| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr Quoted ₹1.8 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹2.0 CrRejected-Finance SIRSA | ₹2.0 Cr | L2 | Rejected-Finance Highest |
| Sl No | Description | Qty | Unit | M/s. shivji Singla and Sons, SIRSA L2 | LAPHRIYA CONSTRUCTION COMPANY L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. | 265.38 | Cum | 350 ₹92,883 | 300 ₹79,614 |
| 2.00 | Dismantling concrete Reinforced cement concrete. | 1.81 | Cum | 2,884 ₹5,220.04 | 2,553 ₹4,620.93 |
| 3.00 | Dismantling cement conglomerate floors 25mm
to 50mm thick including concrete base. | 79.15 | Sqm | 150 ₹11,872.50 | 135 ₹10,685.25 |
| 4.00 | Supply of Bolder Stone and Carriage of boulder stone as per Department Specification including digging,collection, all Taxes,loading,unloading,stacking & Recarriage if any from Govt. aprroved Quarry to stack site. | 278.62 | Cum | 1,574 ₹4.4 L | 1,407 ₹3.9 L |
| 5.00 | Weaving wire netting for wire crates
including binding sides and partitions to make
crate of 15 cm x 15 cm or 25 cm x 7.5 cm
mesh. | 1,144.22 | Sqm | 260 ₹3.0 L | 200 ₹2.3 L |
| 6.00 | Filling stones or spalls into crates and hand
packing. | 278.62 | Cum | 1,750 ₹4.9 L | 1,618 ₹4.5 L |
| 7.00 | Laying of Dry Brick Ballast 40 mm gauge for
flooring. | 7.15 | Cum | 1,800 ₹12,870 | 1,714 ₹12,255.10 |
| 8.00 | Cement concrete 1:4:8 With stone aggregate 40mm gauge mixing by manual means. | 28.63 | Cum | 5,000 ₹1.4 L | 4,243 ₹1.2 L |
| 9.00 | Providing precast cement concrete Jali 1:2:4
(1 cement: 2 coarse sand : 4 graded stone
aggregate 6mm nominal size) reinforced with
1.6 mm dia mild steel wire including centring
and shuttering, roughening cleaning, fixing
and finishing in cement mortar 1:3 (1 cement:
3 fine sand) etc. complete excluding
plastering of the jambs, sills and soffits.40 mm thick. | 89.96 | Sqm | 1,550 ₹1.4 L | 1,430 ₹1.3 L |
| 10.00 | Finishing walls with exterior decorative
cement based paint such as snowcem,
robbiacem etc. two or more coats to give an
even shade. | 179.93 | Sqm | 130 ₹23,390.90 | 98.22 ₹17,672.72 |
Updated dates
Tender Value
₹1.6 Cr
EMD Value
₹3.3 L
Closing Date
8 Jan 2026, 11:00 amClosed
Execuitve Engineer
Executive Engineer Building Maintenance and Plantation Division
Estimate For Protection And Restoration Of Slided Hill slopes Occurred Near Tourist Huts And Committee Room Of Ranjit Sagar Dam Project
2025_WR_155608_1
20/2025
Open Tender
Civil Works
180 days
Ranjit Sagar Dam side
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹3.3 L
19-12-2025
4 May 2026
16 Dec 2025
8 Jan 2026
16 Dec 2025
8 Jan 2026
16 Dec 2025
19 Dec 2025
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil.
Dismantling concrete Reinforced cement concrete.
Dismantling cement conglomerate floors 25mm to 50mm thick including concrete base.
Supply of Bolder Stone and Carriage of boulder stone as per Department Specification including digging,collection, all Taxes,loading,unloading,stacking & Recarriage if any from Govt. aprroved Quarry to stack site.
Weaving wire netting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm or 25 cm x 7.5 cm mesh.
Filling stones or spalls into crates and hand packing.
Laying of Dry Brick Ballast 40 mm gauge for flooring.
Cement concrete 1:4:8 With stone aggregate 40mm gauge mixing by manual means.
Providing precast cement concrete Jali 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 6mm nominal size) reinforced with 1.6 mm dia mild steel wire including centring and shuttering, roughening cleaning, fixing and finishing in cement mortar 1:3 (1 cement: 3 fine sand) etc. complete excluding plastering of the jambs, sills and soffits.40 mm thick.
Finishing walls with exterior decorative cement based paint such as snowcem, robbiacem etc. two or more coats to give an even shade.
Plastering on walls 6 mm thick cement plaster.
scaliing of hill slope, preparation of sub-grade, cutting up to 150mm depth with hand or pneumatic tools, complete on all respect as per department specification.
Providing & Fixing of Anchor bar 6.1m long, 25mm dia ,6 m deep 2m c/c in rock by drilling hole of 65mm dia & grouting with cement Sand mortar, Non Shrinking (Strength equivllent to M20 Grade concrete ) complete in all respect as per design Drawing Specification to the statisfaction of Engineer-in-charge
Providing & fIxing in Position Welded Steel Mesh 200x200 by 6mm size along slope as required & holding mesh by welding cleat with Anchor bar, fixing Upins,fasterner, Plates etc ompelet in all respect as per Department design & Specification of Engineer-in-charge.
Short-creting 1:3:1 of Rock slope with shot creting machine up to thickness of +75 mm with tolerance of 5mm. This Includes supply and carriage of material, loading & unloading at site of work, Curing complete in all respect as per Department design & Specification.
Supply & Installation of Performate PVC pipe in hill slope 100mm dia 1m long , including drilling curing & Wrapping with Geo Fabric complete in all respect as per Department design & Specification.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
BOQ_315907.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid