Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹3.0 L (2.49%)Admitted-Finance | ₹1.2 Cr+₹3.0 L (2.49%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹3.3 L (2.75%)Admitted-Finance | ₹1.2 Cr+₹3.3 L (2.75%) | L3 | Admitted-Finance |
| 4 | L4₹1.4 Cr+₹17.3 L (14.2%)Admitted-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹1.4 Cr+₹17.3 L (14.2%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S AJAY TOMAR CONTRACTOR L3 | SHIVAM ENTERPRISES L4 | ASHUTOSH ENTERPRISES L1 | KUMAR TRADING COMPANY L2 |
|---|---|---|---|---|---|---|---|
| 1.00(Schedule Q-1 Supply Portion) | |||||||
| 2.00 | Supply of Fabrication ,Galvanising, Inspection&supply of 132 KV DC type tower including (with stub), templates, extensions as per KPTL drawing & BOM
DA (A+5) 04 No.
DB (B+0) 02 No.
DC (C+0) 06 No | 65.51 | MT | 95,000 ₹62,23,830 | 90,000 ₹58,96,260 Lowest | 90,000 ₹58,96,260 Lowest | 94,000 ₹61,58,316 |
| 3.00 | Hot dip galvanised, hexagon,Round hexagon head transmission towers bolts ,nuts &washers for above styructure as per BOM including step bolts & spring washers. | 2.5 | MT | 1,05,000 ₹2,62,500 Lowest | 1,09,000 ₹2,72,500 | 1,25,000 ₹3,12,500 | 1,22,000 ₹3,05,000 |
| 4.00 | Number Plate | 12 | Nos | 300 ₹3,600 | 200 ₹2,400 Lowest | 200 ₹2,400 Lowest | 490 ₹5,880 |
| 5.00 | Danger plate | 12 | Nos | 300 ₹3,600 | 200 ₹2,400 Lowest | 200 ₹2,400 Lowest | 490 ₹5,880 |
| 6.00 | Phase plate in sets of red, blue and yellow | 8 | Set | 300 ₹2,400 | 200 ₹1,600 Lowest | 220 ₹1,760 | 490 ₹3,920 |
| 7.00 | Pipe type earthing material per tower | 12 | Nos | 2,400 ₹28,800 | 2,700 ₹32,400 | 1,850 ₹22,200 Lowest | 2,500 ₹30,000 |
| 8.00 | 120 KN Silicon Polymer Insulator | 102 | Nos | 3,400 ₹3,46,800 | 5,000 ₹5,10,000 | 3,000 ₹3,06,000 Lowest | 3,250 ₹3,31,500 |
| 9.00 | 70 KN Silicon Polymer Insulator | 24 | Nos | 3,100 ₹74,400 | 1,200 ₹28,800 Lowest | 2,500 ₹60,000 | 2,800 ₹67,200 |
| 10.00 | Single Suspension fitting for ACSR Panther Conductor | 24 | Nos | 2,600 ₹62,400 | 2,700 ₹64,800 | 1,050 ₹25,200 Lowest | 2,700 ₹64,800 |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
21 Dec 2023, 5:00 pmClosed
SE ETC MUZAFFARNAGAR
NEAR 132 KV SUB STATION BHOPA ROAD MUZAFFARNAGAR
ETC MU T 33 2023 24
2023_UPTCL_869634_1
ETC MU T 33 2023 24
Open Tender
Electrical Works
Item Rate
120 days
SAHARANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
EE ETD MUZAFFARNAGAR
₹1.4 L
2 Jan 2024
11 Dec 2023
22 Dec 2023
11 Dec 2023
21 Dec 2023
11 Dec 2023
Amount
(Schedule Q-1 Supply Portion)
Supply of Fabrication ,Galvanising, Inspection&supply of 132 KV DC type tower including (with stub), templates, extensions as per KPTL drawing & BOM DA (A+5) 04 No. DB (B+0) 02 No. DC (C+0) 06 No
Hot dip galvanised, hexagon,Round hexagon head transmission towers bolts ,nuts &washers for above styructure as per BOM including step bolts & spring washers.
Number Plate
Danger plate
Phase plate in sets of red, blue and yellow
Pipe type earthing material per tower
120 KN Silicon Polymer Insulator
70 KN Silicon Polymer Insulator
Single Suspension fitting for ACSR Panther Conductor
Performed Armard rod for ACSR Panther conductor
Single Tension fitting for ACSR Panther conductor
Double tension fitting for ACSR Panther conductor
Vibration damper for ACSR Panther conductor
Bird guard for tower
Repair Sleeve for ACSR Panther Conductor
Mid Span joint for ACSR Panther Conductor.
Anti-Climbing Device
ACCESSORIES SUITABLE FOR OPGW
Tension Clamp
Vibration Damper
Suspension Clamp
Copper Bond
48 Fiber (DWSM) OPGW Fiber Optic Cable
Joint Box (48 Fiber)
FODP 48 Fiber
Supply of hardware set for 48 fiber (DWSM, G.652D) Fiber Optic approach Cable
Fiber optic aproach cable for 48F OPGW
(Schedule Q-2 Work Portion)
Cost of Excavation of 132 KV foundation pits including all earthwork, backfilling & levelling etc.
Setting of stubs including all foundation work but excluding the cost of concerting & excavation for following 132 KV Towers.
DA (A+5) 04 No.
DB (B+0) 02 No.
DC (C+0) 06 No
Cost of Concreting for following 132 KV Tower Foundation including cost of cement ,Dewatering ,Shoring & shuttering ,Forming and curing but excluding cost of reinforcement bars with 1:2:4 Mix Concrete.
Installation of steel reinforcement bars in RCC foundation including cost of steel reinfocement bars with cutting, placing them in foundation pits.
Erection of Super structure of 132 KV DC and Anchor tower and their extension wherever requider including all works above ground level exluding hoidting of insulators,hardware & accessories, but including fitting of danger, number, phase plates, bird guards and fixing and punching.
Tack welding of all the bolts upto the height of second section of the tower from ground Level with three tacks of 10MM /12mm electrode and application of zink rich Almunium paint on the effected surface including cost of material.
Double circuit all sizes conductor laying, stringing, tensioning clamping, jointing etc of ACSR Panther conductor including hoisting of insulators, fitting of all necessary hardware and accessories i.e. fitting armour rods, vibration dampers etc on all 6 phases.
Laying, stringing, tensioning clamping, jointing, including fittings of all Hardware and accessories of OPGW & OFAC, termination at S/s, end to end connectivity & testing on 132 KV line.
Installation , laying, test & commisioning of links etc. of 48 fibre (DWSM) OPGW Fibre Optic Cable alongwith all necessary Hardware sets excluding Joint Box.
Earthing work including all earth Work Etc. for Pipe type earthing including cost of coal & salt accept Earthing Pipe.
Survey including preparation of schedule of materials, marking of locations (Route length),GPS Survey of line with co-ordinates of each tower(The length of line shall be authenticated by GPS Survey)
Check survey
Soil investigation ( All kind of Soil)
De-Stringing of old ACSR Panther conductor including de-hoisting of all the necessary hardware and accessories of all six phases (Lilo Point in between tower location no. 23 & 25)
Dismentalling of A Type tower No. 24 after cutting of bolts with all safety and precaution alongwith associated work.
Dismatalling of earlier foundation which includes Excavation, Breaking of foundation 2 mtr. of depth and removing of concrete, Cutting, removing of stub and steel reinforcement, backfilling, levelling.
KUMAR TRADING COMPANY
M/S AJAY TOMAR CONTRACTOR
SHIVAM ENTERPRISES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
T33.pdf
Tender Documents • 1.30 MB
BOQ_1480533.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .