| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 450 SENTAMIL NAGAR MELATHURAIYUR KANNAMANGALAM POST ILAYANGUDI SIVAGANGAI 630709 | SIVAGANGA | TAMIL NADU | 630709 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹29.7 L
EMD Value
₹30,000
Closing Date
26 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
O/o Project Director, DRDA, Sivagangai
AGAMT II 2021-22 Rejuvenation of water bodies works at Ilayangudi Block in Sivagangai District - Package No. 19
2022_RDTN_242578_1
19_Pack_AGAMT II 21-22/ILY
Open Tender
Civil Works
Item Rate
90 days
Sivagangai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹30,000
13 Aug 2022
19 Jul 2022
26 Jul 2022
19 Jul 2022
26 Jul 2022
19 Jul 2022
Amount
PROVIDING BATHING GHAT AND RETAINING WALL AT SATHANI VILLAGE IN SATHANI PANCHAYAT
Construction of Bathing Ghat
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Construction of Retaining Wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
IMPROVEMENTS OF OORANI (MAIN POND, RETAINING WALL, AND STEPS) AT VINAYAGAR KOIL OORANI IN PERUMBATCHERI PANCHAYAT
Main Pond
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (based on standard schedule of rates vid., S.no 86 Item no.1)
Construction of Retaining Wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Construction of Bathing Ghat
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
IMPROVEMENTS OF OORANI (MAIN POND, RETAINING WALL, AND STEPS) AT KAKKA OORANI IN SALAIGRAMAM VILLAGE IN SALAIGRAMAM PANCHAYAT
Main Pond
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (based on standard schedule of rates vid., S.no 86 Item no.1)
Construction of Retaining Wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Construction of Bathing Ghat
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
IMPROVEMENTS OF OORANI (MAIN POND, RETAINING WALL, AND STEPS) AT MARANGULAM OORANI IN SALAIGRAMAM VILLAGE IN SALAIGRAMAM PANCHAYAT
Main Pond
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (based on standard schedule of rates vid., S.no 86 Item no.1)
Construction of Retaining Wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Construction of Bathing Ghat
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
IMPROVEMENTS OF OORANI (MAIN POND, RETAINING WALL, AND STEPS) AT VINAYAGAR KOIL OORANI IN PERUMBATCHERI PANCHAYAT
Main Pond
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (based on standard schedule of rates vid., S.no 86 Item no.1)
Construction of Retaining Wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Construction of Bathing Ghat
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
TAMILARASAN
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .