Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.3 L+₹8,457.70 (3.73%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.4 L+₹14,799.13 (6.53%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹2.5 L+₹25,106.73 (11.1%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹3.0 L+₹69,504.13 (30.7%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.7 L
EMD Value
₹11,100
Closing Date
21 Sept 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
03 NO LANES FROM L/O ASHRAF PARRY ONWARDS, LANE FRON RASHID GANIE TO ONWARDS AND LANE FROM H/O GH RASOOL GANIE TO ON WARDS BLOCK BIJBEHARA
2026_RDPR_324543_3
ENIT108of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹11,100
24 Sept 2026
14 Sept 2026
22 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5M in width as well as 10Sqm on plan) including dressing of sides ramming of bottoms lift up to 1.5M including getting out the excavated soil and disposal of surplus excavated soil within a lead of 1 M from edge of cutting. | 3.61 | cum | 479 | ₹1,729.19 |
| 2 | p/l of stone solling tightly hand packed inc carriage cj | 22 | cum | 1,170 | ₹25,740 |
| 3 | providing and laying in position cement concrete 1:4:8 of specified grade using 40mm nominal size aggregates. Excluding cost of centering and shuttering all work upto plinth level | 19.16 | cum | 5,202.9 | ₹99,687.56 |
| 4 | providing and laying in position cement concrete 1:2:4 of specified grade using 20mm nominal size aggregates. Excluding cost of centering and shuttering all work upto plinth level | 32.63 | cum | 6,540 | ₹2,13,400.2 |
| 5 | centering and shuttering inc. strutting and propping etc inc. removal of same | 35.95 | sqm | 286 | ₹10,281.7 |
| 6carriage of materials by M.T | |||||
| 6.1 | aggregates 15km | 51.79 | cum | 340.6 | ₹17,639.67 |
| 7 | Provision for signboard & photographs and other unforeseens(sta) | 1 | job | 1,500 | ₹1,500 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_1094884.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .