| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.3 LAdmitted-Finance NO 2 104 VEMBANOOR MULANGUDI POST KUDAVASAL TALUK THIRUVARUR DISTRICT | ₹45.3 L | L1 | Admitted-Finance |
| 2 | L2₹45.7 LAdmitted-Finance | ₹45.7 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RAVIKUMAR B L2 | KALAI CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) soecification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 427 | M3 | 3,500 ₹14,94,500 | 3,491 ₹14,90,657 |
| 2.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications | 2,842 | M2 | 90 ₹2,55,780 | 86 ₹2,44,412 |
| 3.00 | Providing and laying tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications | 2,842 | M2 | 25 ₹71,050 | 20 ₹56,840 |
| 4.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 143 | M3 | 11,800 ₹16,87,400 | 11,750 ₹16,80,250 |
| 5.00 | Providing and laying Bituminous Concrete to 40mm thick using 0.13 cum of 19.00 - 9.50mm graded metal, 0.17cum of 9.50 -2.36mm graded metal and 0.26cum of 2.36 and below metal by adding the shreadded plastic 10% of bitumen quality 5.03kg (collected from municipal garbage plastic waste storage godown at free of cost) (50.30x10% = 5.03kg) shreadded plastic waste over the aggregate heated to 170 degree celcious in the central hot mix plant mixed well with 45.27 kgs of hot bitumen VG 30 Bitumen (160 degree celcious) 60/70 grade for premixing per 10sqm to lay 30mm compacted thick of bituminous concrete including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. | 86 | m3 | 12,300 ₹10,57,800 | 12,275 ₹10,55,650 |
Tender Value
₹54 L
EMD Value
₹54,000
Closing Date
5 Mar 2026, 3:00 pmClosed
Koothanallur Municipality
The Commissioner Koothanallur Municipality
Providing of BT Surface of using paver machine at Abdul Kalam Road 101006S059 Abdul Kalam Road 101006S060 Abdul Kalam Road 101006S061 Abdul Kalam Road 101006S062 MASJIDYA 2ND CROSS 101021S097 JAVIYA STREET CROSS 101019R168 in Koothanallur Municipalit
2026_MAWS_667738_1
1073/2025/E1
Open Tender
Civil Works
90 days
Koothanallur Municipality
Providing of BT Surface of using paver machine at Abdul Kalam Road 101006S059 Abdul Kalam Road 101006S060 Abdul Kalam Road 101006S061 Abdul Kalam Road 101006S062 MASJIDYA 2ND CROSS 101021S097 JAVIYA STREET CROSS 101019R168 in Koothanallur Municipalit
3 documents required · 3 mandatory
₹0
₹54,000
Yes
Koothanallur Municipality
5 Mar 2026
27 Feb 2026
5 Mar 2026
27 Feb 2026
5 Mar 2026
27 Feb 2026
27 Feb 2026 - 5 Mar 2026
2 Mar 2026
Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) soecification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications
Providing and laying tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete to 40mm thick using 0.13 cum of 19.00 - 9.50mm graded metal, 0.17cum of 9.50 -2.36mm graded metal and 0.26cum of 2.36 and below metal by adding the shreadded plastic 10% of bitumen quality 5.03kg (collected from municipal garbage plastic waste storage godown at free of cost) (50.30x10% = 5.03kg) shreadded plastic waste over the aggregate heated to 170 degree celcious in the central hot mix plant mixed well with 45.27 kgs of hot bitumen VG 30 Bitumen (160 degree celcious) 60/70 grade for premixing per 10sqm to lay 30mm compacted thick of bituminous concrete including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
Tendernotice_2.pdf
PDF • 1.28 MB
BOQ_802196.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid