Loading…
Loading…
Tender Value
₹3.8 L
EMD Value
₹3,750
Closing Date
8 Jul 2026, 12:00 pm
Similar tender results from the same govt authority in the past 3 years.
SE, EUDC-TECHNICAL, NOIDA
33/11 KV SUBSTATION, SECTOR-18 FIRST FLOOR, OPPOSITE SAB MALL, NOIDA
Replacement of Damaged Power Transformer on time to time Under EUDD-33 KV STD./EXP./YEIDA NOIDA
2026_PVVNL_1162459_1
34/EUDC-T/2026-27/NOIDA (WORKS)
Open Tender
Electrical Works
UNDER EUDD-33 KV STADIUM/EXPRESSWAY/YEIDA NOIDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Yes
SE, EUDC-TECHNICAL, NOIDA
₹3,750
Yes
20 Jun 2026
20 Jun 2026
8 Jul 2026
20 Jun 2026
8 Jul 2026
20 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1FOR CARRYING OUT THE WORK REPLACEMENT OF DAMAGED 5/8/10 MVA POWER TRANSFORMER ON TIME TO TIME INSTALLED AT VARIOUS 33/11 KV SUBSTATION UNDER EUDD-TECHNICAL 33KV LINE & SUBSTATION, STADIUM/EXPRESSWAY/YEIDA, NOIDA AS PER FOLLOWING :- | |||||
| 1.01 | Safely shifting of 03 No. damaged 05 MVA/08 MVA Power Transformer from the plinth of 33/11 KV substation to the safe place with in the switchyard with the help of heavy duty crane after opening the all connections of cable/conductor from 33 & 11 KV side and cutting all the earthing strips. Draining of complete Transformer oil in oil drums and dismantling of all accessories, radiators etc. and proper stacking at safe place. | 1 | Nos. | 100 | ₹100 |
| 1.02 | Cartage of empty oil drums from store and return of oil filled drums to store. | 1 | Nos. | 100 | ₹100 |
| 1.03 | Neat Welding of all the earthing strip of newly installed 05 MVA/08 MVA Power Transformer by proper overlapping and making connection of all cables / conductor of HV/LV side, control cables of Tranformer at various 33/11 KV substaion and 2 providing assistance in testing. New earthing strip if required for proper completion of work shall be provided by the contractor. | 1 | Nos. | 100 | ₹100 |
| 1.04 | Safely shifting of 03 No. damaged 10 MVA Power Transformer from the plinth of 33/11 KV substation to the safe place with in the switchyard with the help of heavy duty crane after opening the all connections of cable / conductor from 33 & 11 KV side and cutting all the earthing strips. Draining of complete Transformer oil in oil drums and dismantling of all accessories, radiators etc. and proper stacking at safe place. | 1 | Nos. | 100 | ₹100 |
| 1.05 | Cartage of empty oil drums from store and return of oil filled drums to store. | 1 | Nos. | 100 | ₹100 |
| 1.06 | Neat Welding of all the earthing strip of newly installed 10 MVA Power Transformer by proper overlapping and making connection of all cables / conductor of HV/LV 1.06 side, control cables of Tranformer at various 33/11 KV substaion and providing 2 assistance in testing. New earthing strip if required for proper completion of work shall be provided by the contractor. | 1 | Nos. | 100 | ₹100 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
DOC.pdf
Tender Documents • 0.96 MB
BOQ_2178805.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid