Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹84.8 L
EMD Value
₹84,900
Closing Date
24 Mar 2020, 3:00 pmClosed
Project Director, DRDA
DRDA, Collectorate Campus, Vengikkal, Tiruvannamalai
Renovation of Ponds/ Ooranies in Package No.201 Tiruvannamalai Block of Tiruvannamalai District under State Finance Commission Grant for the year 2019-20
2020_RDTN_159103_1
Roc.No.A5/6726/2019 Dt.14.02.2020 201
Open Tender
Civil Works - Water Works
Lump-sum
180 days
Tiruvannamalai
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹84,900
22 Jun 2020
24 Feb 2020
24 Mar 2020
24 Feb 2020
24 Mar 2020
24 Feb 2020
Amount
Part 1 : Renovation of Chillikuttikulam at Thalayampallam
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Colour Washing with best Distembering two Coats in to primer coat and two coats with oil bound distember over cement plasterd surface ceiling and other new surface and including clearing, preparing the surface and etc.,complete
Provision for Name Board
Part 2 : Renovation of Sakkarathamadai kuttai at Thalayampallam
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Colour Washing with best Distembering two Coats in to primer coat and two coats with oil bound distember over cement plasterd surface ceiling and other new surface and including clearing, preparing the surface and etc.,complete
Provision for Name Board
Part 3 : Renovation of Kakka Kuttai at Kandiyakuppam
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Colour Washing with best Distembering two Coats in to primer coat and two coats with oil bound distember over cement plasterd surface ceiling and other new surface and including clearing, preparing the surface and etc.,complete
Provision for Name Board
Part 4 : Renovation of Nallathanneer Kulam at T. Kalleri
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Colour Washing with best Distembering two Coats in to primer coat and two coats with oil bound distember over cement plasterd surface ceiling and other new surface and including clearing, preparing the surface and etc.,complete
Provision for Name Board
Part 5 : Renovation of Kannimar Kulam at Melkachirapattu
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Colour Washing with best Distembering two Coats in to primer coat and two coats with oil bound distember over cement plasterd surface ceiling and other new surface and including clearing, preparing the surface and etc.,complete
Provision for Name Board
Part 6 : Renovation of Pillayar Kovil Kulam at Ayyampalayam
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Colour Washing with best Distembering two Coats in to primer coat and two coats with oil bound distember over cement plasterd surface ceiling and other new surface and including clearing, preparing the surface and etc.,complete
Provision for Name Board
Part 7. : Renovation of Rayappan Kulam at Nariyapattu
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Colour Washing with best Distembering two Coats in to primer coat and two coats with oil bound distember over cement plasterd surface ceiling and other new surface and including clearing, preparing the surface and etc.,complete
Provision for Name Board
Part 8 : Renovation of Nariyapattu Kulam at Nariyapattu
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Colour Washing with best Distembering two Coats in to primer coat and two coats with oil bound distember over cement plasterd surface ceiling and other new surface and including clearing, preparing the surface and etc.,complete
Provision for Name Board
Part 9 : Renovation of Sevidan Kulam at Thenmathur
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Colour Washing with best Distembering two Coats in to primer coat and two coats with oil bound distember over cement plasterd surface ceiling and other new surface and including clearing, preparing the surface and etc.,complete
Provision for Name Board
Part 10 : Renovation of Ellaikuttai Kulam at Thatchampattu
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Colour Washing with best Distembering two Coats in to primer coat and two coats with oil bound distember over cement plasterd surface ceiling and other new surface and including clearing, preparing the surface and etc.,complete
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
badhraconstructions
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .