GEMC-511687795871813
Awarded to SANTOSH INFRA POWER PRIVATE LIMITED
₹2.6 Cr
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| Round the clock up-keeping and maintenance of turbine and its auxiliaries of 9,10 and 11 | - | HSN not specified by seller | 24 EA | 450,996 | 10,823,904 |
| CHANGING OF GASKET OF ESV | - | HSN not specified by seller | 2 JOB | 17,346 | 34,692 |
| Chng.Transfer pipe Gasket of HPC Flange or IPC Flange | - | HSN not specified by seller | 7 EA | 519.2 | 3,634.4 |
| Complete OH of Control valve of HPC or IPC or Changing of Valves | - | HSN not specified by seller | 8 EA | 540.44 | 4,323.52 |
| Complete OH of Barring Gear. | - | HSN not specified by seller | 4 EA | 566.4 | 2,265.6 |
| Open cover of T.G. Brg 1 or 2 or 3 or 4 | - | HSN not specified by seller | 16 EA | 520.38 | 8,326.08 |
| Chng. Brg of roller of Cont Valve HPC | - | HSN not specified by seller | 5 EA | 462.56 | 2,312.8 |
| Insp and Rect of fault of Turbine Brg 1 or 2 or 3 | - | HSN not specified by seller | 12 EA | 572.3 | 6,867.6 |
| Insp and Rect of fault of Turbine Brg 4 or 5 | - | HSN not specified by seller | 8 EA | 577.02 | 4,616.16 |
| Insp and Rect of fault of Turbine Brg 6 or 7 | - | HSN not specified by seller | 8 EA | 680.86 | 5,446.88 |
| Chng. of bush in control valve. | - | HSN not specified by seller | 14 EA | 578.2 | 8,094.8 |
| Re-visioning of Cam shaft of HPC or IPC | - | HSN not specified by seller | 10 EA | 693.84 | 6,938.4 |
| Re-visioning of Cont Valve Column of HPC or IPC | - | HSN not specified by seller | 14 EA | 1,028.96 | 14,405.44 |
| Chng Thrust or Surge Pad of Brg no. 2 | - | HSN not specified by seller | 2 EA | 565.22 | 1,130.44 |
| Re-visioning of E.G.P.V. | - | HSN not specified by seller | 4 EA | 718.62 | 2,874.48 |
| Cleaning and Check of Lkg of Oil Clr of Tur | - | HSN not specified by seller | 13 EA | 1,028.96 | 13,376.48 |
| Alignment of motor of barring gear. | - | HSN not specified by seller | 6 EA | 578.2 | 3,469.2 |
| Chng. of Thrust Brg or Gear Coupling of MOP | - | HSN not specified by seller | 5 EA | 982.94 | 4,914.7 |
| OH of Pilot of servo motor of ESV or IV. | - | HSN not specified by seller | 10 EA | 578.2 | 5,782 |
| Replacement of LPC Diaphragm. | - | HSN not specified by seller | 12 EA | 1,132.8 | 13,593.6 |
| Complete OH of CVSM. | - | HSN not specified by seller | 2 EA | 578.2 | 1,156.4 |
| Complete OH of Servomotor of E.S.V or I.V. | - | HSN not specified by seller | 4 EA | 578.2 | 2,312.8 |
| Re-visioning of other Pilot Valves. | - | HSN not specified by seller | 8 EA | 578.2 | 4,625.6 |
| Cleaning of filters of main oil tank | - | HSN not specified by seller | 110 EA | 1,132.8 | 124,608 |
| OH of feedback pilot valve of CVSM | - | HSN not specified by seller | 4 EA | 578.2 | 2,312.8 |
| Removing Barring Gear for diff, exp. | - | HSN not specified by seller | 2 EA | 578.2 | 1,156.4 |
| Rep of Def oil seal or Brg of Barring gear. | - | HSN not specified by seller | 4 EA | 1,017.16 | 4,068.64 |
| Rep of Def Pinion Brg. of Barring gear. | - | HSN not specified by seller | 4 EA | 578.2 | 2,312.8 |
| OH of Main Ejector or Attending Leakage | - | HSN not specified by seller | 8 EA | 982.94 | 7,863.52 |
| Checking of tube leakage of Condenser | - | HSN not specified by seller | 30 EA | 1,040.76 | 31,222.8 |
| Cleaning of Condenser | - | HSN not specified by seller | 10 EA | 578.2 | 5,782 |
| Patch welding in L.P. Pipe up to 50 mm or Cut and Weld for joint of L.P. pipe51 to 100 mm | - | HSN not specified by seller | 140 EA | 520.38 | 72,853.2 |
| Patch welding in L.P. Pipe above 100 mm or Fab of bend from L.P. Pipe51 to 100 mm | - | HSN not specified by seller | 155 EA | 647.82 | 100,412.1 |
| Fab of bend from L.P. PipeUp to 50 mm or Cut and Weld for joint of L.P. pipe101 to 150 mm | - | HSN not specified by seller | 135 EA | 994.74 | 134,289.9 |
| Fab of bend from L.P. Pipe101 to 150 mm | - | HSN not specified by seller | 70 EA | 1,064.36 | 74,505.2 |
| Fab of bend from L.P. Pipe151 to 200 mm | - | HSN not specified by seller | 48 EA | 1,734.6 | 83,260.8 |
| Fabrication of bend SIZE- 25 to 50mm | - | HSN not specified by seller | 40 EA | 739.86 | 29,594.4 |
| Cut and Weld for joint of L.P.pipe Upto 50mm or Fabrication of bend SIZE- 51to 60mm | - | HSN not specified by seller | 140 EA | 520.38 | 72,853.2 |
| Cut and Weld for joint of L.P.pipe151 to 200mm | - | HSN not specified by seller | 50 EA | 1,734.6 | 86,730 |
| Attend flange or bonnet lkg of HP valve or HP pipe Upto50 | - | HSN not specified by seller | 72 EA | 867.3 | 62,445.6 |
| Attend flange or bonnet lkg of HP valve or HP pipe 51 to 100 | - | HSN not specified by seller | 95 EA | 867.3 | 82,393.5 |
| Attend flange or bonnet lkg of HP valve or HP pipe101 to 150 | - | HSN not specified by seller | 124 EA | 867.3 | 107,545.2 |
| Attend flange or bonnet lkg of HP valve or HP pipe151 to 200 | - | HSN not specified by seller | 81 EA | 901.52 | 73,023.12 |
| OH of by pass valve of temp control line or Patch welding work in the condenser or Hot tightening of ejector | - | HSN not specified by seller | 122 EA | 901.52 | 109,985.44 |
| Clean of filter of tur oil or H2 cooler str | - | HSN not specified by seller | 192 EA | 554.6 | 106,483.2 |
| OH of Main steam line valve i.e. V2 6 | - | HSN not specified by seller | 12 EA | 578.2 | 6,938.4 |
| OH of Feed line valve with by pass valve | - | HSN not specified by seller | 15 EA | 1,098.58 | 16,478.7 |
| OH of NRV of extraction line, ES-1 or ES-2 or IPT transfer pipe line drain valve | - | HSN not specified by seller | 38 EA | 1,040.76 | 39,548.88 |
| OH of NRV of extraction line,ES-8 or ES-11 or OH of NRV of HP drip or CEP disch line | - | HSN not specified by seller | 23 EA | 578.2 | 13,298.6 |
| OH of valve cont.to cond DW-4 or 38- 41 or CA-5 or AS-47 or AS-48 valve | - | HSN not specified by seller | 40 EA | 982.94 | 39,317.6 |
| OH of Stm throw valve to cond or iso LPH-2 | - | HSN not specified by seller | 15 EA | 578.2 | 8,673 |
| OH of Steam by pass valve V2-27 or 15 or V2-7 | - | HSN not specified by seller | 8 EA | 578.2 | 4,625.6 |
| OH of Extrac valve i.e. ES-3 or 4 or 5 or 6 or 7 or OH of Drip line gate valve HD-21or 29 or 30 or 31 | - | HSN not specified by seller | 35 EA | 982.94 | 34,402.9 |
| OH of FCNRV or isolating valveof LPH-3 or 4. | - | HSN not specified by seller | 15 EA | 578.2 | 8,673 |
| OH of Condensate throw off valve to cond | - | HSN not specified by seller | 10 EA | 578.2 | 5,782 |
| Rep of ES-9 by H.P welding tech, | - | HSN not specified by seller | 3 EA | 578.2 | 1,734.6 |
| Rep of V2-27 or 15 by H.P welding tech, | - | HSN not specified by seller | 3 EA | 578.2 | 1,734.6 |
| Rep of V2-38 or 81-84 by H.P welding tech, | - | HSN not specified by seller | 3 EA | 578.2 | 1,734.6 |
| OH of actuators of MSV-L or R | - | HSN not specified by seller | 10 EA | 982.94 | 9,829.4 |
| OH of actuators of DW-4 or 38- 41 or CA-5 or CST makeup valve or ES-3 to7 or HD-21 or HD-29 to 31 or AS 47 or 48 | - | HSN not specified by seller | 80 EA | 1,040.76 | 83,260.8 |
| OH of Actrs of V2-38 or 81-84 or 27 or 15 or V2-7 or steam iso valve LPH-3 or 4 | - | HSN not specified by seller | 25 EA | 1,028.96 | 25,724 |
| OH of Actrs of Butterfly valve | - | HSN not specified by seller | 30 EA | 578.2 | 17,346 |
| OH and Re-visioning of LPH-2 to LPH-4 or GC-I or GC-II or LPH-1A or LPH-1B | - | HSN not specified by seller | 41 EA | 1,040.76 | 42,671.16 |
| OH of gauge glass of LPH or Gc or Ejc or Dea o rCON | - | HSN not specified by seller | 14 EA | 1,040.76 | 14,570.64 |
| Tight. of flange of CRH or GC-I or II or LPH | - | HSN not specified by seller | 25 EA | 1,040.76 | 26,019 |
| Overhauling of DSS of Aux., PRDS-II | - | HSN not specified by seller | 15 EA | 578.2 | 8,673 |
| Overhauling of Main flash tank | - | HSN not specified by seller | 6 EA | 578.2 | 3,469.2 |
| Overhauling of Aux Flash tank | - | HSN not specified by seller | 6 EA | 578.2 | 3,469.2 |
| Repair or replacement of broken hanger. | - | HSN not specified by seller | 60 EA | 925.12 | 55,507.2 |
| Tightening of loose hangers. | - | HSN not specified by seller | 60 EA | 925.12 | 55,507.2 |
| Attend the flange leakage of CRH Line. | - | HSN not specified by seller | 15 EA | 578.2 | 8,673 |
| Serv of hydr. brake of Chit or Gar Crane | - | HSN not specified by seller | 5 EA | 578.2 | 2,891 |
| Chk and Grs. of brg,cplg,chang bush of bolt or Serv of greep brake of Chit or Garlic Crane or sevicing Servicing of all the wheel of Garlic or Chitram crane and plate | - | HSN not specified by seller | 15 EA | 578.2 | 8,673 |
| OH of small hook of chit or Garlic Crane or OH main hook | - | HSN not specified by seller | 10 EA | 578.2 | 5,782 |
| Serv.of all gear boxes of Chit or Gar Crane | - | HSN not specified by seller | 5 EA | 578.2 | 2,891 |
| Check and clean of wire rope drum or bearing | - | HSN not specified by seller | 5 EA | 578.2 | 2,891 |
| OH of DSS of Aux. PRDS | - | HSN not specified by seller | 25 EA | 2,312.8 | 57,820 |
| Cut and weld and repl of LP Valve Up to 50 mm | - | HSN not specified by seller | 145 EA | 578.2 | 83,839 |
| Cut and weld and rep of L.P. Valve51 to 100mm | - | HSN not specified by seller | 25 EA | 578.2 | 14,455 |
| Cut and weld and rep of L.P.Valve101 to 150mm | - | HSN not specified by seller | 15 EA | 578.2 | 8,673 |
| OH of isolating or Bypass valve of PCV 5 or 14 or 17 | - | HSN not specified by seller | 35 EA | 1,040.76 | 36,426.6 |
| OH of valve contd to dea at 13 mtr V2-21 or CST makup valve | - | HSN not specified by seller | 25 EA | 578.2 | 14,455 |
| OH of suc valve of BFP or Disch valve of CEP | - | HSN not specified by seller | 15 EA | 578.2 | 8,673 |
| OH of suction valve of CEP or MC-18-25 or 33 or 37 or OH of U Bend valve | - | HSN not specified by seller | 50 EA | 578.2 | 28,910 |
| Fab of reducer for HP Drip 218-80 or 168-80 | - | HSN not specified by seller | 25 EA | 1,040.76 | 26,019 |
| Rep of reducer of H.P Drip line | - | HSN not specified by seller | 25 EA | 925.12 | 23,128 |
| LPH drain line valve HD-8 or 9 or 14-19 or 20 | - | HSN not specified by seller | 25 EA | 578.2 | 14,455 |
| Check and rect of internal fault of dea | - | HSN not specified by seller | 10 EA | 578.2 | 5,782 |
| Blanking of CRH line for Reheater HT | - | HSN not specified by seller | 15 EA | 1,156.4 | 17,346 |
| Rem chocking oil drain of brg1 or 2 of tur. | - | HSN not specified by seller | 8 EA | 578.2 | 4,625.6 |
| Rem chocking of drain of cntg. machine. | - | HSN not specified by seller | 8 EA | 1,156.4 | 9,251.2 |
| Repl of damaged NRV of PCV-14 or 17 Size200 | - | HSN not specified by seller | 4 EA | 578.2 | 2,312.8 |
| Repl of damaged NRVof feed line Size-250 | - | HSN not specified by seller | 4 EA | 578.2 | 2,312.8 |
| OH of butterfly valve of condenser | - | HSN not specified by seller | 15 EA | 578.2 | 8,673 |
| Hot tightening of cross over pipe | - | HSN not specified by seller | 15 EA | 578.2 | 8,673 |
| OH of HP heater and attend of flange lkg. | - | HSN not specified by seller | 10 EA | 1,156.4 | 11,564 |
| Attending the shell joint of HPH | - | HSN not specified by seller | 12 EA | 578.2 | 6,938.4 |
| Attend the spot lkg of HPH shell joint. | - | HSN not specified by seller | 20 EA | 578.2 | 11,564 |
| OH of Safety valve of flange or stud heatng or LP heater or HP heater or CBD tank | - | HSN not specified by seller | 40 EA | 578.2 | 23,128 |
| OH of Safety valve of warm up line | - | HSN not specified by seller | 14 EA | 578.2 | 8,094.8 |
| OH of Safety valve of aux PRDS or deaerator or OH of NRV of Aux RPDS heat line to FST | - | HSN not specified by seller | 31 EA | 578.2 | 17,924.2 |
| OH of NRV V2-52 or V2-53 or V2-80 | - | HSN not specified by seller | 54 EA | 578.2 | 31,222.8 |
| OH of NRV of re-circulation line of BFP or spindle leak off line | - | HSN not specified by seller | 54 EA | 578.2 | 31,222.8 |
| OH of H.P. Valve and NRV. | - | HSN not specified by seller | 24,400 MM | 6.94 | 169,336 |
| OH of H.P. Steam drain line valve. | - | HSN not specified by seller | 80 EA | 1,156.4 | 92,512 |
| Rep of NRV of HPH drip to deaerator | - | HSN not specified by seller | 15 EA | 578.2 | 8,673 |
| Welding of crack in HPH or CRH pipe line | - | HSN not specified by seller | 21 EA | 578.2 | 12,142.2 |
| Fab of bend for re-circulation line or OH of group protection valve i.e. FW-1 | - | HSN not specified by seller | 28 EA | 2,312.8 | 64,758.4 |
| Fab of bend for HPH drip line con to dea | - | HSN not specified by seller | 24 EA | 1,098.58 | 26,365.92 |
| Fab of bend of LPH drip to drip pump or condenser | - | HSN not specified by seller | 10 EA | 578.2 | 5,782 |
| Rep of bend of HPH drip line con to dea | - | HSN not specified by seller | 17 EA | 578.2 | 9,829.4 |
| Rep of bend of RC line con to dea or OH of feed pump energy absorber. | - | HSN not specified by seller | 27 EA | 578.2 | 15,611.4 |
| Rep of bend of LPH drip to drip pump or condenser | - | HSN not specified by seller | 10 EA | 578.2 | 5,782 |
| Cutting and welding of H.P. Valve 15 to 50mm | - | HSN not specified by seller | 96 EA | 1,156.4 | 111,014.4 |
| Cutting and welding of H.P.Valve 51 to 100mm | - | HSN not specified by seller | 18 EA | 578.2 | 10,407.6 |
| Cutting and welding of H.P.Valve101 to 300mm or OH of PCV 10 | - | HSN not specified by seller | 19 EA | 578.2 | 10,985.8 |
| Rem of chocking of shell or coil drn of HPH | - | HSN not specified by seller | 15 EA | 1,156.4 | 17,346 |
| OHof LCV3-12 or 15 or PCV5 or 14 or 16 or 17 TCV8 or 10-12 | - | HSN not specified by seller | 30 EA | 1,156.4 | 34,692 |
| Cut or weld of joint of H.P. Pipe15 to 50mm | - | HSN not specified by seller | 160 EA | 578.2 | 92,512 |
| Cut or weld of joint of H.P. Pipe51 to100mm | - | HSN not specified by seller | 160 EA | 578.2 | 92,512 |
| Fab of bend 63.5 X 5.5mm with jacketing | - | HSN not specified by seller | 90 EA | 578.2 | 52,038 |
| Overhauling of L.P. valve or LP NRV | - | HSN not specified by seller | 60,000 MM | 4.63 | 277,800 |
| Overhauling of LP by pass valve. | - | HSN not specified by seller | 4 EA | 578.2 | 2,312.8 |
| Overhauling of HP by pass valve. | - | HSN not specified by seller | 2 EA | 578.2 | 1,156.4 |
| Overhauling of HP or LP by pass spray valve | - | HSN not specified by seller | 5 EA | 578.2 | 2,891 |
| Changing of Mech. Seal BFP Booster Pumps DE or NDE | - | HSN not specified by seller | 12 JOB | 1,040.76 | 12,489.12 |
| Re-visioning and checking of working oil or Lube oil cooler | - | HSN not specified by seller | 16 JOB | 578.2 | 9,251.2 |
| Re-visioning and Tube Leakage SW | - | HSN not specified by seller | 8 JOB | 578.2 | 4,625.6 |
| Re-visioning and Checking BCW or SWC | - | HSN not specified by seller | 12 JOB | 578.2 | 6,938.4 |
| Replacement of inside Stator Assy | - | HSN not specified by seller | 5 EA | 578.2 | 2,891 |
| Inspection or Rectification of fault of BFP NDE or DE Bearing | - | HSN not specified by seller | 16 EA | 925.12 | 14,801.92 |
| Rectification of fault of BFP Motor NDE or DE Bearings | - | HSN not specified by seller | 16 JOB | 578.2 | 9,251.2 |
| Complete OH of Drip pump | - | HSN not specified by seller | 5 JOB | 578.2 | 2,891 |
| OH of CW Booster Pump or H2 gas cooling pump | - | HSN not specified by seller | 13 JOB | 578.2 | 7,516.6 |
| Alignment of Motor of CW Booster | - | HSN not specified by seller | 6 JOB | 578.2 | 3,469.2 |
| Re-adjustment of Bearing | - | HSN not specified by seller | 5 JOB | 578.2 | 2,891 |
| inspection of fault of Drip Pump | - | HSN not specified by seller | 12 JOB | 578.2 | 6,938.4 |
| Overhauling of BCW or HW or SW or SWC Pump | - | HSN not specified by seller | 31 JOB | 925.12 | 28,678.72 |
| Overhauling of Phosphate Dosing Pump | - | HSN not specified by seller | 8 JOB | 578.2 | 4,625.6 |
| OH of Hydrazine pumps or Re-visioning of Suction filter | - | HSN not specified by seller | 18 JOB | 1,040.76 | 18,733.68 |
| Re-visioning of thrustpad of BFP | - | HSN not specified by seller | 7 JOB | 578.2 | 4,047.4 |
| Alignment of B.F.P. with Hydraulic Cplg | - | HSN not specified by seller | 10 JOB | 578.2 | 5,782 |
| Shifting of condensate pump without modification | - | HSN not specified by seller | 5 JOB | 578.2 | 2,891 |
| Shifting of condensate pump2 with modification | - | HSN not specified by seller | 5 JOB | 578.2 | 2,891 |
| Fabrication of Compensator Suction | - | HSN not specified by seller | 5 JOB | 578.2 | 2,891 |
| Fitting of compensator in suction line | - | HSN not specified by seller | 5 EA | 578.2 | 2,891 |
| Inspection of Fault of CEP Bearing | - | HSN not specified by seller | 17 JOB | 763.46 | 12,978.82 |
| Complete Overhauling of CEP | - | HSN not specified by seller | 11 JOB | 925.12 | 10,176.32 |
| Cleaning of strainer of Cond. Pumps. | - | HSN not specified by seller | 16 JOB | 739.86 | 11,837.76 |
| Replacement of BFP LO or WO or SW cooler | - | HSN not specified by seller | 7 EA | 578.2 | 4,047.4 |
| Overhauling of air washer blower | - | HSN not specified by seller | 10 JOB | 578.2 | 5,782 |
| Overhauling of air washer pump | - | HSN not specified by seller | 10 JOB | 578.2 | 5,782 |
| Tanks cleaning | - | HSN not specified by seller | 8 JOB | 578.2 | 4,625.6 |
| Cleaning of working oil cooler of BFP | - | HSN not specified by seller | 48 JOB | 739.86 | 35,513.28 |
| Cleaning of lub oil cooler of BFP | - | HSN not specified by seller | 48 JOB | 739.86 | 35,513.28 |
| Matching of thrust collar | - | HSN not specified by seller | 8 JOB | 578.2 | 4,625.6 |
| Replacement of AOP oil seal | - | HSN not specified by seller | 10 JOB | 578.2 | 5,782 |
| Replacement of damaged coupling bush | - | HSN not specified by seller | 18 JOB | 578.2 | 10,407.6 |
| Replacement of damage nipple of BFP | - | HSN not specified by seller | 12 JOB | 578.2 | 6,938.4 |
| Priming of AOP or Attending oil leakage | - | HSN not specified by seller | 34 JOB | 578.2 | 19,658.8 |
| Changing of plunger | - | HSN not specified by seller | 20 JOB | 578.2 | 11,564 |
| Filling gland in Phosphate or Hydrazene | - | HSN not specified by seller | 18 JOB | 925.12 | 16,652.16 |
| Cleaning of cooling oil line | - | HSN not specified by seller | 10 JOB | 578.2 | 5,782 |
| Removal of chocking of BCW line of CEP | - | HSN not specified by seller | 9 JOB | 578.2 | 5,203.8 |
| Cleaning of make up oil storage tank | - | HSN not specified by seller | 6 JOB | 578.2 | 3,469.2 |
| Replacement of damage flange | - | HSN not specified by seller | 12 JOB | 578.2 | 6,938.4 |
| Alignment of motor of air washer pump or fan or SOP | - | HSN not specified by seller | 13 JOB | 578.2 | 7,516.6 |
| Alignment of AC or DC Lub Oil Pump | - | HSN not specified by seller | 8 EA | 578.2 | 4,625.6 |
| Replacement of bearing of Hydr Coupling | - | HSN not specified by seller | 83 JOB | 578.2 | 47,990.6 |
| COMPLETE OH OF HYDRAULIC COUPLING | - | HSN not specified by seller | 10 JOB | 578.2 | 5,782 |
| REPLACEMENT or RE-VISIONING OF MOP or AOP | - | HSN not specified by seller | 24 JOB | 578.2 | 13,876.8 |
| REVISIONING AND CHECKING of control block scoop tube | - | HSN not specified by seller | 18 EA | 578.2 | 10,407.6 |
| Cleaning of cooling line of B.F.P.B PU or drip Pumps | - | HSN not specified by seller | 20 JOB | 578.2 | 11,564 |
| Re-visioning and checking of wire mesh | - | HSN not specified by seller | 7 EA | 578.2 | 4,047.4 |
| Overhauling of Boiler Feed Pump upto balancing Disc | - | HSN not specified by seller | 6 JOB | 578.2 | 3,469.2 |
| Changing of Mech. Seal of BFP-S.S | - | HSN not specified by seller | 6 EA | 578.2 | 3,469.2 |
| Changing of Mech. Seal of BFP-D.E | - | HSN not specified by seller | 4 EA | 578.2 | 2,312.8 |
| OH of Boiler Feed Booster Pump | - | HSN not specified by seller | 9 JOB | 1,156.4 | 10,407.6 |
| Alignment of Motor of boiler Feed booster | - | HSN not specified by seller | 9 JOB | 1,156.4 | 10,407.6 |
| Alignment of Motor of Drip Pump | - | HSN not specified by seller | 7 JOB | 1,156.4 | 8,094.8 |
| Alignment of Motor of H2 | - | HSN not specified by seller | 6 JOB | 578.2 | 3,469.2 |
| Alignment of Motor of B.C.W. or HW or SWC or SW Pump | - | HSN not specified by seller | 27 JOB | 1,156.4 | 31,222.8 |
| Rectification of fault of bearings of BFP booster | - | HSN not specified by seller | 8 JOB | 1,156.4 | 9,251.2 |
| OH of Centrifuging MC Pump | - | HSN not specified by seller | 10 JOB | 1,156.4 | 11,564 |
| Straightening of condensate pump shaft | - | HSN not specified by seller | 7 JOB | 578.2 | 4,047.4 |
| Replacement of Drip pump | - | HSN not specified by seller | 6 JOB | 578.2 | 3,469.2 |
| Cleaning of filter of AOP | - | HSN not specified by seller | 256 JOB | 1,156.4 | 296,038.4 |
| Decoupling and coupling of motor of CEP or attending gland leakage of CEP | - | HSN not specified by seller | 48 JOB | 1,040.76 | 49,956.48 |
| Attending gland leakage of Drip pump | - | HSN not specified by seller | 30 JOB | 1,040.76 | 31,222.8 |
| Cleaning of filters of phosphate or Hydrazene | - | HSN not specified by seller | 17 JOB | 578.2 | 9,829.4 |
| Replacement of damage coupling of AOP or Cleaning of Suction Filter of Air washer | - | HSN not specified by seller | 52 JOB | 578.2 | 30,066.4 |
| Rectification of foundation base or Rectification of coupling of small pump | - | HSN not specified by seller | 20 JOB | 578.2 | 11,564 |
| ALIGNMENT OF HYDRAULIC COUPLING | - | HSN not specified by seller | 12 JOB | 578.2 | 6,938.4 |
| Re-visioning of seal water cooler | - | HSN not specified by seller | 4 JOB | 578.2 | 2,312.8 |
| OH of OSU of HP or LP system | - | HSN not specified by seller | 2 EA | 578.2 | 1,156.4 |
| Clean of BCW cooing line of BFP Bstr or Chang labyrinth seal of BFP motor brg | - | HSN not specified by seller | 47 EA | 1,156.4 | 54,350.8 |
| Trans of spares from CSD to S store of TMD-I | - | HSN not specified by seller | 24 EA | 578.2 | 13,876.8 |
| Loading and Unloding and transp of Material of TMD-II | - | HSN not specified by seller | 240 JOB | 433.65 | 104,076 |
| Round the clock routine and preventive maintenance works of Turbine and its auxiliaries of unit no. 12, 13 and CW Pump | - | HSN not specified by seller | 2,190 JOB | 4,701.92 | 10,297,204.8 |