Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹1.5 Laccepted-finance | ₹1.5 L | accepted-finance |
Tender Value
₹2.0 L
EMD Value
₹5,005
Closing Date
22 Jan 2026, 10:00 pmClosed
Directorate of Municipal Administration
Construction of Deck slab and installation of covering slab near Narasimhamurthy house Mahalakshminagar ward no 02 TCC limits
255477
DMA/2025-26/RD/WORK_INDENT53396
Open
Roads
DMA City Corporation Tumakuru
3 documents required · 3 mandatory
₹500
₹5,005
22 Jan 2026
7 Jan 2026
14 Jan 2026
Construction of Deck slab and installation of covering slab near Narasimhamurthy house Mahalakshminagar ward no 02 TCC limits
Dismantling of Structures - Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, inc...
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating Each depos...
Providing and laying 100mm thick pre-cast cover slabs over drains & Rain pit of width not exceeding 800 mm using M20 concrete reinforced with Micro Alloyed High carbon steel with 3mm - 3ply ...
Addendum I Percentage Additionalities for Formwork,Centering & Scaffolding
Consider 35% of item concrete rate for Drain walls(rate=6221*35%)
As per the Recommendation of Technical working group rates for formwork shall be added on percentage basis to the finished concrete item rate.
Consider 5% of item concrete rate for drain bed...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KW1 53396.doc
Tender Document • 0.31 MB
Download all tender documents and submit your bid