Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Fee/PreQual/Technical/Finance | -30.00% | ₹1.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.6 L+₹10,522.59 (7.14%)Admitted-Fee/PreQual/Technical/Finance | -25.00% | ₹1.6 L+₹10,522.59 (7.14%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.1 L
EMD Value
₹4,300
Closing Date
18 Aug 2026, 5:00 pmClosed
Executive Engineer REW Kishtwar
Hall no. 4, 1st Block , Mini Sectt. Kishtwar
REFER BOQ
2026_RDPR_318956_5
e-NIT No 73 of REW KISHTWAR 2026-27 Dated. 31.07.2026
Open Tender
Civil Works
Percentage
30 days
KISHTWAR
REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹4,300
Yes
2 Sept 2026
1 Aug 2026
19 Aug 2026
1 Aug 2026
18 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m
in width as well as10 sqm on plan including disposal of excavated earth,
leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge.
All kinds of soil : | 198 | SQM | 91.75 | ₹18,166.5 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: 2.8.1 All kinds of soil : | 7.6 | Cum | 479.3 | ₹3,642.68 |
| 3 | RANDOM RUBBLE MASONRY
Random Rubble masonry with hard stone in foundation and plinth
including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse
sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and
curing complete with:
7.1.1 Cement mortar 1:6 (1 Cement : 6 coarse sand) | 12 | Cum | 5,402.9 | ₹64,834.8 |
| 4 | Dry stone pitching (any thickness) excluding cost of stones.
24.4.1 On Horizontal | 1.98 | Cum | 535.55 | ₹1,060.39 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for:
4.6.1 MASS CONCRETE WORK | 19.8 | SQM | 286.35 | ₹5,669.73 |
| 6 | CEMENT CONCRETE (CAST-IN-SITU)
Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering.4.4.5 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 14.85 | CUM | 5,733.6 | ₹85,143.96 |
| 7 | C/O SAND AND AGG | 24.61 | Per CUM | 610.61 | ₹15,027.11 |
| 8 | C/O STONE | 11.88 | Per CUM | 1,212.68 | ₹14,406.64 |
| 9 | CIB | 1 | NO | 2,500 | ₹2,500 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_1054038.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .