| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | -21.21% | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹8.7 L (5.51%)Admitted-Finance 21 B ARJUN NAGAR AMBALA CANTT | -16.87% | ₹1.7 Cr+₹8.7 L (5.51%) | L2 | Admitted-Finance |
Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
22 Aug 2026, 3:00 pmClosed
Kailash Chander Kala ravi kumar and Vivek Sharma
DIV Ambala
Special repair of parking pavement and road in commercial area in Sector 2 Phase II Urban Estate Kurukshetra Providing and laying of GSB WMM 60mm and 80mm interlocking concrete paver block over bed DLC M10 PCC Kerbs etc complete in all respect
2026_HBC_538516_1
20267AE23CBA 298D 4BF7 9E73 DC83F705030C239HSV
Open Tender
Civil Works
Works
180 days
Kurukshetra (Thanesar)
Including Three years defect liability Mtc Free of cost
2 documents required · 2 mandatory
₹3,000
₹4.0 L
Yes
27 Aug 2026
4 Aug 2026
24 Aug 2026
4 Aug 2026
22 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.27.1]Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) : 1. Flush/ Ruled pointing [Through Rate] | 1 | Sqm | 88 | ₹87.91 |
| 2 | [17.14.2]Granular Sub-Base with Close Graded Material - (Table:- 400-1) Plant mix method
Construction of granular sub-base by providing Material as per Grading III (Table 400-I of MORTandH 5th revision) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per technical clause 401 of MORTandH specifications 2. Grading II material [Through Rate] | 1 | cum | 1,187 | ₹1,185.81 |
| 3 | [17.24]Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per technical clause 406 of MORT&H specifications [Through Rate] | - | cum | 1,174 | - |
| 4 | [17.4]Scarifying Existing Bituminous Surface to a depth of 50 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead up to 1000 metres, as per technical clause 202 of MORT&H specifications [Through Rate] | - | Sqm | 6 | - |
| 5 | [17.44]Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing, as per clause 601 of MORT&H specifications [Through Rate] | - | cum | 2,057 | - |
| 6 | [17.5.3]Compacting Original Ground 3. Compaction of Earthwork
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate] | - | Sqm | 7 | - |
| 7 | [17.6]Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. [Through Rate] | 1 | cum | 184 | ₹183.82 |
| 8 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate] | - | Sqm | 655 | - |
| 9 | [17.69.3]Interlocking Concrete Block Pavement 3. Providing and Laying 60 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 35 over the bed of 25 mm thick fine sand complete in all respect. [Through Rate] | - | Sqm | 576 | - |
| 10 | [34.19.1]Hazard Marker sign board 300x900mm rectangular as per IRC 67- 2012 with retro reflective Sheeting as per ASTM D 4956 09 and IRC 67 2012, fixed over 4mm thick Aluminium Composite Material (ACM) sheeting having skin thickness of 0.4 to 0.5 mm on both sided and fixing the same with suitable size aluminium alloy rivets @ 200 mm c/c to back support frame of 25x25x3mm angle iron supported on a square hollow steel section post 60x60x3.2mm conforming to IS 4923 firmly fixed to ground including foundation concrete M-25 of size 0.45x0.45x0.60m for vertical post complete as per clause 801 of MORTandH specifications. Supplier shall provide a warranty as per clause 6.9 of IRC 67-2012 for retro reflective sheeting and a certified copy of test reports from an independent test laboratory including three year outdoor weathering test report for sheeting tested in India condition conforming to clause 6.7 of IRC 67- 2012. 1. Using retro reflective Sheeting Class C as per IRC 67 2012 [Through Rate] | - | Each | 3,606 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_617723.xls
BOQ • 0.34 MB
corrigendum17082026369.pdf
PDF • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .