Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-Finance | ₹1.2 Cr | L1 | Accepted-Finance Low Rate |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.2 Cr
EMD Value
₹8.0 L
Closing Date
2 May 2026, 3:00 pmClosed
Executive Officer
Nagar Palika Parishad Anupshahr
Operation and Maintenance of S.T.P (Gramin) Zone A 1.5 M.L.D Zone B 1.0 M.L.D MBBR technology base STPs and other appurtenant works
2026_DOLBU_1135303_1
42/NPPASR/2026-27/09-04-2026
Open Tender
Miscellaneous Works
365 days
Nagar Palika Parishad Anupshahr
Please refer Tender documents.
2 documents required · 2 mandatory
₹14,200
Executive Officer
₹8.0 L
Nagar Palika Parishad Anupshahr
16 May 2026
10 Apr 2026
2 May 2026
10 Apr 2026
2 May 2026
10 Apr 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Operation and Maintenance of 1.5 MLD S.T.P at zone A& 1.0 MLD S.T.P at Zone B with their MPS (Main Pumping Station)/IPS (02 Nos S.T.P & 02 Nos M.P.S) for 1 year. Payment shall be released monthly. Duties during O&M: plant to be run 24/7. Adequate security and operators to be provided for proper plant operation including all neccessary supply of MBBR Media,chlorine and other damaged aquipment motor pump to be provided by the contractor and also repairing of all mechanical & electrical equipments including LT ,HT panel parts shall be the responsibility of contractor. Treated water quality target should be monitored by PMC (random sampling). Equipment’s maintenance and repair, replacement and maintenance of plants, shall be the responsibility of contractor and also deficiency found in parameter of sample of treated water will be the responsibility of contractor . in case of power failure, the contractor will be responsible for running the plant from the DG Set, No extra payment will be made to the contractor for which. | - | Job | - | - | 2 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_2119622.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid