary soil complete
Cement concrete 1:4:8 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification
Cement concrete 1:3:6 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Water Supply Arrangements
Towards Conducting Geophysical Survey charges
Drilling in hard rock area 150mm dia borewell including cost and conveyence etc.
Drilling in hard rock area 150mm dia borewell including cost and conveyence etc.
Cost and supply of 180mm PVC 6Ksc Casing Pipe including cost & Conveyence etc.
2HP Submersible Motor
2HP Panel Board
MS Kiosk Box
1000 Ltr HDPE Tank
HDPE Hose
Nylone Rope
2.50 Sqmm Cable Wire
32mm PVC Pipe
32mm PVC Elbow
32mm GI Pipe
32mm PVC Elbow
32mm GI Union
GI Flangeset
20mm GI Nipple
20mm GI Coupling
20mm GI Tap
MS Clampset
Borewell Cover Plate
Fuse Carrier
32mm GI Service Pipe
Service wire SD 65
Earthwork excavation and deposing on bank with initial lead and lift asper SS20B
Laying and Jointing of PVC pipes and specials
Refilling the excavated earth to the pipeline trench including all labour charges etc,, complete
Labour charges for errction of Pumpset & specials
Provision for Name Board Charges
Part VIII : Construction of Angamwadi Building in Iyyappan Nagar at Vengikkal Panchayat
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Filling with Excavated earth including cost and conveyance to the site and all labour etc complete.
Filling with Quarry Metal Sand in to the basement including cost and conveyance to the site and all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. Below G.L
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. Above G.L
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete. Below Ground Leval
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete. Above Ground Leval
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete (Below Gl)
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete Column
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete , (Lintel , Roof )
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete Sunshade
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc..
Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc
Terrace flooring with one coarce of old &new machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same
Plastering with Cement Morter 1:5 mix 12mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Plastering with Cement Morter 1:3 mix 10mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Providing Granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 20mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum
Paving the floor with sAnti Skid Ceramic tiles
Dadooring wall color glazed tiles 150x150x6mm
Towards the cost of steel door of size 0.90 mx2.10 m including all charges etc.
Towards the cost of steel door of size 0.75 mx 1.20 m including all charges etc.
Towards the cost of steel door of size 0.75 mx 1.20 m including all charges etc.
Towards the cost of steel ventilator of size 0.90x0.45 m including all charges etc.
Towards the cost of steel Window of size 1.20mx1.30 m including all charges etc.
Provision for electrification arrangements with service connection Charges
Light point (SD20)
Fan point (SD20)
Ceiling fan sd112
Plug point sd30
CFL lamp (SD80)
DPI swtich of 500 V (SD142)
G I Pipe (SD69)
Service wire SD 65
Bulk head fitting (SD84)
Painting two coat with approved quality of oil bound distemper with colour over one coat of white cement for primier coat for the base including preparing surface and all materials cost labour etc
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc complete.
Painting two coats using Ist quality readymix enamel paint of approved colour over new iron work including cost and conveyance and all labour charges etc.
Towards the cost and supply of 4" Rainwater Downfall pipe fixing with clamps etc .
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
MDP Constructions
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .