| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95.6 LAccepted-AOC | L1 | Accepted-AOC The lowest Rate Quoted | |
| 2 | L2₹97.1 L+₹1.5 L (1.58%)Rejected-Finance NO 234 NGO NEW COLONY PERUMALPURAM TIRUNELVELI DISTRICT | TIRUNELVELI | TAMIL NADU | 627001 | L2 | Rejected-Finance The Highest Rate Quoted | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹97.8 L
EMD Value
₹2.0 L
Closing Date
7 Jul 2020, 3:00 pmClosed
Project Director
DRDA, Tirunelveli
Renewal of Puthupatti to Panayankurichi in Pappakudi block
2020_RDTN_95247_6
DIPR/1284/tender/2018 pmgsy incentive
Open Tender
Civil Works - Roads
Item Rate
120 days
Tirunelveli District
Scanned copy of pre qualification details
3 documents required · 3 mandatory
₹0
₹2.0 L
Yes
DRDA, Tirunelveli
10 Dec 2020
22 Jun 2020
7 Jul 2020
22 Jun 2020
7 Jul 2020
2 Jul 2020
26 Jun 2020
Amount
Renewal of Puthupatti - Panayankurichi Km 0/0-6/720 in Pappakudi block
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Picking the existing surface to 50mm to 100mm thick including labour and hire charges for picking tools and plants and all other incidental charges etc complete as per standard specifications.
Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling including hire charges for consolidation etc. complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I . Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
.Advance Bituminous patch work (Average thickness of of 25mm) with 13.2mm IRC HBG metal premixed with 44kg of Bitumen including cost and conveyance of metal from approved quarry, cost of bitumen, labour charges for leveling, tamping etc., complete complying with standard specification.
Applying TACK COAT over BT surface at 3 Kg of RS-1 Bitumen Emulsion/ 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510
Painting of typical PMGSY informatory name board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be we welded with MS angle irone frame of 25 mm x 25 mm x 5 mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75 mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450 mm x 450 mm x 600 mm, 600 mm below ground level. The top most diamond plate will be welded to middle plate by 47 mm x 47mm of 12 SWG sheet tube. All M.s. will be stove enameled on both sides. Lettering and printing arrows, border etc., will be pointed with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 MORD
Provision for Hectametre stone of size 0.75mx0.23mx0.10m
Providing Road furnitures(sign board
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the second six months from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Renewal Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}(Refer clause 13.2 & 13.3 of section 2 of instruction to bidders (ITB) of SBD)
Maharajan
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .