| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.5 LAdmitted-Finance | ₹56.5 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | pyarelal galar L1 |
|---|---|---|---|---|
| 0.00GENERAL SUMMARY | ||||
| 1.00Lump sum price worked out by the contractor against Schedule ‘A’ Part- I (BUILDING WORKS) for the following building works:- | ||||
| 1.01 | (a) Lump sump amount worked out by the contractor for Design, development of structural drawings as per the architectural drawing Nos CWE/ARCH/33/2025 Sheet No. 1R/2, CWE/ARCH/33/2025 Sheet No. 2R/2 and Construction of Obsn Post at 5000M & 7000M, 2 X rest room with Toilet facility, 2 X OP Post 3 storey, 2 X Staircase (GF) and 2 X Staircase (FF to TF) as per architectural drawings, structural drawing, TD drawings, schedule of finishes & given specifications built in permanent specification with RCC frames construction including ATT, WPT mosquito proofing with OBD finishing ceramic tile flooring, etc complete all as specified and as directed.
NOTE:- The structural design and drawing shall be got vetted from any IITs/NITs before execution of work by the contractor. | 1 | Block | 49,40,000 ₹49,40,000 Lowest |
| 2.00 | Lump sum price worked out by the contractor for EXCAVATION AND EARTH WORK as listed in Schedule ‘A’ Part- II (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 33,205 ₹33,205 Lowest |
| 3.00 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part-III (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,11,175 ₹1,11,175 Lowest |
| 4.00 | Lump sum price worked out by the contractor for ROADS/PATH/CULVERTS WORKS as listed in Schedule ‘A’ Part-IV (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 62,135 ₹62,135 Lowest |
| 5.00 | Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS as listed in Schedule ‘A’ Part- V (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 40,407 ₹40,407 Lowest |
| 6.00 | Lump sum price worked out by the contractor for SECURITY FENCING WORKS as listed in Schedule ‘A’ Part- VI (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 3,46,965 ₹3,46,965 Lowest |
| 7.00SCH 'A' Pt - VII (MISCELLANEOUS PARTS) | ||||
| 7.01 | S & F Modular Fan step regulator , 240 Volts 1/2 module complete. with cover plate complete all as specified and directed. | 4 | Each | 225 ₹900 Lowest |
Tender Value
₹46.5 L
EMD Value
₹93,060
Closing Date
13 Aug 2026, 6:00 pmClosed
Col Pawan Kumar, CWE
Headquarters, Commander Works Engineer, Bhopal, Military Engineer Services, SI Line, Bhopal, Pin Code - 462001 (Madhya Pradesh)
PROVN OF OBSERVATION POST AT 5000 METRE AND 7000 METRE ALONGWITH GUARD POST AT FIRING RANGE CPE ITARSI UNDER GE BHOPAL
2026_MES_748115_6
84151/E8
Open Tender
Civil Works
Item Rate
365 days
Bhopal
AS PER NIT CONDITION
7 documents required · 7 mandatory
₹500
Yes
GE Bhopal
₹93,060
Yes
24 Aug 2026
21 Jul 2026
15 Aug 2026
21 Jul 2026
13 Aug 2026
27 Jul 2026
21 Jul 2026 - 27 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0GENERAL SUMMARY | |||||
| 1Lump sum price worked out by the contractor against Schedule ‘A’ Part- I (BUILDING WORKS) for the following building works:- | |||||
| 1.01 | (a) Lump sump amount worked out by the contractor for Design, development of structural drawings as per the architectural drawing Nos CWE/ARCH/33/2025 Sheet No. 1R/2, CWE/ARCH/33/2025 Sheet No. 2R/2 and Construction of Obsn Post at 5000M & 7000M, 2 X rest room with Toilet facility, 2 X OP Post 3 storey, 2 X Staircase (GF) and 2 X Staircase (FF to TF) as per architectural drawings, structural drawing, TD drawings, schedule of finishes & given specifications built in permanent specification with RCC frames construction including ATT, WPT mosquito proofing with OBD finishing ceramic tile flooring, etc complete all as specified and as directed.
NOTE:- The structural design and drawing shall be got vetted from any IITs/NITs before execution of work by the contractor. | 1 | Block | - | - |
| 2 | Lump sum price worked out by the contractor for EXCAVATION AND EARTH WORK as listed in Schedule ‘A’ Part- II (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 33,301.46 | ₹33,301.46 |
| 3 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part-III (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,21,272.82 | ₹1,21,272.82 |
| 4 | Lump sum price worked out by the contractor for ROADS/PATH/CULVERTS WORKS as listed in Schedule ‘A’ Part-IV (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 64,135.44 | ₹64,135.44 |
| 5 | Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS as listed in Schedule ‘A’ Part- V (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 41,407.69 | ₹41,407.69 |
| 6 | Lump sum price worked out by the contractor for SECURITY FENCING WORKS as listed in Schedule ‘A’ Part- VI (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 3,56,964.52 | ₹3,56,964.52 |
| 7SCH 'A' Pt - VII (MISCELLANEOUS PARTS) | |||||
| 7.01 | S & F Modular Fan step regulator , 240 Volts 1/2 module complete. with cover plate complete all as specified and directed. | 4 | Each | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.31 MB
Revdrawings.pdf
Additional Documents • 5.03 MB
84151PrepricedSch.pdf
Additional Documents • 0.31 MB
BOQ_873648.xls
BOQ • 0.23 MB
84151TenderDocuments.pdf
Tender Documents • 1.53 MB
Amendment.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .