| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.5 CrAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹16.9 Cr+₹35.8 L (2.17%)Rejected-Finance | L2 | Rejected-Finance rejected | |
| 3 | L3₹21.5 Cr+₹5.0 Cr (30.2%)Rejected-Finance NA | L3 | Rejected-Finance rejected |
Tender Value
₹25.0 Cr
EMD Value
₹49.9 L
Closing Date
25 Aug 2025, 5:00 pmClosed
Chief Engineer PMGSY (JKRRDA) Jammu
Office of The Chief Engineer PMGSY(JKRRDA) Jammu at 1st Floor, Mechanical Engineering Department (MED) Complex University Road Jammu
Construction and Maintenance of Road from L096-(Link road)Kandli to Ashla via Fagwal, Package No. JK19-4202, PMGSY-IV, Batch-I of 2025-26, Block-Rajgarh, District Ramban (Using Waste Plastic) Length-8.400 Kms
2025_JKRRD_143672_1
JK194202
Open Tender
Civil Works - Roads
Percentage
630 days
Rajgarh
Please refer Tender documents.
8 documents required · 8 mandatory
₹20,000
₹49.9 L
Office of The Chief Engineer PMGSY (JKRRDA) Jammu
8 Dec 2025
4 Aug 2025
27 Aug 2025
4 Aug 2025
25 Aug 2025
6 Aug 2025
5 Aug 2025 - 6 Aug 2025
5 Aug 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in Hilly Roads:- Excavation in all kinds of soil, Ordinary Rock & Hard Rock, by mechanical means including cutting and trimming of side slopes & disposing of Excavated earth with all lift and leads as directed for safe disposal of un-serviceable/surplus material without damaging private/public property As per Technical specification clause 1603.1. and 1603.2 . | 1,47,201.96 | Cum | 210.99 | ₹3,10,58,141.54 |
| 2 | Disposal of excavated Mulba from the site by mechanical transport including loading/unloading complete for safe disposal without damaging the public/pvt. Property as per instructions of the engineer incharge at site. | 34,765.44 | Cum | 118.36 | ₹41,14,837.48 |
| 3 | Excavation for Structures:- Earthwork in excavation for structures in all kinds of soil, Ordinary Rock and hard rock as per drawings and Technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposing of surplus, un-serviceable Excavated earth as directed at site for safe disposal of same without damaging private/public property, dressing of sides and bottom and backfilling in trenches with excavated suitable material including de watering if required. | 14,167.19 | Cum | 598.56 | ₹84,79,913.25 |
| 4 | Providing and laying of plain cement concrete of Grade M-10 in open foundations complete as per drawings and Technical specifications. Clause 802, 803, 1202 & 1203. including all leads, lifts and carriages of materials by MT complete. | 1,481.86 | Cum | 5,818.37 | ₹86,22,009.77 |
| 5 | Providing and laying of plain cement concrete of Grade M-15 in open foundation complete as per drawings & Technical specification Clauses 802, 803, 1202 & 1203. Including cost of curing and form work, all leads, lifts and carriages of materials by MT complete. | 1,156.07 | Cum | 5,840.57 | ₹67,52,107.76 |
| 6 | Providing and laying of plain cement concrete of Grade M-15 in substructure complete as per drawings & Technical specification Clauses 802, 804, 805, 806, 807, 1202 & 1204. Including cost of curing and form work, all leads, lifts and carriages of materials by MT complete. | 1,367.25 | Cum | 6,240.91 | ₹85,32,884.2 |
| 7 | Providing and laying of plain Cement concrete of Grade M-20 in open foundations complete as per drawings & Technical specification Clauses 802, 803,1202 & 1203. Including cost of curing, form work , all leads, lifts and carriages of materials by MT complete. | 75 | Cum | 6,356.89 | ₹4,76,766.75 |
| 8 | Providing and laying of plain Cement concrete of Grade M-20 in Sub-Structure complete as per drawings & Technical specification Clauses 802, 804, 805, 806, 807, 1202 & 1204. Including cost of curing, form work , all leads, lifts and carriages of materials by MT complete. | 35.34 | Cum | 6,798.57 | ₹2,40,261.46 |
| 9 | Providing and laying reinforced cement concrete of Grade M-20 in Substructure complete as per drawings & Technical specification Clauses 802, 804, 805, 806, 807, 1202 & 1204. Including cost of curing ,and form work , all leads, lifts and carriages of materials by MT complete. | 62.4 | Cum | 7,071.15 | ₹4,41,239.76 |
| 10 | Providing and laying reinforced cement concrete of Grade M-25 in super structures complete as per drawings & Technical specification Clauses 800, 1205.4 & 1205.5 . Including cost of curing and form work , all leads, lifts and carriages of materials by MT complete. | 11 | Cum | 7,899.17 | ₹86,890.87 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
BOQ_222878.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .