| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAccepted-Finance R O KHONI PO HATKOTI TEHSIL JUBBAL DISTT SHIMLA H P | SHIMLA | HIMACHAL PRADESH | 170009 | ₹7.8 L | L1 | Accepted-Finance OK |
| 2 | L2₹7.9 L+₹14,986 (1.92%)Rejected-Finance | ₹7.9 L+₹14,986 (1.92%) | L2 | Rejected-Finance OK |
Tender Value
₹7.5 L
EMD Value
₹15,000
Closing Date
23 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
HPPWD Jubbal
SH 5/7 mtr wide F/C between RD 0/090 to 0/285
2026_PWD_141370_2
5520-23, Dated 07.08.2026
Open Tender
Civil Works
Percentage
Jubbal
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
₹15,000
29 Aug 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
23 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in earth work in hilly area in all heights and depths in all kinds of soil including saturated soil comprising of mixed soil, ordinary and hard rock. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion,damage to hill side.Water pollution, etc and to protect soil stability of hill side rock shall be excavated with chiseling and wedging our rock (where blasting is prohibited).All earth work in cutting/excavation including rock excavation shall be carried out true to line,grades,slops,width,camber,super elevation and level as shown on the drawing as per direction of Engineer in Charge in conformity with the requirement of technical specification for rural roads august 2004 clause 16.2 of general conditions of contract to achieve designed formation width including hauling and stacking of material useful for construction at suitable sites and stage, disposal of unsuitable cut material in specificied manner, trimmingfilling of unevenness blindage and finishing of the road to specified diamensions or as directed by Engineer in charge for smooth riding.The recovery of useful stones shall be made from the contractor and recovery of 384.39 cubic meter useful stones shall be made @ 300/-per cubic meter on prorata basis in each running bill. Any loss to the public and private property during the course of excavation shall be resorted by the contractor what so ever the nature of the same may be.The servicable material will be stacked out specified /dimension in all leads and lifts as per the direction of Engineer in Charge. | 2,741.33 | per cubic meter | 273.33 | ₹7,49,287.73 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_209850.xls
BOQ • 0.23 MB
sbd.pdf
Tender Documents • 2.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .