| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 CrAccepted-Finance | ₹5.1 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹5.1 CrRejected-Finance | ₹5.1 Cr | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹10.2 L
Closing Date
5 Mar 2024, 10:00 amClosed
The Executive Engineer/PIU
The Executive Engineer/PIU, RWD, Itanagar
Firm registration , Tender fee, EMD, Bank Solvency, Balance sheet of last five years by CA, GST and EPF certificate and other important document
2024_CEAR_132202_1
AR0702MRL4A
Open Tender
Civil Works - Bridge Construction
547 days
ITANAGAR
Please refer Tender documents.
9 documents required · 9 mandatory
₹15,000
In favour of Empowered officer ARRDA Itanagar
₹10.2 L
Yes
O/O EE, RWD, Itanagar
14 Mar 2024
17 Feb 2024
5 Mar 2024
17 Feb 2024
5 Mar 2024
17 Feb 2024
24 Feb 2024
Amount
Earth Excavation work in foundation
Earthwork in excavation for structures as per drawing and technical specificationsClause 305.1 including setting out, construction of shoring and bracing, removal ofstumps and other deleterious material and disposal uptoa leadof 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable materialII).Ordinary rock(not requiring blasting) upto 3.0 meter depth
Plain M15 grade Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
Concrete grade M 15 for levelling course
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications
Concrete grade M-35 in Open foundation ( With Batching Plant, Transit Mixer and Concrete Pump)
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications
M-15 Annular filling around trnches of raft
Concrete grade M-35 in Sub-structure ( With Batching Plant, Transit Mixer and Concrete Pump)
Back filling work
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 I) Granular material
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
RCC in Slab,grade M-35 (Using Batching Plant, Transit Mixer and Concrete Pump)
For solid slab super-structure, 18-28% of (a+b+c) Height 5m to 10m
For RCC T-Girders concrete, 23-33% of (a+b+c) Height 5m to 10m
Reinforcement (HYSD Bar) for Sub-structure
(Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202. (The steel to be used should be from primary producer like TATA/SAIL/ESSER STEEL/ JINDAL/SHYAM) STEEL)
Reinforcement (HYSD Bar) for Super-structure
(Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202. (The steel to be used should be from primary producer like TATA/SAIL/ESSER STEEL/ JINDAL/SHYAM) STEEL)
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, completre assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete asper drawing and approved technical specifications.
POT-PTFE Bearings
Appraoch slab
M15 PCC below approach slab (base layer)
M30 grade concrete (second layer or top layer)
RCC in Crash Barrier, Grade M-40
Expansion Ioint
Strip seal Ioints
Wearing coat
Drainage Spouts complete as per drawing and Technical specification
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Painting Two Coats on New Concrete Surfaces (Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces)
Painting of structures
Seismic Arrestor
Stone Pitching on slopes
Filter media
Routine Maintenance
First Year
Second Year
Third Year
Fourth Year
Fifth Year
Add GST @ 18%
M/s T G Construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf